Thailand situation analysis and initial idea for case study Chris Greacen Sopitsuda Tongsopit Chuenchom Greacen Palang Thai.

Slides:



Advertisements
Similar presentations
Renewable Energy Targets and Policy Strategies in Mekong Countries Policy and Incentive Mechanism for Renewable Energy Development in EEP Mekong Countries.
Advertisements

Thailand’s Energy Conservation Policy : Industry Programs
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Thailand’s Energy Conservation Policy : Industry Programs Prasert Sinsukprasert Ph D Department of Alternative Energy Development and Efficiency 3 rd Policy.
topics Burmese energy sector (compiled by MEE NET)
Thailand’s Renewable Energy Policy & Investment Opportunity
Citizen’s meeting on Power Sector Reform Chris Greacen November 25, 2007 Bangkok, Thailand Solar, wind, hydro, CHP in Thailand: technology, cost, potential,
Renewable Energy in Islamic Republic Of Iran
Chris Greacen Li Garden Hotel, Hat Yai, Thailand 20 Nov, 2005 Solar, wind and micro-hydropower: options, costs, resource assessment Palang Thai.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
1. What Do We Know About Our Energy and Climate Policy? John W. Rowe Chairman and CEO, Exelon Corporation Grand Challenges of the 21 st Century Conference.
Practical Policies for Decentralized Electricity Generation Chris Greacen Palang Thai MEE-Net Workshop 18 January 2012 Bangkok.
Financing renewable energies in Myanmar COMMITTEE 2 ON RENEWABLE ENERGIES AND CLIMATE CHANGE ADAPTATION.
LEVELIZED COST OF ENERGY. Summary Levelized costs are calculated as a proxy for the PPA price between a third-party developer and a utility LCOEs amortize.
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
China’s Sustainable Energy Policy
Empowering Rural Electrification in Myanmar: Opportunities and Policies Tungapuri Hotel Nay Pyi Daw, Myanmar Dr. Chris Greacen March 9, 2013.
World Bank Experience with Power Sector Baselines Workshop on CDM Methodologies for Grid-Connected Power Projects Buenos Aires, 8 December 2004 Fernando.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy 6 th January 2005.
1 Energy Efficiency and Conservation in Thailand Department of Alternative Energy Development and Efficiency (DEDE) Ministry of Energy March 2005.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
RES/CHP Support Scheme in Slovenia Conference: Sustainable Energy Development in SE Europe Irena Praček, Director, Energy Agency of the Republic of Slovenia.
Chris Greacen Chiang Mai, Thailand 24 January 2013 Grid-connected renewable energy in Thailand under the VSPP and SPP programs MEENet workshop, session.
Energy Policy and Planning Office The Energy Conservation Promotion Fund for Developing RE Projects in Thailand Pinnara Premcharoen Policy and Plan Analyst.
GEF UNFCCC Asia & Pacific Regional Workshop on Transfer of Technology 17 January 2000, Cebu, Philippines Johan Wide, GEF Secretariat.
Biogas System Solar Hot water Charity Tournament 2012 Biomass Programs supporting Energy-Efficiency Dr. Twarath Sutabutr Deputy Director-General Department.
Electricity in Thailand: current arrangements, impacts, alternatives 2 August, 2006 ERI Chris Greacen
Feed-in tariffs and south-south policy/technology transfer: The evolution and implementation of Very Small Power Producer (VSPP/SPP) Regulations in Thailand.
Energy situation & Energy policies in South Africa Presented by: Thembani Bukula.
Global Energy Issues Burgeoning Demand – U.S., China, India… Peak Oil, Natural Gas / Supply Constraints Climate Change / Emissions Regulations Security.
Environmental Protection and Infrastructure Operational Programme Tímea Baán EIOP Managing Authority Ministry of Economy and Transport.
‘Working for Desirable Future’ : Transparency and participation in electricity sector planning in Thailand Suphakit Nuntavorakarn Healthy Public Policy.
1 Development of Renewable Energy Application in Vietnam Energy and Petroleum Department MINISTRY OF INDUSTRY.
Integrated electricity planning: introduction & demonstration Tira Foran, PhD Unit for Social and Environmental Research, Chiang Mai University Mekong.
May 20, 2009 MeeNet, Thailand Micro-hydro, biomass, biogas: technology, cost, potential, applications Palang Thai.
Government Policy and Supports for Energy Efficiency in Industry Sector Krairit Nilukuha Director General Department of Alternative Energy Development.
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
CDM Projects: Renewable Energy and Energy Efficiency Projects Project cycles and Technical Issues.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Michael R. Walker Research Director IGCC Financing Project Kennedy School of Government, Harvard University PH: , FX:
RDL Utility Based Financial Incentives for Renewable Energy & Energy Efficiency in New Zealand EGNRET Workshop Honolulu, Hawaii, USA 30 March – 1 April,
Renewable Energy Policies of Germany and China Masood Ahmed CRER, SZABIST December 24’ 2009.
Grid-tied decentralized power generation: experience from Thailand and Tanzania Chris Greacen Palang Thai AEPF 9 17 October 2012 Vientienne, Lao.
Clean electricity options for a free Burma Chris Greacen Palang Thai Seminar on “Energy: Tragedy in Burma” 20 November 2007 Chulalongkorn University.
Combined Heat and Power Workshop Report and Next Steps Power Committee Briefing 7/15/03.
Thailand’s VSPP Program 15 March 2010 Energy Policy and Planning Office Presented to representatives from Tanzania.
Electricity in Thailand: current arrangements, impacts, alternatives 27 June, 2007 ERI Chom Greacen Chris Greacen
1 RENEWABLE ENERGY POLICIES TO DEVELOP INVESTMENTS Juan Alario, Associate Director European Investment Bank (BEI) 10th Inter-Parliamentary Meeting on Renewable.
Evolution of Thailand’s Very Small Power Producer (VSPP) regulations Humboldt State University 11 September 2008 Chris Greacen Palang Thai.
The story of Thailand’s centralized power sector
Selling renewable energy profitably to the grid: The evolution and results of Very Small Power Producer (VSPP) Regulations in Thailand and Tanzania Regional.
Thailand’s experiences in the power sector Chuenchom Sangarasri Greacen Chris Greacen, Ph.D. Palang Thai International Seminar on Dams and Sustainable.
Energy for Urban Development in Thailand by Munlika Sompranon 24 June 2015 National Dialogue on the Urban Nexus in Thailand.
World energy production by source in 2004: Oil 40% coal 23.3% natural gas 22.5% hydroelectric 7.0% nuclear 6.5% biomass and other 0.7%.
Governance issues in the Thai Electricity Sector WRI/TEI Workshop on Electricity Governance in Asia Chuenchom & Chris Greacen Palang Thai:
Renewable Energy for conviviality: some experiences from Thailand Chris Greacen Palang Thai Eco-Village Training 20 December 2007 Mu Ban Dek, Kanchanburi.
Presenter: Aidan Rogers. Attorney-At- Law President – Barbados Renewable Energy Association.
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
EABC/EAC ENERGY CONFERENCE: 8-9TH JUNE, AVAILABLE BUSINESS OPPORTUNITIES IN THE ENERGY SECTOR By Eng. B.J. Mrindoko.
11 Regional Renewable Energy Study Review of Findings and Forecasts Presented to: Climate, Energy and Environment and Policy Committee Metropolitan Washington.
Opportunities for renewable energy investments in Serbia
The Energy Conservation Promotion Fund
Renewable energy potential in Thailand
Financing of Solar power plants
NS4960 Spring Term, 2018 China: Expanded Renewables
Connecting small renewable energy generators to the grid in Thailand: case studies & technical requirements Renewable Energy Forum Thursday, 28 October.
Connecting pigfarm biogas to the grid in Thailand – VSPP regulations
Wind Development & Policy Options
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Thailand situation analysis and initial idea for case study Chris Greacen Sopitsuda Tongsopit Chuenchom Greacen Palang Thai

Outline Drivers Status Constraints Case study ideas

Drivers

5 AEDP : 25% of final energy consumption by 2021

$ Small Power Producer (SPP) and Very Small Power Producer (VSPP) regulations

7 Thailand’s ADDER (FiT) Rates (in USD/kWh)

Thai Government loans funds at 0% interest to commercial banks for investment in: Energy efficiency improvement projects Renewable energy development and utilization projects January 2003 – present 7000 M Baht 11 local financial institutions have participated. Max loan amount: 50 MB Max. interest rate: 4% Max. loan period: 7 years Revolving Fund Low cost financing

9 A source of venture capital for ESCOs to jointly invest with private operators in energy efficiency & renewable energy projects. The program targets SMEs & small projects. Investor Technical Assistance ESCO Venture CapitalEquipment Leasing Carbon Market Equity Investment Credit Guarantee Facility Fund Manager Investor ESCO Fund Investment Committee Energy Conservation Promotion Fund ESCO Fund Low cost financing

10 Thailand’s Board of Investment (BOI)’s tax incentives for renewable energy projects: Corporate income tax holidays up to 8 yrs. Additional 50% reductions of corporate income tax for 5 yrs Import duty reductions or exemptions on equipment and raw materials Tax Incentives Tax incentives

Status

Biogas from Pig Farms Reduces air and water pollution Produces fertilizer Produces electricity 8 x 70 kW generator

Biogas from Pig Farms

Uses waste water from cassava to make methane Produces gas for all factory heat (30 MW thermal) + 3 MW of electricity 3 x 1 MW gas generators Korat Waste to Energy Cassava biogas

40 kW Mae Kam Pong, Chiang Mai, Thailand Micro hydropower

Rice husk-fired power plant 9.8 MW Roi Et, Thailand

Lopburi solar PV – 73 MW (over 1,000 rai = 160 hectares) Signed PPAs for 767 MW of PV (SPP + VSPP)

Construction underway for 207 MW wind farm

Feb 2007 Thailand VSPP Status 18 MW online

Mar 2012 Thailand VSPP Status 1222 MW online (68-fold increase since 2007) PPAs signed for additional 3820 MW

VSPP results in Thailand

Comparison between the current on-grid RE status or pipeline status vs. target.

Thailand’s Solar Goldrush: Systems by Stage of Applications

Constraints

Management Committee (June 2010) New committee set up after PV ‘gold rush’ Role: to decide which projects proceed – Lack of clear criteria – Political connections and intervention Composition: utilities, government Results: all types of RE projects that are under different stages of development are experiencing bottlenecks in the permitting processes. Allegations of corruption

Department of Factories New! all types of power projects (though mostly renewable energy) are experiencing severe bottlenecks in the permitting processes.

Trend of MW in the Pipeline (All Renewables) “Healthy Pipeline?” 28 Formation of Managing Committee June 2010 bid bond introduced

Micro-hydropower Constrained by water rights Grid-connection of DEDE village micro- hydropower projects constrained by anti- corruption rule that prohibits a group of individuals from receiving revenues from government assets.

Biomass Constrained by high biomass fuel prices – Business plan: biomass = 800 baht/tonne – Actual: biomass = 1000 baht/tonne Low CO2 price

Solar No new solar applications accepted since June No price differentiation for smaller projects (solar farms account for 99% of installed grid- connected capacity).

PDP 2010 New generation includes: 11,669 MW of imports 8,400 MW of coal plants 16,670 MW of gas plants 5,000 MW of nuclear

PDP 2010 (revision 3)

Choice of supply options considered in the PDP by EGAT 700 MW Coal-fired power plant 700 MW gas-fired combined cycle plant 230 MW gas-fired open cycle plant 1,000 MW nuclear plant Hydro imports are politically negotiated outside of PDP process DSM/EE, RE, Distributed generation not considered as supply options

EGAT’s cost assumption for planning Source: EGAT, PDP 2007 Presentation at Public Hearing, 2 April Nuclear Coal Gas CCGT Oil (Thermal) Gas turbine RE Solar Wind Waste Biomass Cost (Baht/kWh)

Supply options Cost estimate (Baht/kWh) Generation Trans missio n 1 Distrib ution 2 CO 2 3 Other envi impacts 4 Social impacts Total DSM0.50 – SPP cogeneration (PES > 10%) VSPP (Renewable) Bulk supply tariff (~ 2.62) + Adder (0.3 – 8) – – low 2.92 – gas CC low – medium 3.93 Coal High5.82 Nuclear – High – very high หมายเหตุ 1. ใช้สมมติฐานว่าต้นทุนร้อยละ 12.4 ของค่าไฟฟ้ามาจากธุรกิจสายส่ง 2. ใช้สมมติฐานว่าต้นทุนร้อยละ 14.5 ของค่าไฟฟ้ามาจากธุรกิจจำหน่าย 3. ค่า CO2 ที่ 10 ยูโร/ตัน 4. ค่า Externality ตามการศึกษา Extern E ของสหภาพยุโรป และนำมาปรับลดตามค่า GDP ต่อหัวของไทย The World Bank, Impact of Energy Conservation, DSM and Renewable Energy Generation on EGAT’s PDP, ตามระเบียบ SPP 7. ที่มา : กฟผ. 8. California Public Utilities Commission (CPUC), 2050 Multi-Sector CO2 Emissions Abatement Analysis Calculator, Cost of liability protection, Journal “Regulation” 2002 – 2003.

Financial criteria for utilities link profits to investments –Thailand uses outdated return- based regulation –WB’s promoted financial criteria such as self financing ratio (SFR) also have similar effects ROIC (Return on Invested Capital means: the more you invest, the more profits Incentive structure for utilities: the high their investment budget, the more profits 5.8% Result : EGAT favors capital-intensive investments (centralized plants) by its organization or subsidiary companies. Allowing more EE or RE generation hurts EGAT’s bottom line ROIC = Net profit after tax Invested capital EGAT 6.4% MEA PEA

Summary of structural issues Utilities are incentivized to prioritize capital- intensive, centralized generation Lack of integration of EE/RE in planning process – Arbitrary quota system Costs – Exclusion of T&D costs (not to mention externality costs) makes cost comparison between RE and other generation unfair

Other RE issues Creation of “Management Committee” to screen VSPP applications creates governance problems – Lack of clear criteria – Political connections and intervention Lack of enforceable environmental safegard framework for <10MW generation Lack of policy certainties Lack of predictability and periodic updates of purchase prices to reflect changes in costs Lack of price differentiation for smaller-scale RE Lack of financial support for community/small-scale RE

Ideas for research

Research question What regulatory changes will be necessary to rapidly scale up renewable energy investment by the year 2021? Framework: – Pricing structure – Permitting process – VSPP + SPP regulations and tariffs: fair, streamlined, transparent, accountable – Monitoring and evaluation

Thank you For more information, please contact