Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of.

Slides:



Advertisements
Similar presentations
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation Ekuphumleni 820 feasibility and review.
Advertisements

USAID Africa Bureau EIA Procedures for Sub-Projects
Planning & Community Development Department 245 South Los Robles Avenue Predevelopment Plan Review City Council December 8, 2014.
Public Meeting Agenda – September 13, 2007 Provide an Update on the Committee’s Work Discuss Emerging Vision for Redevelopment of Town-owned Property.
Land Use Plan Pilot Overview Land Use Planning Meeting Bingwi Neyaashi Anishinaabek First Nation August 11, 2011.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HOGSBACK 300 feasibility and review of housing.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation Nyanisweni 137 feasibility and review.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DALIWE 900 feasibility and review of housing.
Presented by Christopher Msipu Phiri.  Location ◦ South Central part of Africa ◦ Landlocked Country with eight neighbors  Size ◦ Km2  Population.
Reshaping Trafford Council HALE LIBRARY BIDDERS PRESENTATION.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation EZIBELENI INFORMAL SETTLEMENT 200 feasibility.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation HAMBURG 500 feasibility and review of housing.
Preliminary Development Plan – Continuation of August 28, 2012 BoCC Hearing Board of County Commissioners September 18, 2012.
Feasibility Study GREAT KEI 6000 November 2013 PRELIMINARY DRAFT not for circulation.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
Chris Hani District Municipality LUKHANJI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KOMANI PARK CRU feasibility and review of.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation JOE SLOVO 137 feasibility and review.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GERMAN VILLAGE 360 feasibility and review of.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MSOBOMVU 500 feasibility and review of housing.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation KUWAIT 100 feasibility and review of housing plan.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SOMERSET DRIVE 200 feasibility and review of housing.
DEPARTMENT: RURAL DEVELOPMENT & LAND REFORM LAND AUDIT REPORT PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 23 OCTOBER 2013.
PUBLIC MEETING Application for Zoning Amendment 60 – 80 9 th Street East Ontario Inc. in accordance with Section 34 of the Planning Act 6 May 2013.
Amathole District Municipality NXUBA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation SIZAKELE 400 feasibility and review of housing.
Chris Hani District Municipality ENGCOBO LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation NGCOBO MIDDLE INCOME 500 feasibility and review.
Amathole District Municipality AMAHLATHI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MLUNGISI 2500 feasibility and review of housing.
Amathole District Municipality INXUBA YETHEMBA LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MIDDELBURG MIDDLE INCOME 200 feasibility.
Rental Housing Response to the Recommendations of the FFC on Rental Housing National Department of Housing 7 August 2009.
Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation LADY FRERE 800 feasibility and review of.
Integrated Strategic Development Framework KNYSNA | STATUS QUO | OCTOBER 2013 Spatial Planning KNYSNA | INTEGRATED STRATEGIC DEVELOPMENT FRAMEWORK | OCTOBER.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GLENMORE 1000 feasibility and review of housing.
Tshepo Makhanye Information Section: Research Unit.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation MAHLUBINI 348 feasibility and review.
Chris Hani District Municipality INTSIKA YETHU LOCAL MUNICIPALITY April 2014 PRELIMINARY DRAFT not for circulation TSOMO EXT 3 (250) feasibility and review.
Amathole District Municipality MNQUMA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation MNGCWE 500 feasibility and review of housing.
Amathole District Municipality NGQUSHWA LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation GCINISA 500 feasibility and review of housing.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Planning & Community Development Department 3202 East Foothill Boulevard (Mixed Use Project – Space Bank) City Council May 16, 2016 Predevelopment Plan.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Amathole District Municipality GREAT KEI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation TAINTON 350 feasibility and review of housing.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
MONDAY 2 DECEMBER 2013 STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) FOR INTEGRATED URBAN DEVELOPMENT MASTER PLAN (NIUPLAN) FOR THE CITY OF NAIROBI SUB COUNTY-
Mandeni Municipality Multi Year Housing Plan To house every resident of Mandeni in a sustainable and affordable way, with the necessary services, in progressive.
Amathole District Municipality NKONKOBE LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation BALFOUR 600 feasibility and review of housing.
Moloto Road (R573) Safety Investigations
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
“Palm Coast 145, LLC” Comprehensive Plan Amendment & Rezoning Planning and Land Development Regulation Board December 21, 2016.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
Architectural Drafting
Palm Coast 145, LLC Comprehensive Plan Amendment & Rezoning City Council Public Hearing September 5, 2017.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
PUBLIC PARTICIPATION MEETING FOR CONSTRUCTION OF A 400KV ±250 KM POWER LINE FROM BORUTHO S/S IN MOKOPANE TO BOKMAKIERIE S/S IN NZHELELE & ASSOCIATED SUBSTATION.
Application for Zoning Amendment
PRELIMINARY DRAFT not for circulation
Official Plan and Zoning By-law Amendment Application
PRELIMINARY DRAFT not for circulation
LAND AUDIT REPORT PRESENTATION TO THE PORTFOLIO COMMITTEE ON RURAL DEVELOPMENT AND LAND REFORM 17 SEPTEMBER 2014.
PRELIMINARY DRAFT not for circulation
PRELIMINARY DRAFT not for circulation
FIRE UPGRADES OF EXISTING BUILDINGS
Presentation transcript:

Chris Hani District Municipality EMALAHLENI LOCAL MUNICIPALITY March 2014 PRELIMINARY DRAFT not for circulation DORDRECHT 800 feasibility and review of housing plan for DORDRECHT 800

Feasibility and Review of Housing Plan Dordrecht 800 March 2014 by prepared for CNdV africa (Pty) Ltd environmental planning, urban design, landscape architecture 17 New Church Street Cape Town 8000 Tel: Fax: Kantey & Templer PO Box Beacon Bay, 5205 Tel: IQ Vision 110 Sarel Cillier Street Strand 7140 Tel: EASTERN CAPE DEPARTMENT OF HUMAN SETTLEMENTS Phillip Frame Road Chiselhurst Tel: +27 (0) EMALAHLENI LOCAL MUNICIPALITY Private Bag X1161, Lady Frere, 5410 Tel: Fax:

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 5 CONTENTS 2.1INTRODUCTION 2.1.2Purpose of the Report 2.1.2Background of this Report 2.1.3Terms of Reference 2.1.4Background to Settlement 2.2Status of Housing Project and Waiting List 2.3Land Identification and Ownership 2.4Engineering 2.5Environment 2.6Geo-tech 2.7Distribution of Social Facilities 2.8Current Spatial Development Framework 2.9Future Plans of Other Sector Departments 2.10Approval by Council 2.11Summary and Recommendations LIST OF FIGURES Figure 2.1.1Locality Plan Figure 2.1.2Aerial Photograph Figure 2.1.3Visual Survey Figure 2.2.1Statistical Background Figure 2.3.1Cadastral Layout Figure 2.4.1Engineering Figure 2.5.1Environment Figure 2.6.1Geo-tech Figure 2.7.1Distribution of Social Facilities Figure 2.8.1Current Spatial Development Framework LIST OF ANNEXURES Annexure 1 Ownership Annexure 2Title Deed Annexure 3Surveyor General diagram

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 6 CONTENTS GLOSSARY Informal Site : A Site occupied by a household or to which a household has customary rights, e.g. Permission to occupy (PTO, no longer formally in use) or community agreement via a meeting of elders including headman or chief. Formal Site : A site occupied by a household or to which a household is entitled to have a registered right recorded at the Deeds Registry with a title deed and surveyors diagram and/or registered General Plan. However, in many instances title deeds have not been issued nor ownership registered. In-Situ upgrade project : Formalising of tenure and installation of services and possibly also construction of a subsidised dwelling on land on which people are already living. Generally refers to a project larger than one unit. Greenfields project : New project site which there has been no formal or informal settlement, industry, infrastructure to date. Project sites are often outside of existing urban development. Infill Project : New project site within existing urban development usually on under utilised or vacant land and which often can help to promote physical integration between spatially isolated parts of the settlement. Rectification projects : Repair or rebuilding of defective existing houses built through one or other government housing program. Erven : The plural of ‘erf’ meaning plots of land each registered as an ‘erf’ in a deeds registry and forming part of a registered General Plan. Plots : The plural of ‘plot’ meaning unregistered pieces of land informally laid out. Portion: A plot of land forming part of a proposed or approved (by LM Council) subdivision layout but which has not yet been registered by the Surveyor General as a general plan and for which erf numbers have not yet been registered. ACRONYMS ECDHSEastern Cape Department of Human Settlement EIAEnvironmental Impact Assessment GPGeneral Plan HSPHuman Settlement Plan LMLocal Municipality MHSPMunicipal Human Settlement Plan SA South Africa SANBISouth African National Biodiversity Institute SDFSpatial Development Framework

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 8 INTRODUCTION PURPOSE OF THE REPORT The purpose of this report is to describe the key elements to be taken into account when assessing the feasibility of Dordrecht 800 as a Human Settlement Project and to recommend whether it should be approved or not BACKGROUND TO THIS REPORT This report is one of 3 Human Settlement Project feasibility reports for Emalahleni Municipality. It is designed so that it can be part of a single document that includes the other two projects TERMS OF REFERENCE (Part C.3 Scope of work Tender No. SCMU11-12/13-A0240) The project terms of reference for the feasibility report are summarised as follows: Ascertain the feasibility of the project within each MHSP. The study shall reveal the developmental opportunities and constraints in relation to: 1.Determination of housing demand and potential beneficiary status 2.Land identification and ownership 3.Availability of bulk services and confirmation of capacity 4.Environmental conditions; 5.Geo-technical conditions 6.Alignment with Municipal Spatial Planning 7.Visual survey (area visits) 8.Future development plans of other sector departments 9.Provision of recommendation and proposals to ECDHS 2.1.4BACKGROUND TO SETTLEMENT Registered Owner:Emalahleni Local Municipality and Dordrecht Country Club Property Description: Portion of erf 1 and portion of erf 1838, Dordrecht Title Deed Number:T1015/1926 and T56973/1992 Servitudes: None (See Annexure 3) Zoning: Unknown Site Size:11.5 Ha The Dordrecht 800 project is an urban project in Dordrecht within Emalahleni Municipality. Dordrecht is one of 3 urban centres in Emalahleni Municipality. It is classified a rural town with the role of being a service centre to the adjacent rural hinterland. Dordrecht is located on the northern boundary of the municipality approximately 71.7 km north of Queenstown along the R392 road and km south of Lady Grey along the same road. The site is a greenfield site situated within the Dordrecht commonage, north of the town and takes access from the R56 main road from Dordrecht town. It abuts Muniikville to the south across the rail line. It anticipates taking one or two fairways from the Dordrecht golf course.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 9 Locality Plan Figure 2.1.1

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 10 Aerial Photograph Figure 2.1.2

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 11 Visual Survey Fig a. Dordrecht welcome sign board on entrance of the townb. A view along Grey Street in Dordrecht CBDc. The settlement abutting the site towards the south over the railway line d. The north eastern edge of sitee. Houses directly abutting the southern boundary of the sitef. The inactive railway line on the site. g. Portion of the site where small scale land fill occurredh. The northern boundary of the sitei. The Golf course on across the R56 road

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 12

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 13 STATUS OF HOUSING PROJECT AND WAITING LISTS 2.2 Figure 2.2.1Statistical Background DORDRECHT 800 Population ( Emalahleni SDF 2010)Does not Specify Population (2011 Census)N/A No. Households (2011 Census)N/A Proposed Units (EC DHS)800 Waiting List ( Emalahleni LM)Awaited 800 subsidies have been proposed for this project. These units will comprise a project linked subsidy onto an existing greenfield site. The number of subsidies are significantly higher than the site is able to accommodate. At a plot size of 250m² per plot, the site can only accommodate 276 units. The project will have to be reduced. There has been some fill deposited on the site, possibly with a view to develop it in the future. The municipality has negotiated that the northern portion of the site, erf 1838, be donated over to the municipality by the current owners, the Dordrecht Country Club. The waiting list has been requested from the municipality and is still awaited for this project.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 14 LAND IDENTIFICATION AND OWNERSHIP 2.3 The land on which Dordrecht 800 is located is portion of Erf 1 and portion of Erf 1838, Dordrecht as illustrated on S.G No 696/1850 and S.G No. 696/1850, see Fig and Annexure 3a and 3b. It is not clear as to when Erf 1 was registered at the Surveyor – General, however the survey was completed on 22/02/1966, see annexure 3a. Erf 1838 wasa registered on 11/03/1992, see Annexure 3b. The registered owner of portion of erf 1 is Emalahleni Municipality, which comprises the larger portion of the sit. Erf 1836 Dordrecht is owned by the Dordrecht Country Club as stated in Title Deeds T1015/1926 and T56973/1992 respectively, see Annexure 1a, 1b, 2a and 2b.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 15 Cadastral Layout Figure 2.3.1

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 16 ENGINEERING (Kantey & Templer) 2.4 BULK SERVICES Existing Services.... INTERNAL SERVICES Existing Services.... GEOTECHNICAL CONDITIONS.... EXISTING INTERNAL SERVICES ARE ADEQUATE AND REQUIRE NO UPGRADING TOP STRUCTURE.... TRAFFIC IMPACT ASSESSMENT... ROADS AND ACCESSIBILITY... THE PROJECT IS FEASIBLE FOR DEVELOPMENT OF HUMAN SETTLEMENTS.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 17 Engineering (Kantey and Templer) Figure 2.4.1

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 18 ENVIRONMENT 2.5 (iii)buildings by more than 50 square metres (iv)infrastructure by more than 50 square metres within a watercourse or within 32 metres of a watercourse, measured from the edge of a watercourse, but excluding where such expansion will occur behind the development setback line. The site is situated on relatively flat land, see Figure There are no formerly cultivated fields, see Figure The Eastern Cape Biodiversity Plan (ECBCP), 2007 has developed four terrestrial Biodiversity Land Management Classes (BLMCs) according to the terrestrial Critical Biodiversity Areas (CBAs). Each BLMC sets out the desired ecological state that the area should be kept in to ensure biodiversity persistence. The site falls within CBA 2 as per SANBI data (2007) and therefore is subject to BLMC 2 guidelines according to the ECBCP. This must be ground-truthed by a botanist, prior to undertaking the Human Settlement Project, see Figure BLMC 2 permits the land to be used for Conservation and Game Farming. Settlements are not permitted. However, it can be seen on Figure that CBA 2 is shown as extending over most of the urban areas of Dordrecht. This is clearly incorrect and the mapping of CBA 2 in this vicinity has not been ground-truthed and amended. Furthermore, the ground has been disturbed by filling and the landscaping and construction of the golf course. The river flows north west of the site, see Figure Housing development would need to ensure that it remains 32m from the River or watercourse so as to avoid triggering NEMA EIA Regulations, namely Listing No. 40 as identified in the Government Notice R. 344 (Listing Notice 1). A basic assessment would be required for the following activities. The expansion of: (i)jetties by more than 50 square metres; (ii)slipways by more than 50 square metres; or

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 19 Environment Figure 2.5.1

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 20 GEO-TECH 2.6 In terms of the geotechnical information available the following is extracted from a report by Outeniqua Geotechnical Services cc, Some potential geotechnical constraints have been identified for further investigation which may have an impact on the extent of the developable land and/or the development costs. The recommended typical foundations for subsidy housing are conventional strip foundations or light rafts to cater for variations in soil profile and minor soil movements. On sloping terrain, some earthworks and retaining walls may be required to create level platforms for houses and this can have significant cost implications. Foundations should be placed on well compacted natural soil, engineered fill or rock. Founding conditions will have to be inspected by the engineer to confirm suitable soil conditions with adequate bearing capacity and to check for any seepage or groundwater problems. Preliminary and Phase 1 geotechnical site investigations are required to obtain a more accurate evaluation of the development potential of each site, but the initial indications are that the geology is unlikely to pose a significant threat to the further development of these areas.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 21 Geo-tech Figure The Site

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 22 DISTRIBUTION OF SOCIAL FACILITIES 2.7 Using 1km walking distance as a measure for accessibility or proximity to social facilities, the following can be observed in Dordrecht. Two primary schools in Munnikvlle and Sinhako are within 1 km walking distance from the site and are located south of the site, see Figure The hospital and clinic are located on the same property east of the site a little under 2 km away. They are not easily accessible on foot however efficient public transport as well as patient transport services can lower the impact of non – accessibility, see Figure The police station that would service the proposed project is located in town on Grey Street a little over the 1km walking distance, see Figure No new facilities are required to support the proposed human settlements project.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 23 Distribution of Social Facilities Figure 2.7.1

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 24 CURRENT SPATIAL DEVELOPMENT FRAMEWORK 2.8 The Emalahleni 2010 SDF makes the point that there is a need for Infill and densification in Dordrecht. It is not clear, however, from the map whether infill is proposed to take place on erven indicated as “commonage” or “unknown”, see Figure The site is situated outside the urban edge, see Figure It is also proposed using one of the fairways of the Dordrecht golf course. Tourism is one of the few economic activities open to rural municipalities and golf is an important tourism product. The fairway should be replaced, possibly along the river banks as part of the 32m buffer zone. If it does not prove viable to replace removed sections of the golf course, then the impact of this on Dordrecht’s future tourism and residential potential, should be considered. If justified, that portion of the site currently proposed on the fairway should be relocated to the land around Munnikville earmarked in the SDF. The proposed Human Settlement project is not in line with the SDF. The SDF proposed further residential development abutting Munnikville’s western boundary, see Figure While the proposed site is closer to the CBD, the decision to remove fairways from the golf course should be reviewed. If, on review, it is viable financially and geographically to replace this fairway elsewhere, then: - This should be part of the project implementation; and, - The project should proceed as proposed.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 25 Current Spatial Development Framework Figure The Site

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 26 FUTURE PLANS OF OTHER SECTOR DEPARTMENTS 2.9 The following table indicates the future plans of other sector departments proposed in the various settlements as contained in the IDP There are no projects envisaged in the IDP that will impact the proposed Human Settlement Project in the financial years 2013/2014 and 2014/2015, however it should be noted that the project is a greenfield project.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 27 APPROVAL BY COUNCIL 2.10 Awaiting Council Resolution

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 28 SUMMARY AND RECOMMENDATIONS SUMMARY The site was inspected on 31/10/2013 and the conclusions below ground-truthed. There are adequate engineering services. (K&T to confirm) In Terms of ECBCP BLMCs that apply to CBA 3, settlements are not recommended. However, the extent of the CBA 3 in and around Tsomo is clearly inaccurate as it is indicated as covering all of the developed areas. It is recommended that the site be assessed by a Botanist to ground-truth the extent of CBA 3 on the site prior to the commencement of the Human Settlement Project. It is unlikely that an EIA will be required. A detailed geo-technical site visit inspection and, if necessary, survey will be required prior to the project commencing. The project comprises 800 subsidy units onto a greenfield site. Awaiting beneficiary list from the municipality. There are no new social facilities required to support the proposed human settlements project. The Human Settlement Project is not in line with the SDF. The impacting of removing fairways from the golf course should be reviewed I the short, medium and long term. If justified, land earmarked for development in Munnikville in the SDF should be considered. Awaiting Council Resolution from the municipality RECOMMENDATIONS The project is feasible, subject to the following: A technical assessment by a botanist to ground truth the extent of CBA 3 on the site. The amendment of the urban edge to include the human settlement project. An assessment by engineers to determine whether land rehabilitation is required prior the commencement of the Human Settlement Project.

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 29 ANNEXURE 1a: OWNERSHIP PRINTOUT

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 31 ANNEXURE 2: TITLE DEED

DORDRECHT FEASIBILITY STUDY CNdV africa (Pty) Ltd2 September 2015 page 33 ANNEXURE 3a: SURVEYOR GENERAL DIAGRAM