23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

The group is developing readout electronics for initial use with the prototype test-stand at Fermilab. This work will contribute towards the design and.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
JLab High Resolution TDC Hall D Electronics Review (7/03) - Ed Jastrzembski.
GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
Beam test of the microscope prototype and active collimator preliminary report on the parasitic beam tests in Hall B April 2011 Richard Jones, Igor Senderovich,
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
GlueX Collaboration Meeting May 12-14, GeV Trigger Electronics R. Chris Cuevas Trigger Hardware/Firmware Status  Global Trigger  Installation.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
GlueX CDC Update and Electronics Outlook Michael McCracken Carnegie Mellon University Advisor: Curtis Meyer Medium Energy Physics GlueX Electronics Meeting6-7.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
July 16/17, 2002 MUEGAMMA review PSI1 Slow Control.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
GlueX CDC Update and Electronics Outlook GlueX/HallD Collaboration Meeting Jefferson Lab April 2006 Michael McCracken Carnegie Mellon University.
GlueX Collaboration Oct '06 C. Cuevas 1 Topics: Projects and Progress 250Msps Flash ADC Energy Sum Module The Bigger Picture DAQ/Electronics Work Plans.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
DAQ Status Report GlueX Collaboration – Jan , 2009 – Jefferson Lab David Abbott (In lieu of Graham) GlueX Collaboration Meeting - Jan Jefferson.
25/05/2010 RD51 Collaboration Meeting Cisbani-Musico-Minutoli / Status JLab Electronics 1 Status of the APV25 electronics for the GEM tracker at JLab Evaristo.
06/07/041 F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J. Barbosa
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Fiber Tracker Update Edward McKigney Imperial College July 3 rd, 2002.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
9 September 2004The Straw Tube Chamber1 The CDC Curtis A. Meyer Carnegie Mellon University Physics Requirements and Specifications Prototype Construction.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Curtis A. Meyer 13 December, 2003 The Detector Review Review the tracking and calorimeter elements Vertex Detector Straw Tube Chamber Forward Tracker Barrel.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne VI. Nuclear Physics (NP)
The GlueX Detector in Hall-D at Jefferson Lab February 16, 2010 David Lawrence, Jefferson Lab (for Curtis A. Meyer, Carnegie Mellon University) July 7,
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Detector for GlueX JLab PAC 23 Jan 20, 2003 Physics Beamline Hall D GlueX Detector Software Trigger Computing Environment PRL.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
D0 PMG February 15, 2001 PMG Agenda February 15, 2001  Overview (Weerts) u Detector status u Reportable milestones u Summary  Operations Organization.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
A 250 MHz Level 1 Trigger and Distribution System for the GlueX Experiment David Abbott, C. Cuevas, E. Jastrzembski, F. Barbosa, B. Raydo, H. Dong, J.
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
D. Breton, S. Simion February 2012
Detector for GlueX JLab PAC 23 Jan 20, 2003 Beamline Hall D GlueX
GlueX Flash ADCs 3425 PMT channels Forward, Barrel Calorimeters
Fernando J. Barbosa F1TDC Status Update Hall D Collaboration Meeting Indiana University – Bloomington, IN May 20-22, 2004 Fernando J.
CLAS12 Timing Calibration
Hall D Front End Electronics
Presentation transcript:

23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer

23 July, 2003Curtis A. Meyer2 Detector Electronics Start Counter – VLPC based on FNAL D0 design. Straw-tube Chamber – Preamplifiers into Flash ADCs Forward Drift Chambers – Preamplifiers into Flash ADCs (and TDCs) Cherenkov Counter: Phototubes into Flash ADCs Time-of-flight wall – Phototubes into TDCs Photon Tagger System: Phototubes into ADCs and TDCs

23 July, 2003Curtis A. Meyer3 Detector Electronics (cont) Barrel Calorimeter (Pb-SciFi) Phototubes into Flash ADCs (Hybrid PMTs) Forward Calorimeter (Pb-Glass) Phototubes with special bases into Flash ADCs. Backward Veto Wall (Fe-SciFi?) Phototubes into Flash ADCs (Hybrid PMTs)

23 July, 2003Curtis A. Meyer4 Total GlueX Manpower Faculty ~ 65 Jlab University

23 July, 2003Curtis A. Meyer5 Present Manpower P. Smith (IU 100% - FADC, C.W. bases) F. Barbosa (Fast Electronics 30% - TDC, FE electronics) Ed Jastrzembski (DAQ 80% - TDC) David Abbott (DAQ 60% - TDC) James Proffitt (Fast Electronics 30% - TDC) Jeff Wilson (Fast Electronics 20% - TDC) David Doughty and students (CNU 20% - Trigger) for Electronics

23 July, 2003Curtis A. Meyer6 Accomplishments F1TDC – 32/64 Channel Prototype built. - Will be used in both Hall C and Hall B FADCs – 1 channel 8-bit, 250 MHz prototype built. Detailed Trigger and Rate Studies Carried out - High speed network tests into phase 2. Robotic Electronics Facility at IU installed last month and is starting to run.

23 July, 2003Curtis A. Meyer7 Front-end Accomplishments Cockroft Walton bases for Pb Glass PMT used in the RadPhi experiment. Studies of Hybrid PMTs for calorimeter underway. The progress here is directly coupled to the status of prototype detector work.

23 July, 2003Curtis A. Meyer8 Manpower and Tasks F1TDC FADCs Trigger Front-end Production and Testing

23 July, 2003Curtis A. Meyer9 Electronics Support JLab GlueX Group JLab Staff Hired with construction funds Construction (at JLab)

23 July, 2003Curtis A. Meyer10 F1TDC Production for use in experiments in Halls B & C. Operation will provide feedback on the design Eventual design updates. TDC design – Effort will continue at roughly half the current level through the next phase.

23 July, 2003Curtis A. Meyer11 Flash ADCs Production of an 8-channel module. Testing of units with prototype detectors. Open issues in design based on the results with prototype detectors. - 8-bit, 10-bit, … resolution. - Clock speed needed. - Final density of packing FADC design – A similar effort as used for the entire TDC effort will be needed.

23 July, 2003Curtis A. Meyer12 Trigger Complete test/studies with the high-speed crate interconnects. The current technology is not fast enough, but the path is clear from 160MB/s -> 500MB/s S-Link64 64-bit version of current technology Integrate XILINX into cards and PowerPC into boards to achieve 800MB/s Trigger design – continued effort at current level with additional students

23 July, 2003Curtis A. Meyer13 Front-end Electronics Prototypes of both the straw-tube and planar drift chambers are currently being built. With these, we will be able to study front-end (preamps). We are currently working with Hybrid-PMTs for the barrel calorimeter. Start counter design calls for VLPCs based on D0 Design at FNAL. In contact with FNAL. Front-end design – DC pre-Amps, VLPCs, Hybrid PMTs, PMT voltage dividers. Depends on results of detector prototypes and amount of customization required

23 July, 2003Curtis A. Meyer14 Production and Testing Production and testing – supervision of temporary manpower to receive, test and install Budgeted as part of construction

23 July, 2003Curtis A. Meyer15 Summary To date, the collaboration has focused on electronics that are more generally applicable than the GlueX experiment. While we have accomplished a great deal, the effort has been limited by the lack of “CD0” for the upgrade project. We have a solid plan to move forward with all the electronics for the experiment.