Japanese Nuclear Accident And U.S. Response May 17, 2011.

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Fukushima Nuclear Disaster Moneer Aljawad, Abdulrahman Alshodokhi, Jericho Alves, Daniel Chief, Benjamin Kurtz, Travis Moore September 16, 2013.
Protecting the Public, Astronauts and Pilots, the NASA Workforce, and High-Value Equipment and Property Mission Success Starts With Safety “September 11th.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Presented by: Muhammad Ayub Pakistan Nuclear Regulatory Authority Safety Enhancement at Nuclear Power Plants in Pakistan Prospects of Nuclear Energy in.
Assessing the Challenges Resulting from the Events at Fukushima Daiichi Nuclear Power Station A Preliminary Discussion March 25, 2011 Walter L. Kirchner.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Safety Implications of the Fukushima Nuclear Accident Sheldon L. Trubatch, Ph.D., J.D. Vice-Chairman Arizona Section American Nuclear Society.
ANS RESPONSE TO FUKUSHIMA LESSONS LEARNED Presented to: NESCC November 29, 2012 Washington D.C. Donald J. Spellman, Chair ANS Standards Board American.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
The Harnessed Atom Lesson Eight Concerns. What concerns do people have about nuclear power plants: Safety at nuclear power plants – Design features –
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Federal Energy and Environmental Regulation Agencies and Laws
CHAPTER 2 LIVING WITH TECTONIC HAZARDS Risk or Opportunity?
Nuclear Energy in 2013: Status and Outlook Briefing for Czech Technical University Scott Peterson, Senior Vice President Nuclear Energy Institute March.
LIVE INTERACTIVE YOUR DESKTOP January 25, 2012 Green Power for a Digital World Presented by: Natalie Wood and Marvin Fertel.
Rated # 1 “BEST PLACES TO WORK IN THE FEDERAL GOVERNMENT” Dale A. Powers US Nuclear Regulatory Commission.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Fukushima Nuclear Power Plant
Fukushima Incident Preliminary Analysis, Consequences and Safety Status of Indian NPPs Part-1 Dr. S.K.Jain Chairman & Managing Director NPCIL & BHAVINI.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
NRC Leadership Expectations and Practices for Sustaining a High Performing Organization NRC Commissioner William C. Ostendorff FR/SSO/FS Workshop U.S.
Performance Assessment Issues in Waste Management and Environmental Protection Annual Meeting of the Baltimore-Washington Chapter of the Health Physics.
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
August 4,  Vermont Yankee Nuclear Power Station (VYNPS) ceased power operations on December 29, 2014 after 633 days of continuous power operation.
1 The U.S. NRC’s Reactor Certification and Licensing Process – Meeting the Challenge? Commissioner Peter B. Lyons U.S. Nuclear Regulatory Commission 15.
Fukushima Nuclear Disaster Team 07: Belsheim Joshua Francis Travis He Jiayang Moehling Anthony Ziemkowski Micah 1.
1 Crisis Management / Emergency Management Overview.
NE 127 – Codes, Standards, and Regulations Power Industry Regulations INSTRUCTOR: Chattanooga State CC.
Nuclear Accident at the Fukushima Dai-ichi NPP June 2, 2011 Embassy of Japan in Bulgaria.
Fukushima Dai-ichi - LinkLink. Boiling Water Reactor – Video LinkVideo Link.
Resilient & Ready Communities March 18, 2010 Children and Emergencies.
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions.
Update on EPPR Radiation Projects October 2012 Ann Heinrich, U.S. Department of Energy.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E LashCIE Presentation 1/98 1 Recent Accomplishments and Future Directions Dan Giessing U.S. Department.
March 11, 2011 to Present. Presentation Overview Reactor Design and FeaturesChronology of EventsCurrent Status of Each ReactorRecovery Actions Kashiwazaki-Kariwa.
C O N T R A C T O R I N F O R M A T I O N E X C H A N G E Reister CE Presentation 1/98 1 Program Elements and Related Activities Rich Reister U.S. Department.
Chapter 12 Nuclear Energy.
Fukushima Power Plant – Japan Post March 11, 2011
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
The Curious Absence of New Nuclear Michael Hoeger Presented 02/06/2012.
Nuclear Power Plant How A Nuclear Reactor Works.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
MEHB 513 Introduction on nuclear technology assignment GROUP MEMBERS:ID: SEEH CHONG CHIN ME YEE QIAN WAHME TING DING PINGME LIM JIA YINGME
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
FY 2012 Budget Press Briefing February 14, NRC FY 2012 Budget NRC Mission: License and regulate the Nation’s civilian use of byproduct, source,
Japanese Nuclear Accident And U.S. Response April 20, 2011.
INTRODUCTION TO NUCLEAR TECHNOLOGY MEHB513 SEM 2,2014/2015 GROUP PROJECT : EVALUATE THE IMPACTS OF THE FUKUSHIMA NUCLEAR ACCIDENT ON THE TECHNOLOGY DEVELOPMENT.
Community Health Centers of Arkansas Hazard Vulnerability Assessment Workshop August 11, 2017 Mark Fuller.
Independence of a Regulatory Body
Fukushima Daiichi Jourdan Robbins 12/6/ /16/16.
Enhancing Safety at America’s Nuclear Energy Facilities
Spent Fuel Pool Instrumentation NRC Order EA
Janet R. Schlueter Senior Director, Radiation and Materials Safety
9.5 Nuclear Power Although nuclear power does not come from a fossil fuel, it is fueled by uranium, which is obtained from mining and is non-renewable.
WENRA Current activities of WENRA 4th GNSSN Steering Committee Meeting
Regulatory Control Training Workshop
REMOVAL AND RELOCATION OF SPENT NUCLEAR FUEL FROM THE SAN DIEGO REGION
Fukushima Daiichi Nuclear Plant Event Summary and FPL/DAEC Actions
Fukushima Lessons Learned
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Fukushima Nuclear Power Plant
NE 127 – Codes, Standards, and Regulations Power Industry Regulations
Emergency Preparedness
Japanese Nuclear Accident And U.S. Response
Presentation transcript:

Japanese Nuclear Accident And U.S. Response May 17, 2011

Tsunami Initiates Nuclear Accident  On March 11 a magnitude 9.0 earthquake occurred off the east coast of Japan – All operating nuclear power plants shut-down safely  An hour later a massive tsunami—about 45 feet high—struck the east coast – Critical equipment at Fukushima Daiichi plant was destroyed

Fukushima Daiichi Nuclear Power Plant Before the Accident Unit 1 Unit 2 Unit 3 Unit 4 Units 5, 6 At the time of the earthquake Reactors 1, 2 and 3 operating Reactors 4, 5 and 6 shutdown for maintenance, inspection, refueling

Tsunami Damage Looking Toward the Plant

No Backup Power for Cooling Systems at Fukushima Daiichi 1-4  Cooling systems eventually stopped working due to lack of off-site power and back-up power systems  Fuel in reactor heated up – Fuel cladding reacted with water at high temperature, generating hydrogen gas  Containment pressure increased; TEPCO vented hydrogen in containment to atmosphere to prevent overpressure  Hydrogen explosions occurred in secondary containment  Plant operators injected sea water into reactors to cool fuel, prevent further damage

Boiling Water Reactor Design Spent Fuel Pool Reactor Vessel Suppression Pool (Torus) Primary Containment Steel Containment Vessel Secondary Containment Boiling Water Reactor Design At Fukushima Daiichi

Continual Recovery Efforts  Continue to cool and stabilize reactors 1-3  Provide additional cooling water to used fuel pools in reactors 1-4  Provide long-term cooling systems  Process radioactive water  Conduct detailed evaluation of event  Decommission Fukushima reactors

U.S. Nuclear Plants Are Safe “Our nuclear power plants have undergone exhaustive study, and have been declared safe for any number of extreme contingencies. ” President Barack Obama March 17, 2011 “All the plants in the United States are designed to deal with a wide range of natural disasters, whether it’s earthquakes, tornados, tsunamis, other seismic events. We require all of them to deal with those.” NRC Chairman Gregory Jaczko March 17, 2011

U.S. Nuclear Energy Facilities Prepared for Extreme Events  Maximum credible earthquakes, floods, other natural events  Total loss of power  Hydrogen generated as a result of fuel damage is removed from the plant through special vent  Post 9/11: response for aircraft impact, loss of large areas of the plant  Industry is prepared for the unexpected…exceeds NRC requirements  U.S. industry dedicated to continuous learning

Emergency Planning for U.S. Nuclear Energy Facilities  10-mile emergency planning zone (evacuation or sheltering); 50-mile monitoring zone for environment and food.  Comprehensive industry/local/state and federal response to emergency events  Radiation monitoring by plant site, NRC, and state and local personnel  Decisions on public protective action measures made by state or local authorities based on recommendations from plant operator and NRC  Emergency response exercises coordinated with state, local, and federal officials, evaluated by the NRC and FEMA

U.S. Government Response  Multi-agency task force (Nuclear Regulatory Commission, Department of Energy, Department of Defense) supporting Japan recovery efforts  President Obama directed the NRC to perform a comprehensive review of U.S. reactors  NRC established agency task force to develop lessons learned from Fukushima Daiichi accident to provide short-term and long-term analysis of the events

NRC Task Force to Review the Events in Japan  NRC is currently reviewing seismic, flooding, station black out, severe accident management and other guidance  Task force will provide recommendations for near-term action and framework and topics for longer-term review  Final task force briefing on July 19 and near-term report issued in July “To date the task force has not identified any issues that undermine our confidence in the continued safety and emergency planning of U.S. plants” – NRC Task Force, May 12, 2011 Photo courtesy of the NRC

Examples of Differences Between U.S. and Japanese Reactor Operations United States 1.Post 9/11/01 actions to address large fires and explosions 2.Independent regulatory agency with 4,000 employees and $1 billion budget 3.Industry organization for oversight and sharing operating experience 4.Site-specific simulator for each reactor Japan 1.No similar action taken 2.Regulator is part of Ministry of Economy, Trade and Industry 3.No similar industry organization 4.Shared simulators for multiple plants

NRC Licensing Actions after March 9, 2011  Power uprates approved for Limerick and Point Beach reactors  License renewals granted for Vermont Yankee and Palo Verde 1, 2 and 3  Final Environmental Impact Statements for new reactor construction at Vogtle plant in Georgia and Summer plant in S.C.  Design certification for the GE-Hitachi advanced reactor design (ESBWR) issued for public comment

Outlook for U.S. Nuclear Industry  Nuclear energy remains vital part of U.S. and global electricity portfolio  Updates to equipment, training and operational procedures to address lessons learned from Fukushima  Four to eight new reactors operational by 2020  Demand for electricity will continue to increase – Nuclear energy will remain an option to provide low-carbon, affordable electricity – U.S. reactor manufacturers and suppliers will continue to participate in the $400 billion global market for nuclear energy

Nuclear Industry Policy Priorities  Stability at the NRC: renomination and confirmation of two commissioners this year  Full response to Fukushima accident  Ensure loan guarantee program is workable financing platform for new reactors  Alignment of U.S. government agencies to support export of U.S nuclear energy technology and services  Constructive congressional oversight

Used Fuel Management Requires National Policy  Used fuel is safely stored at reactor sites  Older used fuel rods pose little additional risk due to declining heat and radiation over time  Federal government responsible for used nuclear fuel disposal  Temporary fuel storage at 1 or 2 locations important step toward moving fuel from reactors

U.S. Industry Taking Steps to Make Safe Nuclear Energy Facilities Safer  Nuclear energy industry committed to take short-term and long-term actions  Short-term action : Verify readiness to manage extreme events  Long-term action: – Exhaustive analysis of Japanese accident and how reactors, systems, structures, components, fuel and operators performed – Incorporate lessons learned into U.S. reactor designs and operating practices

Short-Term Industry Actions to Ensure Safety  Verify each plant's capability to respond to major challenges, such as aircraft impacts, loss of large areas of plant due to natural events, fires or explosions  Verify each plant's capability to manage loss of off-site power  Verify capability to mitigate flooding and the impact of floods on systems inside and outside the plant  Inspect important equipment needed to respond to extreme events

Information Sources  Nuclear Energy Institute (  U.S. Nuclear Regulatory Commission (  U.S. Department of Energy (  International Atomic Energy Agency (  American Nuclear Society (  Health Physics Society (  Japanese Nuclear and Industrial Safety Agency (  Japan Atomic Industrial Forum (  Tokyo Electric Power Company (