Used Fuel Projections and Considerations John Kessler Manager, Used Fuel and HLW Management Program, Nuclear Infrastructure Council Sustainable.

Slides:



Advertisements
Similar presentations
Adam H. Levin AHL Consulting May 14, BWR – Boiling Water Reactor DOE – Department of Energy DSC – Dry Storage Canister ISF – Interim Storage Facility.
Advertisements

Constellation Energy “The Way Energy Works” PWR Tritium Issues G. C. Jones.
Independent Spent Fuel Storage Installation (ISFSI) Dry Cask Storage NUCP
Interim Storage of Used Nuclear Fuel February 2008.
The Harnessed Atom Lesson Seven Waste from Nuclear Power Plants.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy A History of Standardized, Multipurpose Canister.
Long Term Storage, The Failure of the Federal Government, and NIMBY.
The Yucca Mountain Repository for Nuclear Waste April 23, 2007 Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
1 GAO Study on Radioactive Waste Management Scenarios Ric Cheston US Government Accountability Office (GAO)
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
Nucular Waste A Technical Analysis Ian Baird 5/12/08.
NUCLEAR ENERGY What is it? David J. Diamond Energy Sciences & Technology Department February 2009.
Power Generation and Spent Fuel
Near Term Planning for Storage and Transportation of Used Nuclear Fuel Jeff Williams Project Director Nuclear Fuels Storage and Transportation Planning.
Indian strategy for management of spent fuel from Nuclear Power Reactors S.Basu, India.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Setting the Stage: Review of 2013 IEPR Nuclear Recommendations Danielle Osborn Mills Former Senior Nuclear Policy Advisor to the California Energy Commission.
Spent Nuclear Fuel Timothy Pairitz. Nuclear Power 101 Uranium-235 is enriched from 0.7% to 3-5%. Enriched fuel is converted to a uranium oxide powder.
Fuel Behavior in Long-term Management of Spent Light-Water Reactor Fuel International Conference on Management of Spent Fuel from Nuclear Power Reactors.
Nuclear Power Discussion March 25, 2009 Joint meeting of the Legislative Energy Commission; the House Energy Finance & Policy Division; and the Senate.
The Way Forward in the US: Nuclear Waste Management Allison Macfarlane AAAS San Diego February 19, 2010.
Cooperative Planning: Building a Sustainable Nuclear Industry Megan Sharrow University of Wisconsin – Madison WISE 2006.
GNEP: A Proliferation Risk or a Solution to the Nuclear Waste Problem? Allison Macfarlane George Mason University Senate briefing June 23, 2008 Allison.
John Wagner Oak Ridge National Laboratory Nuclear Fuels Storage and Transportation Planning Project U.S. Department of Energy 10 th Meeting of the U.S.-Argentina.
Recycling Nuclear Waste: Potentials and Global Perspectives Mikael Nilsson Department of Chemical Engineering and Materials Science University of California,
Demonstration Test Program for Long–term Dry Storage of PWR Spent Fuel
Office of Nuclear Energy U.S. Department of Energy
Chapter 4 Nuclear Energy. Objectives Describe how nuclear fuel is produced. List the environmental concerns associated with nuclear power. Analyze the.
IAEA NSF Conference 2010 Nuclear Spent Fuel Management in Spain Pablo Zuloaga.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
The environment is everything that isn’t me. Albert Einstein Albert Einstein.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
Nuclear Fuels Storage and Transportation Planning Project
PBNC- 1 Overview of US Nuclear Energy Initiatives /06- 1 Harold McFarlane President American Nuclear Society.
Sustainable Cycle Solutions World Nuclear Association London, Sep 12 th, 2013 Caroline Drevon SVP Strategy, Sales & Innovation Back-End Business Group.
Nuclear Fuels Storage & Transportation Planning Project Office of Fuel Cycle Technologies Nuclear Energy Criticality Safety Assessment for As-loaded Spent.
MODULE “COST ESTIMATION, CALCULATION AND COST CONTROL” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da.
Eric M. Davied American Nuclear Society Texas A&M University
Integrated Used Nuclear Fuel Management Regulatory Information Conference U.S. Nuclear Regulatory Commission March 11, 2009 Steven P. Kraft Senior Director.
Safety and Licensing of Spent Fuel Storage Facilities Vonna Ordaz, U.S. NRC Presented at International Conference on Management of Spent Fuel from Nuclear.
Licensing procedures for interim storage of spent fuel in Germany
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
Repository Design Overview Presented to: NSNFP Meeting Presented by: Joe Price Office of Repository Development April 13, 2005 Bethesda, MD.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
Presented to: National Spent Nuclear Fuel Program Presented by: Ned Larson, Director Infrastructure Development Division Office of National Transportation.
4/2003 Rev 2 I.4.9h – slide 1 of 24 Session I.4.9h Part I Review of Fundamentals Module 4Sources of Radiation Session 9hFuel Cycle – Spent Fuel IAEA Post.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
USED NUCLEAR FUEL-- WHAT WILL WE DO WITH IT? Dr. Alan S. Hanson Executive Vice President Technology and Used Fuel Management AREVA NC Inc.
The Yucca Mountain Repository for Nuclear Waste June Edward F. Sproat III Director Office of Civilian Radioactive Waste Management U.S. Department.
International Atomic Energy Agency Reprocessing, Waste Treatment and Disposal Management of Spent Nuclear Fuel Seminar on Nuclear Science and Technology.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
IAEA Sources of Radiation Nuclear Fuel Cycle – Fuel Fabrication Day 4 – Lecture 7 1.
Perspectives on the Back- end of the Nuclear Fuel Cycle: Present and Future John Kessler, Program Manager, HLW & Spent Fuel Management
Briefing M&E Parliamentary Portfolio Committee: Radioactive Waste Management Policy and Strategy.
Nuclear Power Plant How A Nuclear Reactor Works. Pressurized Water Reactor - Nuclear Power Plant.
Short how nuclear plant works how nuclear power works.
25.3 Fission and Fusion > 1 Copyright © Pearson Education, Inc., or its affiliates. All Rights Reserved. Chapter 25 Nuclear Chemistry 25.1 Nuclear Radiation.
1 Management of Spent Nuclear Fuel Dry Storage in Taiwan By Chih-tien Liu Engineer of Fuel Cycle and Materials Administration Atomic Energy Council, ROC.
Chapter 25 Nuclear Chemistry 25.3 Fission and Fusion
Diablo Canyon Independent Spent Fuel Storage Installation (ISFSI)
Mary Lou Dunzik-Gougar, PhD ANS Teachers’ Workshop 2013
Nuclear Power Public safety concerns and the costs of addressing them have constrained the development and spread of nuclear power in the United States,
Nuclear Waste Storage Current Status and Plans
DOE’s Centralized Storage Design Alternatives and Security Regulations Jeff Williams Project Director, Nuclear Fuels Storage and Transportation.
Regulatory Control Training Workshop
Plutonium Reprocessing and Recycling
Nuclear Decommissioning Citizens Advisory Panel (NDCAP) Certificate of Public Good (CPG) – Second ISFSI Pad & New 200 kW DG May 28, 2015.
NUCLEAR ENERGY What is it?
By Daveed Ransome and a little bit of work done by Charles Cramer
Presentation transcript:

Used Fuel Projections and Considerations John Kessler Manager, Used Fuel and HLW Management Program, Nuclear Infrastructure Council Sustainable Fuel Cycle Meeting 9 June 2010

2 © 2010 Electric Power Research Institute, Inc. All rights reserved. Outline Why we got to where we are Utility issues related to wet and dry storage Commercial used fuel inventories: present and future projections Extended storage R&D

3 © 2010 Electric Power Research Institute, Inc. All rights reserved. Back-end of the Nuclear Fuel Cycle: Original Plan (before ~ 1976) Nuclear Power Plant Reprocessing Plant Geologic Repository Re-fabricate/Recycle Vitrified Waste

4 © 2010 Electric Power Research Institute, Inc. All rights reserved. Key Developments in the 70’s in the U.S. Sharp increase in reprocessing costs India’s nuclear bomb test US decision to forego reprocessing and Pu recycle Result: a “once-through” fuel cycle

5 © 2010 Electric Power Research Institute, Inc. All rights reserved. The Once-through Fuel Cycle Wet Storage Transportation Used Fuel Offsite Storage Geologic Medium 10 CFR CFR CFR 60/63 10 CFR 50 Utility Licensees U.S. DOE Dry Interim Storage ?

6 © 2010 Electric Power Research Institute, Inc. All rights reserved. Current Situation No disposal No reprocessing No fast reactors Spent fuel pools are filling up No centralized interim storage Transportation not available for all used fuel types Therefore, nowhere for fuel to go

7 © 2010 Electric Power Research Institute, Inc. All rights reserved. Industry Reaction to the Need for Prolonged On-Site Storage Add more storage cells in the spent fuel pools (“reracking”) Move used fuel from pools into dry storage Extract more energy per assembly (higher “burnups”) Attempt to build a centralized interim storage site Work on regulatory permission to transport high burnup used fuel Extend the life of existing dry storage systems After January 31, 1998: damages lawsuits against DOE for failure to start picking up used fuel –Money coming from DOJ Judgment Fund

8 © 2010 Electric Power Research Institute, Inc. All rights reserved. Centralized Interim Storage Example ( Private Fuel Storage Facility, Goshute Indian Reservation, State of Utah) Developed by a utility consortium, 40,000 MTU capacity 2005: NRC approval for construction, 40-year life Artist’s conception of site below: A: rail line (52 km)B: cask transfer building C: concrete padsD: concrete cask production

9 © 2010 Electric Power Research Institute, Inc. All rights reserved. Used Fuel Wet and Dry Storage Technology is Mature (Used Fuel Pool with Dry Storage Cask: Surry - Final TN-32 Loading)

10 © 2010 Electric Power Research Institute, Inc. All rights reserved. On-Site Spent Fuel Dry Storage Systems

11 © 2010 Electric Power Research Institute, Inc. All rights reserved. Dry Storage Casks at Connecticut Yankee

12 © 2010 Electric Power Research Institute, Inc. All rights reserved. Surry ISFSI - Pad 1

13 © 2010 Electric Power Research Institute, Inc. All rights reserved. Surry ISFSI - Pad 2

14 © 2010 Electric Power Research Institute, Inc. All rights reserved. Surry ISFSI - Pad 3

15 © 2010 Electric Power Research Institute, Inc. All rights reserved. Transportation Systems

16 © 2010 Electric Power Research Institute, Inc. All rights reserved. Industry Trend from “Storage-Only” to “Dual Purpose Canisters” Dual Purpose: storage and transportation (requires two separate licenses) Multi-Purpose: storage, transportation, disposal (requires three licenses – none exist yet)

17 © 2010 Electric Power Research Institute, Inc. All rights reserved. Historical and Projected Used Fuel “Burnup” (megawatt-days per metric ton of uranium, MWD/MTU) Burnup range from the 60s to the 80s “high” burnup No transportation licenses

18 © 2010 Electric Power Research Institute, Inc. All rights reserved. Inventory of Used Nuclear Fuel is Measured Several Different Ways Number of assemblies –More in a Boiling Water Reactor (BWR) than a Pressurized Water Reactor (PWR) Metric tons of uranium (MTU) –Similar MTUs in both BWRs and PWRs Number of dry storage casks –Move to larger capacity casks (cheaper per assembly) Dry storage: 7 (1980s) to >60 assemblies per cask today –Still transportable by rail

19 © 2010 Electric Power Research Institute, Inc. All rights reserved. Used Commercial Fuel Inventories (as of 12/31/09) National totals: –Wet storage: 169,696 assemblies at >50 reactor sites –Dry storage: 1,232 casks, 51,585 assemblies in 32 states Top six states (casks/assemblies in dry storage) –Illinois –Pennsylvania –South Carolina –Virginia –Georgia –California Data courtesy of ACI Nuclear Energy Solutions

20 © 2010 Electric Power Research Institute, Inc. All rights reserved. By 2055: >485,000 assemblies (per ACI Nuclear Energy Solutions)

21 © 2010 Electric Power Research Institute, Inc. All rights reserved. ISFSI: Independent Spent Fuel Storage Installation

22 © 2010 Electric Power Research Institute, Inc. All rights reserved. Potential Additional Used Fuel in a “Renaissance” Current Yucca Mountain legal limit (63,000 MTU)

23 © 2010 Electric Power Research Institute, Inc. All rights reserved. Yucca Mountain Technical Capacity is Much Higher Than the Legal Limit EPRI’s projected technical capacity range (~260, ,000 MTU, 4 to 9 times current legal limit) Current legal limit (63,000 MTU)

24 © 2010 Electric Power Research Institute, Inc. All rights reserved. Newest Storage Project: Extended Storage “Extended”: >>60 years Initial dry storage license periods: 20 years –Was supposed to be long enough Existing EPRI work leads to licenses extended to 60 years But: –Cancellation of Yucca Mountain? New disposal program could take decades –New plants’ contracts with DOE: start taking spent fuel 20 years after plant shutdown means 80 to 100+ years Extended storage is not just a US problem

25 © 2010 Electric Power Research Institute, Inc. All rights reserved. Functions of a Dry Cask Storage System that Must be Maintained NUREG-1536 (NRC, 1997) identifies the functions important to safety that the dry cask systems must maintain: –thermal performance –radiological protection –confinement –sub-criticality –retrievability Can the existing and future dry cask systems maintain these functions for decades to come?

26 © 2010 Electric Power Research Institute, Inc. All rights reserved. Temperature-related Dry Storage System Degradation Mechanisms Fuel cladding creep caused by increased cladding ductility and increased stress –Due to higher temperatures causing higher pressures inside the cladding Hydride reorientation in the spent fuel cladding Corrosion Degradation of neutron shielding Concrete dry-out and cracking

27 © 2010 Electric Power Research Institute, Inc. All rights reserved. Changes as the System gets Older and Cooler Mostly good things –Reduced metal creep rates –Reduced corrosion rates –Reduced gamma and neutron radiation Potential negatives (mostly related to cladding) –Additional hydride precipitation –Decreased cladding ductility Potentially more susceptible to breakage during storage and transportation

28 © 2010 Electric Power Research Institute, Inc. All rights reserved. Aging Management Options “Initial” activities –Additional analyses of degradation mechanisms for longer periods –Enhanced monitoring and inspection “Eventually” (more costly, higher worker dose) –Canning –Repackaging –Over-packaging When is “eventually”?

29 © 2010 Electric Power Research Institute, Inc. All rights reserved. EPRI Initiated a Joint Effort in a November 2009 Workshop Attendees: –EPRI –NRC: SFST, RES, NRR –DOE: NE, EM, RW –Utilities –Storage system vendors –NEI –NWTRB Title: Extended Storage Collaboration Program –EPRI will be lead organization –US and international participation

30 © 2010 Electric Power Research Institute, Inc. All rights reserved. Purpose of the Program Evaluate what we already know –Existing analyses: how far out in time? –Existing data –Existing operational issues (e.g., loading, monitoring, testing) Identify the open items for even longer storage (gap analysis) Suggestions for what needs to be done (and how, if possible) Form a standing group to continue pursuing additional, appropriate R&D

31 © 2010 Electric Power Research Institute, Inc. All rights reserved. Conclusion: Industry Will do What is Necessary to Keep Plants Running Continue cranking out dry storage systems as a stop-gap measure –Industry has not (yet) been successful completing a centralized storage facility –Will get harder and harder to continue adding to the on-site storage inventory Space, dose, public concern limitations Shutdown plants: all that is left is the fuel Ensure wet and dry storage systems maintain their safety functions Without an active disposal program, it becomes more difficult to address the “what about the waste?” concern

32 © 2010 Electric Power Research Institute, Inc. All rights reserved. Together…Shaping the Future of Electricity