<PRODML/> - Industry Standard

Slides:



Advertisements
Similar presentations
Condition Monitoring Roles in Asset Reliability and Regulatory Compliance Dave Haerle, Los Angeles Department of Water and Power Scott Kunze, DataSplice.
Advertisements

RISK MANAGEMENT AND ASSESSMENTS OF NATURAL HAZARDS Ron Conner Corps of Engineers.
Sustainability Implementing Sustainable Practices for Productivity Enhancement for Productivity Enhancement Presented by Ryte Byte, Inc.
Centralized Remote Monitoring of Renewable Power Plants
Rebuild Massachusetts and PHEEP Energy Information Services Project Presentation to DCAM, EOEA, HUD January 4, 2006.
Test Case Management and Results Tracking System October 2008 D E L I V E R I N G Q U A L I T Y (Short Version)
VSE Corporation Proprietary Information
Completion Object Overview June 2013 WITSML/PRODML Standards.
Advanced Forecasting & Procurement for Microsoft Dynamics NAV Presented to ABC Annual Conference 2011 May 12, 2011.
ING Chicago | September 2014 Gannett Publishing Services Continuous Improvement Journey J. Austin Ryan.
AACS Petrol &Convenience Business Acumen Program.
ECM RFP 101 Presented by: Carol Mitchell C.M. Mitchell Consulting.
Software Asset Management at Sandia National Laboratories NLIT Summit 2009 June 2, 2009 Ramona K. Gallegos Programmer/Analyst Andrew H. Steele Programmer/Analyst.
Enterprise Upstream Product Direction and Enhancements.
Parts Disposition on Service Orders - a custom solution Pieter de Bruyn Session: 4005.
Enabling Integration of Core Work Processes in Upstream Oil and Gas
Achieving Operational Excellence Enterprise Applications Business Information Systems Laudon & Laudon Ch.8 (P.266)
Achieving Operational Excellence Enterprise Applications Business Information Systems Laudon & Laudon Ch.8 (P.266)
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER 8 SUPPLY CHAIN MANAGEMENT.
Defining the Upstream Oil and Gas Sector: Exploration, Production, and Natural Gas Gathering and Processing Western Climate Initiative – Oil & Gas Collaborative.
Factors influencing open source software adoption
Facilities Management Category Management Plan Synopsis Version 1.1 (March 2015)
Shell Pilot Project PRODML Work Group 2007 DTS Reconciliation Workflow.
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Configuration Management, Logistics, and Universal CM Issues Larry Bauer Boeing Commercial Airplanes NDIA Conference Miami March 4-5, 2005
Efficient BI Solution Presented by: Leo Khaskin, PowerCubes Lab Value of Information as Business Asset.
Energistics Asia South Region Meeting (Production) PRODML SIG Update
Energistics Technical Architecture Work Group Orientation Meeting.
Summary Device protocols tied intimately to applications. A need to significantly reduce critical data update times. Current network bandwidth consumption.
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Enhancing E&P Business Efficiencies: Upstream Standards. Bottom Line Results. Energistics Annual Member MeetingRandy Clark Houston, TexasPresident & CEO.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Shell Global Solutions PRODML Business Overview Ron Cramer.
Performance Management in Practice
ECR Europe Supply Side Topics ECR Europe Executive Board meeting on 12 November 2004.
PRODML Overview – Energistics Seminar
Journey to a Real Time Enterprise
©2005 Aspen Technology, Inc. All rights reserved. Oil & Gas Integrated Operations using aspenONE Nick Barnett.
DOC ID © Chevron 2005 Chevron PRODML Pilot Activities Vendor Participants: Invensys Weatherford Tibco Halliburton Matrikon Euriware Energy Components.
Global City Teams Challenge September 29-30, 2014 Report Out: Project X.
AREVA T&D Security Focus Group - 09/14/091 Security Focus Group A Vendor & Customer Collaboration EMS Users Conference September 14, 2009 Rich White AREVA.
Thore Langeland, Ph.D. Manager IO, OLF Information sharing in the Norwegian offshore industry Hilton Americas Hotel, Houston, March.
SPE Digital Energy Conference Session Rusty Foreman - BP.
Shell Global Solutions PRODML Business Overview Ron Cramer.
1 VALUE NOW, VALUE OVER TIME © 2010 OSIsoft, Inc. | Company Confidential Empowering Business in Real Time. © Copyright 2010, OSIsoft LLC. All rights Reserved.
1 Agenda Introduction Energistics Standards Panorama / History / Participants Web Services Interoperability Standards v1.0 WITSML Version 1.x Services.
DOC ID © Chevron 2005 Knowledge Management and Open Standards Chevron Perspective John Hanten Chevron Technology Ventures Energistics 2007 Annual Meeting.
WITSML Paris 16-May-2007 Rick Morneau
WITSML Public Seminar and Vendor Exhibition: Welcome Alan Doniger, Energistics CTO May 28, 2009.
Introduction to Supply Chain Management Designing & Managing the Supply Chain Chapter 1 Byung-Hyun Ha
2015 NetSymm Overview NETSYMM OVERVIEW December
e-petroleumservices.com 1 Gas Lift Automation Dr Alasdair S Brown Technical Manager EPS Americas.
1 1 Presenter / date if required Independent, integrated thinking.
 Business Empowerment Bert van den Berg 11 March 2000 / Monterey.
ESA Harwell Robotics & Autonomy Facility Study Workshop Autonomous Software Verification Presented By: Rick Blake.
1 Future Consideration for WITSML from Total Products should migrate to the same version of WITSML Need provisions for backup in case of system failure.
PRODML Roadmap Energistics 2 nd Annual Standards Summit 2 November 07 Laurence Ormerod, Weatherford.
ROGTTC K.Sheta ROGTTC. ROGTTC K.Sheta Agenda 1.Speaker Profile. 2.IT issues in the Oil & Gas Sector. 3.Brief on ROGTTC. 4.Economic Downtime – What are.
INTEGRATED BUSINESS MANAGEMENT SYSTEMS AUTOMATING THE VALUE CHAIN FOR SMALL BUSINESSES.
Business Intelligence Energy, Resources and Utilities.
Introduction The Intercompany Integration Solution for SAP Business One Version 2.0 for SAP Business One 9.1 Welcome to the introduction of the Intercompany.
WHY VIDEO SURVELLIANCE
Fonterra Supply Chain Now and in the future 8th August 2016
UNIT –V SUPPLY CHAIN MANAGEMENT
Oil & Gas Integrated Operations using aspenONE
Deploying CIM to Bridge the Modeling Gap Between Operations and Planning Mike usa.siemens.com/digitalgrid unrestricted © Siemens AG 2017.
SAP Business Transformation Study | Healthcare | Varian Medical Systems Inc. How Do You Implement and Comply with New Standards for Revenue Recognition?
WHY VIDEO SURVELLIANCE
PRODML WG07 Chevron Pilot
Energy Storage Roadmap & Flexibility Roadmap Information Session
Presentation transcript:

<PRODML/> - Industry Standard <PRODML/> PRODuction xML Standard Overview Rick Morneau Transformational Information Technology Focus Area Manager Chevron Energy Technology (on behalf of the PRODML Community) <PRODML/> - Industry Standard

<PRODML/> Agenda What is PRODML Motivation Scope Proof of Concept Pilot - 2006 Current Status Summary <PRODML/> - Industry Standard

<PRODML/> What is it? A shared solution for information exchange allowing Upstream Oil & Gas Companies more easily execute those software applications used to optimize production Production optimization involves integrating real time data from specialty, multi-vendor software applications and streamlining work processes to enable oil and gas field operational efficiencies A project that will develop software products to improve data exchange and work process efficiency in production optimization <PRODML/> - Industry Standard

<PRODML/> - Industry Standard Motivation … <PRODML/>  Optimization 0.0 0.5 1.0 1 7 13 19 25 Time Oil Production . True Production Potential Periodic Manual Optimization No Optimization Activity <PRODML/> - Industry Standard Modified from Ron Cramer, Shell Global Solutions

<PRODML/> Motivation Integration Between Operators & Vendors Vendors and operators act as systems integrators Must address issues such as: Remote maintenance & privacy Software robustness Data quality & attributes Changes in versions Operator Applications Vendor #1 Reservoir Simulator Vendor #4 Optimizer Vendor #5 Network Model Vendor #2 Well Model “Solution” Integrator Vendor #6 Reservoir Simulator Vendor #3 Historian Vendor #8 Daily Reports Vendor #7 Alerting Tool Vendor #9 Collaboration Environment <PRODML/> - Industry Standard From Stan DeVries, Invensys

<PRODML/> Motivation Efficiency = time and money Up till now, oil companies and service providers wasted time and effort converting common data PRODML will allow the transfer of production data more easily saving money across the industry allowing us to concentrate on the real business, not data management The Bottom-Line PRODML is in our business interest <PRODML/> - Industry Standard

<PRODML/> Producing Asset Scope The Production Domain Initial Scope From bottom of the well to initial separation Gathering Separation & Distribution Injection (Water, Steam, CO2) Water Handling Gas Treating Facilities Oil Treating Facilities Export Facilities Reservoir Management: Gas & Oil Contract Deliverability Decisions we can effect in a day

<PRODML/> Chevron 2006 Pilot Make it real Real Problem – water handling Real Data – used all data from existing field Real Data Volumes - ~ 1000 producing well and ~ 700 injection wells Real field time – SCADA (minutes) & well tests (daily) <PRODML/> - Industry Standard

<PRODML/> Chevron 2006 Pilot Problem Statement Producing water – need to handle Produced water Inject it Store in tank Store (inject) in disposal wells <PRODML/> - Industry Standard

Chevron Proof of Concept Pilot <PRODML/>PRODuction xML Standard 1 Trigger: Clock set for once a day Invensys Notification GiveData 2 Get tank data (7 days) 12a 12b 3 Model: 7 day tank forecast 5b 5a 4 Pass tank forecast 5 Alarm to notification Data Integrator GiveData 6 Get well status forecast 11 7 Model: Maintenance forecast 4b 8a 8b 6a 6b 8 Get Field forecast GiveData GetDataAsync GetDataSync 4a 9 Get allocated production 1000 wells Invensys InFusion Tank Forecast Halliburton DSS Well Production Forecast Weatherford LOWIS Well Status Forecast 3 1 10 7 10 Model: 7 day production forecast 11 Model: Well vs. Facility 2a 2b 9a 9b GetDataSync 12 Consolidate data Remove “Add to Store” etc. Point out complex workflow and integration between various applications. Energy Components Daily Allocation / Status / Well Listing GetDataSync Invensys Facility SCADA History Local System Field Gas Sales History Local System (SS) Field Oil Sales / Inventory History Weatherford Well Test History Weatherford Status History <PRODML/> - Industry Standard

<PRODML/> Chevron 2006 Pilot Result Complete Success Demonstrated scalability Provided Confidence <PRODML/> - Industry Standard

<PRODML/> Chevron Current Complete PRODML Training Actively participating in PRODML ’07 Work Group Actively participating in PRODML SIG Actively planning PRODML ’07 Work Group Pilot <PRODML/> - Industry Standard

<PRODML/> 2006 Goals when we started Summary of 2006 End goals Commercial applications (not a stack of paper) Change the software landscape in upstream operations Completion target of September 2006 After September, identify next high value items Increase Industry participation www.prodml.org PRODML using WITSML model: End result of PRODML is commercial applications, not a stack of paper PRODML will alter the software landscape in upstream Completion of PRODML project is SOON – September The plan is to identify next high value need for data exchange at end of PRODML to ensure forward motion Tackling production optimization is the toughest & number one issue Next standards will likely be easier. Example: Reporting would have been easier How can you be involved? www.prodml.org Follow along Provide feedback PRODML participants stand up Shake their hand, pick their brain <PRODML/> - Industry Standard

<PRODML/> - Industry Standard Thank You Rick Morneau <PRODML/> - Industry Standard