A Streamlined Approach to Data Management with EQuIS

Slides:



Advertisements
Similar presentations
ASYCUDA Overview … a summary of the objectives of ASYCUDA implementation projects and features of the software for the Customs computer system.
Advertisements

Introduction Lesson 1 Microsoft Office 2010 and the Internet
DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Integrated Banking Systems Introduction: IBS-ITech combines powerful central accounting with the capacity to allow the work team to use automated, customizable.
Beyond the Help Desk Getting ahead of the game Mihaela Damian Dan Sexton 11 th July 2013 CSCS > School of Clinical Medicine > University of Cambridge.
HP Quality Center Overview.
BirdNest Services Wireless Solutions for Field Data Management.
Libraries in FE Colleges Capita Library Management System Demonstration May 2013.
Dan Alexander Vice President, Sales Scot Weaver Vice President & Co-Founder May 15, 2013 ICEDM – Portland, Oregon Copyright 2013 EarthSoft, Inc.
Tom Sheridan IT Director Gas Technology Institute (GTI)
Surfing the Data Standards: Colorado’s Path 2012 MIS Conference – San Diego Daniel Domagala, Colorado Department of Education David Butter, Deloitte Consulting.
Access 2007 Product Review. With its improved interface and interactive design capabilities that do not require deep database knowledge, Microsoft Office.
Chapter 3 Database Management
1 Meeting the Reporting Challenges at International Paper.
Nu Project Management Office A web based tool to Manage Projects.
Lower costs and improve predictability Automation Enable service owners to focus on work that adds business value Reduce error-prone manual activities.
CategoryCapability + Recommended Tool Analysis Self Service BI with Power View integration Ad-Hoc (e.g. user defined) views Interactive analysis.
Customising SharePoint David Gristwood Developer & Platform Group
Connecting Diverse Web Search Facilities Udi Manber, Peter Bigot Department of Computer Science University of Arizona Aida Gikouria - M471 University of.
Microsoft Dynamics. Introducing Al-Futtaim Technologies  One of the region’s leading System Integrators  Strong partnerships with leading global ICT.
ENVIRONMENTAL DATA MANAGEMENT & SHALE GAS PROGRAMS INTERNATIONAL PETROLEUM ENVIRONMENTAL CONFERENCE NOVEMBER 14, 2013.
A Data Management Life-Cycle By David Ferderer Project Chief Chris SkinnerContractor Greg GuntherContractor
Microsoft Access 2007 Microsoft Access 2007 Introduction to Database Programs.
1 SHAREPOINT FOR PROJECT MANAGEMENT COLLABORATION Gerry Brimacombe Sector Learning Solutions Inc.
Welcome to the Minnesota SharePoint User Group. Introductions / Overview Project Tracking / Management / Collaboration via SharePoint Multiple Audiences.
Managing Data Interoperability with FME Tony Kent Applications Engineer IMGS.
ArcGIS Workflow Manager An Introduction
DYNAMICS CRM AS AN xRM DEVELOPMENT PLATFORM Jim Novak Solution Architect Celedon Partners, LLC
Daktronics SharePoint Use – May, 2008 MNSPUG. Introductions IT Information Selection Environment Platform Lessons Learned Questions Agenda.
Data Processing Capabilities
National Park Service U.S. Department of the Interior Resource Information Management Division National Information Services Center Office of the Chief.
ControlDraw, Modularisation, Standards And Re-Use Standardised Specification and Modular Design How ControlDraw Help.
SharePoint Services Indiana University Cory P. Retherford May 9 th, 2011.
Using XML technologies to implement complex tables in short- term statistics Francesco Rizzo
ChemStation Integration with ECM November 7, 2006 Integration of ChemStation with OpenLAB ECM Life Sciences Solutions Unit Susanne Kramer, Application.
PO320: Reporting with the EPM Solution Keshav Puttaswamy Program Manager Lead Project Business Unit Microsoft Corporation.
Strengthening Performance Management through Enhanced Wait Time Reporting Haim Sechter: Manager, Reporting and Analytics Jennifer Liu: Team Lead, Reporting.
Overview Features & Functions 07/2013. Foundations Need A Document Processing Solution That… Collects files automatically? Scans to Word? Scans to Desktop?
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
IT 456 Seminar 5 Dr Jeffrey A Robinson. Overview of Course Week 1 – Introduction Week 2 – Installation of SQL and management Tools Week 3 - Creating and.
ArcGIS Data Reviewer: An Introduction
Data Management Console Synonym Editor
Carey Probst Technical Director Technology Business Unit - OLAP Oracle Corporation.
LS Retail BI Information/requirements/deployment steps.
Informed decisions for Selection Support in Libraries 20th Pan-helenic Conference of Academic Libraries Thessaloniki, 14/11/2011 Núria Sauri Electronic.
Any data..! Any where..! Any time..! Linking Process and Content in a Distributed Spatial Production System Pierre Lafond HydraSpace Solutions Inc
WgScheduler Generic Task Scheduling Application. What Does It Do  Automates any task that may be scripted using VBScript  Triggers task execution (or.
CASE (Computer-Aided Software Engineering) Tools Software that is used to support software process activities. Provides software process support by:- –
Metadata By N.Gopinath AP/CSE Metadata and it’s role in the lifecycle. The collection, maintenance, and deployment of metadata Metadata and tool integration.
REPORTING SOFTWARE for BUILDING & INDUSTRIAL AUTOMATION.
Automation Solutions – Product & Practice
1 Copyright © 2009, Oracle. All rights reserved. Oracle Business Intelligence Enterprise Edition: Overview.
Impact Research 1 Enabling Decision Making Through Business Intelligence: Preview of Report.
Introduction to the Power BI Platform Presented by Ted Pattison.
Automation Living in a Paper Oriented World and The Steps to Automation.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
CIS 515 STUDY creative knowledge /cis515study.com
CIS 515 Competitive Success/snaptutorial.com
CIS 515Competitive Success/tutorialrank.com
CIS 515 Education for Service-- tutorialrank.com.
CIS 515 STUDY Lessons in Excellence-- cis515study.com.
CIS 515 Education for Service/snaptutorial.com
CIS 515 Teaching Effectively-- snaptutorial.com
Increased Efficiency and Effectiveness
Enterprise Program Management Office
Introduction to Database Programs
Presented by: Jeff Moore – Artsyl Technologies, Inc.
Introduction to Database Programs
Service management system at cloud
Mark Quirk Head of Technology Developer & Platform Group
Presentation transcript:

A Streamlined Approach to Data Management with EQuIS Dan McCarthy, Valerie Kull Imagine the result

Presenter Bio M. A. Geophysics, B. S. in Mathematics and Physics 6 years at ARCADIS, 19 years as a consultant Currently Sub-discipline Lead for Data Management and Reporting in U.S. Based in Newtown, Pennsylvania office Presenter Bio

Outline of Presentation Brief Overview of EQuIS footprint at ARCADIS US Our Information Management Philosophy and how EQuIS fits in Gap Analysis and Solutions Data Collection Document Management Data Validation/Verification Reporting Case Study

EQuIS Footprint Using EQuIS since 1997, EQuIS 5 since 2008. EQuIS 5 sits on a 2-blade SQL Server 2008 R2 cluster EQuIS Enterprise highly leveraged for loading data (80-90%) and reporting by main staff EQuIS Pro for data management staff SPLA in very limited use EQuIS Footprint Database Statistics (as of 4/23/2012) Total Facilities 940 Total Results 14,106,403 Total Enterprise Users 197 Total Power users 38 Total SSRS Users 2,600 Facilities using validation form 60

A successful Information Management (IM) strategy is at the core of every successful project. IM is a key area for quality, efficiency and cost saving improvements. A streamlined flow of data to and from a database best supports quality, efficiency and cost savings. How does EQuIS fit into this? What’s our philosophy?

EQuIS Schema We believe that the EQuIS database schema is the critical part of the equation. Because data in the EQuIS database can be accessed by several methods, add-ins and customizations are more easily integrated, and so can be more streamlined. Changes to the database schema have to be modular to allow for upgrades from EarthSoft and have to make business sense.

Gap Analysis We did a gap analysis and identified four areas for improvements Data Collection from the field Document management Validation/Verification Project-level Summary reporting

Focuses on building and deploying tools for field staff to record the data at the point of collection Spatial and Non-Spatial Data Collection Produce paper field forms Make data available for use in other IM tools. Data Collection

EDGE Solution Electronic Data Gathering Environment (EDGE) Ruggedized field equipment Database on an ARCADIS server Desktop connection to server to support development and data review Internet to transfer data Standard applications Custom-built applications for specialty services EDGE Solution

Example Output

Business case for EDGE 1021 boreholes drilled in 7 months 2050 analytical samples collected Stored and tracked 1000+ field photos 0.75 hours spent per log produced Traditionally 1-3 hours are spent per log Includes field support, data quality checking, draft and finalized logs Based on lessons learned future projects could expect 0.4 to 0.5 hours per log

Document Management – The Challenge Problem What did we do? The tools available in EQuIS just generate data files for LogPlot. Compiling the logs requires manual intervention – inefficient for this scale. We needed a way to batch generate boring logs and well construction logs efficiently. We wrote a EQuIS plugin that allows us to batch compile LogPlot logs and upload the completed logs with metadata to our Project Portal solution (SharePoint).

LogPlot Compiler

Validation/Verification - The Challenge Problem What did we do? ARCADIS was an early adopter of DQM (for EQuIS 3) and ADR. ADR is not currently in use due to differences between ADR and common project workflow. The most streamlined approach is to enter qualifiers directly into EQuIS. Pro offers too much access to the database and is a significant cost burden and learning curve for project chemists. We designed a webform in ASP.NET that leverages Enterprise login credentials. We extended the schema to allow rollback to unvalidated state. We automated the qualifier transfer. We developed a report to be included with a data validation summary report.

Validation Form

Project-level Summary reporting – The Challenge Problem What did we do? A Project team needed a high-level status summary. Although it includes information stored in EQuIS, the format was not covered by the existing report library. It needed to include pie charts and a tabular summary. Since data is in constant flux, regenerating data and graphics must be automatic. We leveraged SSRS and a custom stored procedure to query, format and deliver these reports.

Project Summary Report Screenshot

Case Study We were asked to develop a solution that allowed us to collect, manage and report remediation system data for a large portfolio in the US. Systems in play at the moment are Air Sparging, Soil Vapor Extraction, Multi-Phase Extraction. Other treatment options are coming on line shortly.

Case Study – O&M - Challenges Problem What did we do? Every system is different. There was significant pressure to design custom application for each system. Some of the data to be collected didn’t really fit into the EQuIS standard schema. One requirement was complex reports with calculated fields. We came up with a consistent approach to inconsistent designs with respect to the data model. The tool combines data collection/verification with EDGE, management/validation with EQuIS and reporting with SSRS.

EDGE O&M – Task Management

EDGE O&M – System collection points

EDGE O&M – Collection Point Data

EDGE O&M - Reporting

EDGE O&M – System Performance Reports

Summary No data management system is perfect right out of the box. Adaptability is key to streamlining. Both the project team and the data flow must be able to respond to changing conditions. EarthSoft’s approach to their schema allows us to integrate customizations which streamline the data flow. Additionally, opportunities like the Advanced User Training have allowed us to develop tools like these. EarthSoft staff have also been receptive to our ideas about their products. Summary Not all field procedures may currently be the most efficient.

April 20, 2017 Imagine the result