Legionella Risk Assessment Mike Rose. Legionella Risk Assessment Identification and evaluation of sources of potential risk Means by which exposure is.

Slides:



Advertisements
Similar presentations
Environmentally sound management of ship recycling- simple or complex? Roy Watkinson Department for Environment, Food and Rural Affairs UK Promoting Sustainable.
Advertisements

A Joint Code of Practice Objectives and Summary Presentation
Checking & Corrective Action
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
[Organisation’s Title] Environmental Management System
Module 13 Oversight Assessment of Auditor Authentication Bodies
Prepared and presented by Paul French AJA Registrars Operations Director AJA are a multi-accredited International Certification Body based in Portishead.
Ensuring Effective Monitoring, Certification and Verification of Emissions by Jed Jones Lloyd’s Register.
Kenya AIDS Vaccine Initiative
Third Party Certification & The Q-Mark Scheme. What is third party certification? Independent process of certifying that a manufacturer continues to comply.
October 3, 2006TCBC Meeting October, 2006Slide 1 TCB Code of Practice Art Wall
Contractor Safety Management
BRC Storage & Distribution Safety and Quality Management System Training Guide
LEGIONELLA MANAGEMENT & CONTROL NUQPR024 V
Health and Safety Manual Section L6 Legionella. Legionella L6 is a single set of standards for the management of Legionella bacteria, based on the HSE.
Health and Safety Executive Control of Legionella Howard Whittaker Principal Inspector FOD Leeds.
Computer Security: Principles and Practice
Responsible CarE® Employee health and Safety Code David Sandidge Director, Responsible Care American Chemistry Council June 2010.
Short Course on Introduction to Meteorological Instrumentation and Observations Techniques QA and QC Procedures Short Course on Introduction to Meteorological.
Good Hygiene Practices along the coffee chain The Codex General Principles of Food Hygiene Module 2.3.
A Guide to Fire Alarm Service and Maintenance Requirements.
BS EN ISO 14001:2004 Madlen King BSc MSc MIEMA EMS Lead Assessor Lloyd’s Register Quality Assurance Ltd BS EN ISO 14001:2004.
5.2 Personnel Use competent staff Supervise as necessary
CPA is a UKAS company The Assessment Process 2014 Seminars.
UKAS Key facts National Accreditation Body in the UK Self-funding private company limited by guarantee (Non-profit distributing) 180 full time staff.
RJC Certification - (COP 9) Bribery and Facilitation Payments Training Module – March 2014.
IA Clinic. การเตรียมการตรวจสอบ แผนการ ตรวจสอบ แผนการ ปฏิบัติงาน ตรวจสอบ หารือ หน่วยรับตรวจ รายงานผล การตรวจสอบ ติดตามผล การตรวจสอบ ผลการประเมินความเสี่ยง.
Risk Assessment – An Essential Standard
Bodil Mose Pedersen, DHI Status for implementering af ”Quality Manual”
BRC Food Safety Quality Management System Training Guide
Introduction to ISO New and modified requirements.
EuropeAid/131555/C/SER/RS Major Accident Prevention Policy Safety Management System Ernst SIMON, Styrian Regional Government, Austria Belgrade, December.
Basics of OHSAS Occupational Health & Safety Management System
Visit us at E mail: Tele: www.globalmanagergroup.com.
1 Accreditation and Certification: Definition  Certification: Procedures by which a third party gives written assurance that a product, process or service.
Safety Management. | Ongoing, structured Safety Committee Meetings Ongoing, scheduled Safety Inspections & Trending Relevant.
Verification: Quality Assurance in Assessment Verification is the main quality assurance process associated with assessment systems and practice - whether.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
Development and application of guidance documents – industry view Dr Martin Schaefer ECCA-ECPA Conference March 2014.
LEGIONELLA AWARENESS COURSE. COURSE OBJECTIVES To enable you to be aware of issues associated with Legionella within the UoP & be able to assist in the.
ASSESSMENT TASK 5 PRESENTATION ON : THE LEGAL RESPONSIBILITIES. THE LEGAL RESPONSIBILITIES. THE LEVEL OF THE STAKEHOLDER. THE LEVEL OF THE STAKEHOLDER.
SECBE SDL Accelerate EMS Willmott Dixon – Ellmer Construction Month 6 – Audit and Review 7 April 2008.
SPORTS INJURY RISK MANAGEMENT Week 11. What do you need to know… What is risk management? Understanding of what could go wrong in training and recovery.
Risk Management NDS Forum June 23 rd Example safety objective Objective 1: To protect the health, safety & welfare of employees and people at our.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
IOSH Essex Branch Event Event Subject: Legionella Awareness Date: 8 December 2010.
Hazards Identification and Risk Assessment
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
1 Professional Discussion An Additional Method November 2007.
Practitioner D Workshop Accreditation: Future developments and their impacts Andrew Marlow and Martyn Cheesbrough.
ISM Code 2010: Part A - Implementation Malcolm Maclachlan.
Legionella Awareness East Anglia Construction Safety Group 23 April 2009.
Contractor Management at Alliance Pipeline How we’re doing.
CPA is a UKAS company The Assessment Visit UKAS Processes John Ringrow – Senior Assessment Manager.
OHSAS Occupational health and safety management system.

Welcome to the FSSC Global Markets Webinar 11 September 2017, 4pm CET
World Health Organization
Maintaining Safety Standards
Document Evaluation Process May 2005 Revision
Maintaining Safety Standards
HSE Case: Risk Based Approach.
Thursday 21st September Legionnaires’ Disease - Why all the fuss?
Control of Legionella in hot and cold water systems
Roadmap to COR.
Thursday 21st September Legionnaires’ Disease - Why all the fuss?
HACCP HAZARD ANALYSIS CRITICAL CONTROL POINTS
Session 8: Risk Assessments and Water Systems
Risk Management NDS Forum June 23rd 2010.
Presentation transcript:

Legionella Risk Assessment Mike Rose

Legionella Risk Assessment Identification and evaluation of sources of potential risk Means by which exposure is to be prevented Means by which exposure is to be controlled Fundamental to the development of an effective management system Must be suitable and sufficient What constitutes suitable and sufficient?

Legionella Risk Assessment Legionnaires’ disease The control of legionella bacteria in water systems ACoP and Guidance (L8) –Very limited in detail relating to risk assessment content –No clear level of expectation for clients –Variability in risk assessment quality –Increased risk of Legionnaires’ disease Outbreaks of Legionnaires’ disease are often associated with inadequate risk assessment

BS 8580:2010 Code of Practice BS 8580:2010 Water quality - Risk Assessment for Legionella Control, Code of Practice Factors to be considered in the risk assessment –Contamination –Amplification –Transmission –Exposure –Host Susceptibility Preparations for risk assessment –Competence of risk assessor –Agreeing terms of reference –Independence.

BS 8580:2010 Code of Practice Desktop appraisal of documentation –Previous risk assessment –Current scheme of control –Maintenance and testing records –Action log –Management responsibilities Site visit/survey –Review of schematics –Visual inspection –Measurements –Sampling?

BS 8580:2010 Code of Practice Risk assessment reporting –Clear and concise –Formal document –Clear identification of hazard –Clear recommendations –Timescales Risk review

Key Points from BS 8580:2010 A clearly defined process for risk assessment Competency of the assessor Independence - Impartiality - Integrity

BS 8580:2010  Provides clear levels of expectation for: - Clients - Providers - Enforcement  Raise quality standards  Reduce incidences of Legionnaires’ disease  UKAS accreditation.

Management Scheme An appropriate management scheme will include: Responsibility list Parameters of the system to be maintained ie. temperatures, flow rates, biocide levels etc… Testing and inspection schedule Testing and inspection procedures Testing and inspection results Details of actions to take with out of specification results Training certification

Management System Auditing Don’t assume that the system is being followed Bulmers Cider outbreak 2003 (26 cases and 2 deaths) Responsible person Independent third party Areas of focus Completion of monitoring/inspection tasks Out of specification results Supporting certification eg. Legionella tests Verification of results by inspection

Summary Safe working environment Ensure water is fit for purpose Minimise downtime Avoid prosecution

Thank You