E.Kistenev, Forward Upgrade Meeting 08/18/04 Forward (Nose Cone) Calorimeter: Update 2.5 mm.

Slides:



Advertisements
Similar presentations
An SiPM Based Readout for the sPHENIX Calorimeters Eric J. Mannel IEEE NSS/MIC October 30, 2013.
Advertisements

J-C. BRIENT (LLR) 1  Introduction with pictures  Prototype design and construction  R&D on the design of the full scale calorimeter CALICE - ECAL silicon-tungsten.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
March, 11, 2006 LCWS06, Bangalore, India Very Forward Calorimeters readout and machine interface Wojciech Wierba Institute of Nuclear Physics Polish Academy.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
Testbeam Requirements for LC Calorimetry S. R. Magill for the Calorimetry Working Group Physics/Detector Goals for LC Calorimetry E-flow implications for.
10 Nov 2004Paul Dauncey1 MAPS for an ILC Si-W ECAL Paul Dauncey Imperial College London.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
28 June 2002Santa Cruz LC Retreat M. Breidenbach1 SD – Silicon Detector EM Calorimetry.
The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
27 th May 2004Daniel Bowerman1 Dan Bowerman Imperial College 27 th May 2004 Status of the Calice Electromagnetic Calorimeter.
BTeV Trigger Architecture Vertex 2002, Nov. 4-8 Michael Wang, Fermilab (for the BTeV collaboration)
October-November 2003China - ALICE meeting1 PHOS in ALICE A PHOton Spectrometer with unique capabilities for the detection/identification of photons and.
The Physics Potential of the PHENIX VTX and FVTX Detectors Eric J. Mannel WWND 13-Apr-2012.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
David Attié Club ‘ILC Physics Case’ CEA Saclay June 23, 2013 ILD & SiD concepts and R&D.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range ● Summing signals from 6 detectors on one preamp ● NCC should.
Roger Rusack – The University of Minnesota 1.
A. Sukhanov, BNL1 NCC Electronics Readout of pad structured sensors ● High dynamic range: 14 bit range, 10 bit accuracy ● Summing signals from 6 detectors.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
E.Kistenev Large area Electromagnetic Calorimeter for ALICE What EMC can bring to ALICE Physics and engineering constrains One particular implementation.
Muon trigger upgrades, missing since not aimed towards DOE funding PHENIX upgrades: view presented to DOE R&D $3.5M Construction $16.6M Au-Au p-p 200 Si-Si.
The CDF Online Silicon Vertex Tracker I. Fiori INFN & University of Padova 7th International Conference on Advanced Technologies and Particle Physics Villa.
The ZEUS Hadron-Electron-Separator Performance and Experience Peter Göttlicher (DESY) for the ZEUS-HES-group Contributions to HES Germany, Israel, Japan,
March 2004 CALOR 2004, Perugia, Italy Super-dense W-Si Calorimeter for the Forward Spectrometer Upgrade of PHENIX at RHIC (*) on behalf of the PHENIX Forward.
V.Dzhordzhadze1 Nosecone Calorimeter Simulation Vasily Dzhordzhadze University of Tennessee Muon Physics and Forward Upgrades Workshop Santa Fe, June 22,
The CMS detector as compared to ATLAS CMS Detector Description –Inner detector and comparison with ATLAS –EM detector and comparison with ATLAS –Calorimetric.
10/21/06 PragueE.Kistenev, NCC meeting NCC status report Physics case Design status Mechanics ROU’s & Front End Pad-structured Stripixel Sensors Pad-structured.
Vertex Detector Options and R&D Requirements Upgrade DC Meeting December 11, 2002 Yuji Goto (RIKEN/RBRC) for the Silicon USG.
1 Silicon Vertex Detector at PHENIX Atsushi Taketani RIKEN / RBRC 1.Physics Goal 2.Detector Concept 3.Structure 4.Pixel detector 5.Strip detector 6.Summary.
The Electromagnetic Calorimeter – 2005 Operation J. Sowinski for the Collaboration and the Builders Indiana Univ. Michigan State Univ. ANL MIT BNL Penn.
Axel Drees, Stony Brook University BNL review of RHIC detector upgrades, March 14 th 2006 Overview of PHENIX upgrades Goals of PHENIX upgrades program.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
Spin Physics with the PHENIX Silicon Vertex Tracker Junji Tojo RIKEN for the PHENIX Collaboration Advanced Studies Institutes - Symmetries and Spin July.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
11/18/2016 Test beam studies of the W-Si tracking calorimeter for the PHENIX forward upgrade Y. Kwon, Yonsei Univ., PHENIX.
CALICE collaboration CALICE collaboration J-C BRIENT LCWS02 – Jeju Island The CALICE –ECAL Silicon - V. Vrba Very FE - S. Manen Readout/DAQ - P. Dauncey.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Tracking Issues in the Central Region Craig Woody BNL DC Upgrade Meeting August 11, 2002.
Forward hard  measurement by a W/Si calorimeter Y. Kwon, J. H. Kang, M. G. Song (Yonsei Univ.) 1.
Analog readout for the forward NC Calorimeter (W-Si) BNL, Physics, 06/06/30 E.Kistenev.
A FORward CALorometer for PHENIX Richard Seto PHENIX – BNL Dec 11, 2008.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Extending Physics Capabilities of the PHENIX Detector with Calorimetry at Forward Rapidities Vasily Dzhordzhadze University of California, Riverside for.
1/28 VISITS TO COMPASS / NA58 Seminar for guides 9 March 2005 Susanne Koblitz Gerhard Mallot.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
A Forward Calorimeter (FoCal) as upgrade for the ALICE experiment at CERN S. Muhuri a, M. Reicher b and T. Tsuji c a Variable Energy Cyclotron Centre,
Extending the PHENIX physics reach Physics beyond the baseline accessible at RHIC II Capabilities needed to address the new physics Detector upgrades to.
I nstrumentation of the F orward R egion Collaboration High precision design ECFA - Durham2004 University of Colorado AGH University, Cracow I nstitute.
Durham TB R. Frey1 ECal R&D in N. America -- Test Beam Readiness/Plans Silicon-tungsten SLAC, Oregon, Brookhaven (SOB) Scintillator tiles – tungsten U.
Status of hardware activity in CNS Taku Gunji Center for Nuclear Study University of Tokyo 1.
Performance of the PHENIX NCC Prototype Michael Merkin Skobeltyn Institute of Nuclear Physics Moscow State University.
Si Sensors for Additional Tracker
n-XYTER Hybrid Developments
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Evidence for Strongly Interacting Opaque Plasma
SiD Calorimeter R&D Collaboration
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
ILC Detector Activities in Korea
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
A FOrward CALorimeter for the PHENIX experiment
Simulation study for Forward Calorimeter in LHC-ALICE experiment
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Presentation transcript:

E.Kistenev, Forward Upgrade Meeting 08/18/04 Forward (Nose Cone) Calorimeter: Update 2.5 mm

E.Kistenev, Forward Upgrade Meeting 08/18/04 Physics A-dependence of the partonic structure functions at small x  + jets / isolated lepton pairs / lepton pairs + jets A-dependence of pt-broadening (black body limit)  0 ’s Spin dependence of the gluon structure function (via W production) –lepton-isolation, total yield in e- channel

E.Kistenev, Forward Upgrade Meeting 08/18/04 - reasonable resolution for e/m showers – the only measurement which can be precise given all PHENIX Forward constrains; - e/  and charged/neutral hadron separation; -  /  0 identifier; - jet recognition, good space vector, reasonable 4-vector jet measurements; - combined muon tracking starting close to production vertex; - e/  /jet triggers; NCC MUST have superior pattern recognition capabilities fine laterally and longitudinally segmented sampling calorimeter !!! given real estate constrains ->W+Si Spec’s ….

E.Kistenev, Forward Upgrade Meeting 08/18/04 Cost of curiosity

E.Kistenev, Forward Upgrade Meeting 08/18/04 Concept in general & Cost (no cont.) ItemQuantityCost W1.8 t200k Si (calorimeter)14 m k Cables k Readout units384100k Preamps (16 ch) k Receivers5250k Digitization & pipeline k Si (strips)1.15 m 2 130k  /  0 ident. SVX4 readout 48100k Total today~2.5 m

E.Kistenev, Forward Upgrade Meeting 08/18/04 Cost saving options Further cost/benefits analysis may result in ~10% total cost reduction: (1)increasing thickness of the W plates (to 3mm) and Si layers (to ~500mkm) will reduce the total amount of Si in calorimeter; (2)(2) increasing the pad size to ~2x2 cm2 will reduce the number of channels but ….. will make pattern recognition even bigger a challenge. Biggest cost items are (1) Si, (2) Preamps and (3) Digital readout. We are currently trying to clarify answers to two questions: -Do we really have the collaborator who can do the preamp development at no cost to PHENIX – item (2); -Is there really out there the digital readout for ~10k channels available for free - item (3).

E.Kistenev, Forward Upgrade Meeting 08/18/04 ItemTotal“Confirmed” cost Probable cost W1.8 t200k Si (calorimeter): Silicon wafers Sensors production and testing 14 m (good sensors) 912k 132k 780k Si (g-p0 identifier): Silicon wafers Sensors production and testing 1.15 m k 13 k 96k Flex cables (sensor PCB interconnect) k Readout units and cables PCB 140 contacts cables k 39k 58k Preamps 16 or 32 ch ( ~2$/ch in production) without R&D and chip design 40000ch300k SVX4 and service electronics: SVX4 Service electronics (could be used electronics from Fermilab - ?) Fastbus crate k + ???=100k 18k 32k ??? Digitization&pipeline, 12 bit ADC k (30% cont) EDIA on digital processing250k (30% cont) Trigger??? Global contingency400k (20%) Total known~2.5 m> 0.3m

E.Kistenev, Forward Upgrade Meeting 08/18/04 R&D US ( BNL ++) Conceptual mechanical design (BNL/Dubna); Conceptual system design (BNL/Nevis/Trieste); Prototype mechanical design (UCR/BNL/Dubna); Component testing and prototype construction (UCR/BNL/MSU); Full readout for prototype testing (BNL/MSU); Test beam setup (at BNL/IHEP/KEK ?); Packaging concepts (BNL/MSU) MSU Pad Sensors Readout units & cables Receiver boards Prague Strip sensors, SVX4 learning curve in - electronics engineer from Prague must first to go to ORNL (October/November probably !!!!!) then to Japan (Atsushi) to help with sensor/SVX4 testing in Japan; Trieste Preamps Dubna Mechanics

E.Kistenev, Forward Upgrade Meeting 08/18/04 Getting through the development stage Prototype SensorsMSU / Trieste(strips)Early 2005Sizes mismatch Prototype readout~on shelf (MSU)Mid 2005$10k, DAQ, cables/connectors Prototype mechanicsBNL, UCR, Dubna?$10k Mechanical designBNL, Dubna+industry2005$30k Packaging concept & prototype BNL, MSU, Trieste2005Analog summing untested $30k Preamps & receiversTrieste, MSU2006$30k Dig. readout design & prototyping BNL, Nevis, Trieste2006 $250 k SVX4 learning curve & readout design for strip layers Prague, Trieste2006 Construction ~2 m Coordination of this project is probably the biggest challenge. Both R&D and production are supposedly mostly in Europe, in difference to the central tracker project we have NO strong OUT-of-US group able to serve the center of gravity for this project. If no one else is interested – this will be a role BNL must play …. with no control over project money – will it work?

E.Kistenev, Forward Upgrade Meeting 08/18/04 How to integrate NCC into PHENIX

E.Kistenev, Forward Upgrade Meeting 08/18/04 receiverdigitizer Delay/ event buffers receiverdigitizer Delay/ event buffers Trigger Sum To DCM L1 trigger board Readout method: Digitize signal as early as possible Generate trigger sum output (2X2) from the ADC output Total channel count: Calorimeter  0 identifier 8240 NCC readout concept (Chi)

E.Kistenev, Forward Upgrade Meeting 08/18/04 Possible implementation DCM Readout unit Receiver Max 256x10 inputs Readout unit Si Sensor Flex cable 256 analog lines Preamplifiers 10 units maximum Trigger processor Digitizer & FPGA based pipeline

E.Kistenev, Forward Upgrade Meeting 08/18/04 PHENIX Grand Central

E.Kistenev, Forward Upgrade Meeting 08/18/04 Terminal buildings …. NCC Receivers

E.Kistenev, Forward Upgrade Meeting 08/18/04 Real estate sharing Digitizer Boards NCC readout location on the surface of magnet pole Central tracking communication lines

E.Kistenev, Forward Upgrade Meeting 08/18/04 The end

E.Kistenev, Forward Upgrade Meeting 08/18/04 Urgent Technical progress on Skeleton support structure allowing staged implementation of the new PHENIX central detectors; Design of NCC Mechanics (in collaboration with potential manufacturers); Component analysis of the NCC readout. Managerial support for NCC needs equal standing with all other components of the new PHENIX Central; –R&D funds for 2005; Help from BZ to cement the Collaboration.

E.Kistenev, Forward Upgrade Meeting 08/18/04 What’s going on now…. MSU – ready to work … Trieste – possibly one person working part time on preamps for NCC in 2005; Prague (Institute of Physics + Charles University) – planning to apply for funding under umbrella of US-Czech Cooperation (dead line – September) Dubna – will probably help with mechanical design & construction Iowa – will work on trigger BNL / UCR / Nevis – everything else and more to come …..

E.Kistenev, Forward Upgrade Meeting 08/18/04 SPS Test Beam Data: p & e GeV/c Ultimate e - h separation 10GeV p - 10GeV e - M.Boezio, INFN, Trieste, PAMELA

E.Kistenev, Forward Upgrade Meeting 08/18/04 Partonic structure functions

E.Kistenev, Forward Upgrade Meeting 08/18/04 Reaching into saturation region  -pairs pp, pp,