Pathways to change Day 2, Informing Changes Workshop 4: Pathways to change.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Environmental Management System Implementation
[Organisation’s Title] Environmental Management System
CONTRACTORS AND SOFT LANDINGS. TARGETS Smooth Handover at Practical Completion Defect Free installation Completed Environmental and BMS Testing Conversant.
PERFORMING EFFECTIVE BUILDING SYSTEM RECOMMISSIONING STUDIES Joseph J. Watson, P.E. Booth # 312.
Tas seminar/demonstration on Part L 2006 of the Building Regulations Presented by Alan Jones EDSL February
Marion Fraser Fraser & Company.  National Code  Provincial Regulation  Municipal Enforcement  Improved codes important but not sufficient  do not.
Energy Performance of Education Buildings – the performance gap and its consequences Dr Kerry J Mashford, Chief Executive, National Energy Foundation Greening.
ESTATES SERVICES Soft Landings – An Introduction 2013.
From Strategy to Reality: Delivering Sustainability Daniel Botterill & Michelle Dixon – Sustainable Resource Solutions Katherine O’Brien – University of.
GReening business through the Enterprise Europe Network EN Giovanni FRANCO European Commission Enterprise and Industry EN
Energy Efficient Operations: Giving facility operators the tools to optimize building performance The B3 Energy Efficient Operations Manual Garrett Mosiman.
Energy Performance Analysis with RETScreen
Developing an Energy Management Plan for the Whole School United Learning – 18 th February 2015 Malcolm Hanna, Technical Director Improving the use of.
The role of DECs, ESOS and other Regulation in identifying energy saving opportunities Malcolm Hanna, Technical Director, National Energy Foundation Improving.
Energy Efficient Operations Presentation to ASHRAE Energy Expo October 2, 2013 Center for Energy and Environment.
Chapter 7 Controlling - To Ensure Results
Quality evaluation and improvement for Internal Audit
Post Occupancy Evaluation of Sustainable Development Projects in the Education Sector Leanne McMillan, Senior Consultant, BRE Scotland.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
1 Kevin Cope Imperial College London Head of Building Operations Carbon Management Plans - achievements, maintenance and the future.
Total Energy Usage As A Measure of Building Performance 30% Building Energy Savings Through an Energy Lifecycle Approach to Building Construction, Retro-fitting,
RAM Modelling in the Project Design Phase Friday 30 th April, 2010 Paul Websdane Reliability Modelling for Business Decisions Asset Management Council.
Presentation to Chief and Council A joint initiative brought to you by: Ministry of Energy and Mines BC Hydro Developed and delivered by: Quality Program.
Implementing an Energy Management System Brendan Thorne Aughinish Alumina Limited.
Basics of OHSAS Occupational Health & Safety Management System
August 10, 2007 CONTROL YOUR DATA CENTER! Tune your Legacy Data Center to improve overall efficiencies.
3- System modelling An architectural model presents an abstract view of the sub-systems making up a system May include major information flows between.
Bill Harrison New Jersey Chapter February 3, 2009.
ISO OPERATIONAL CONTROL
BPE- Maximising the Outcomes Dr Kerry J Mashford, Chief Executive, National Energy Foundation Innovate UK: BPE Outcomes - November 2014 Improving the use.
National Trust energy approaches. –
Building Sustainability Dr Kerry J Mashford, Chief Executive, National Energy Foundation Improving the use of energy in buildings.
Cutting the Corporate Energy Bill 20 th November, 2013 Marginal gains and why they matter David Collier, Energy and Sustainability Manager.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU. Quality Assurance José Viegas Ribeiro IGF, Portugal SIGMA.
Reviewing the Audit Results. Defining a Quality Base Year is Key to Maximizing Project Value n Base year is the mutually agreed upon pre-retrofit annual.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Bill Harrison Cleveland - Akron Chapters Joint Meeting March 16, 2009.
14 July 2009 JOHN WHEATLEY COLLEGE EAST END CAMPUS.
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
ISO DOCUMENTATION. ISO Environmental Management Systems2 Lesson Learning Goals At the end of this lesson you should be able to:  Name.
Improving Energy Performance of New and Existing Buildings Dr Kerry J Mashford, Chief Executive, National Energy Foundation CIBSE Building Performance.
Mandy Forrest VAS/ Anne Giller SCC Commissioning for the Terrified.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
LINKING OPPORTUNITY AND NEED: MAXIMISING BENEFITS OF PHYSICAL REGENERATION SCR Mixed and Sustainable Communities Learning Network 26 March 2009.
Ultra Efficient Lighting For Future Wards LCB-HEALTHCARE Pilot Project Steph Holmes MCiPS Head of Procurement The Rotherham NHS Foundation Trust.
Innovate UK BPE- Maximising the Outcomes Dr Kerry J Mashford, Chief Executive, National Energy Foundation Ecobuild 2015 Improving the use of energy in.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Building Performance Evaluation £8m funding between 2010 & 2014 Case study investigations Identify factors that encourage good performance Domestic &
Embedding Carbon Management within Public Sector Organisations 17 th November 2015.
GRES Education. The goals of the GRES Education program are to: help school districts reduce energy use, conserve water, and minimize waste production.
Capital Insight Pty Limited ABN Berry Street North Sydney NSW 2060 t f Westmead Millennium.
ASPEC Damaging Energies New Staff Induction What is this course about? This course is designed to talk through the major damaging energies on site. It.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
REBUILD AMERICA. Why look at the bills? l Bills are the bottom line –they prove the savings!
I © 2015 Bentley Systems, Incorporated Andrew Smith, Feb 2016 How BIM can positively influence rail O&M.
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Alex Ezrakhovich Process Approach for an Integrated Management System Change driven.
CDM Construction Design and Management
DECC Framework Contract for Innovation Delivery Support – presentation to potential contractors Thursday 20 October.
Metering and Monitoring  The Business Case.  Implementing the project.  Benefits – accurate data and data analysis.  On-going challenges.
Plant Maintenance Experts CPM Engineering offers diagnosis and repair of electrical and mechanical equipment. From pump, gearbox & motor repairs, machining.
Human Error Reduction – A Systems Approach.
Australian National Audit Office Better Practice Guide: Implementation of Programme and Policy Initiatives Presentation to the Canberra PMI Chapter 7 March.
Empowering Covenant of Mayors Coordinators and Supporters to assist municipalities in implementing and monitoring their Sustainable Energy Action Plan.
The Design Team Carl James.
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
UNIT V QUALITY SYSTEMS.
From the bottom, up: people are the key to persistent energy savings
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Presentation transcript:

Pathways to change Day 2, Informing Changes Workshop 4: Pathways to change

Pathways to change Day 2, Informing Changes Workshop 4: Pathways to change What does the data tell us? Insights from the data Insights and themes from BPE What needs to change and who needs to know? The key messages emerging and who needs to know The audiences - who controls what? who can deliver change? Exercise 1 Making it happen What do people need to make it happen (occupants, operators, designers) Exercise 2 Discussion

Pathways to change Day 2, Informing Changes What does the data tell us?

Pathways to change Day 2, Informing Changes What does the data tell us? Actual (metered) energy use significantly higher than benchmarks and design targets BPE early findings showed actual is 2 – 9 times higher than design targets (BER) Benchmark comparisons can be useful to gain attention, highlight the task – simple message for all.

Pathways to change Day 2, Informing Changes What does the data tell us? Key Themes Hours of operation Operation not matched to occupancy Controls Inappropriate controls, not being used correctly, complex, poor labelling, incorrect settings and set points BMS Complexity, issues around functionality, commissioning, communication and training

Pathways to change Day 2, Informing Changes What does the data tell us? Key Themes Commissioning (buildings and equipment) Inadequate, incomplete, key staff not involved, poorly timed, handover material not useful Sub-meters Lack of an understood metering strategy, reconciliation not carried out, issues of functionality, sub meters not installed

Pathways to change Day 2, Informing Changes What does the data tell us? Key Themes Windows Lack of understanding of ventilation strategy, actuator control / opening issues Lighting Excessive levels and inability to control Plant and equipment (generally) Efficiency (technology), condition, size, age

Pathways to change Day 2, Informing Changes What does the data tell us? Key Themes Fabric performance (from thermographic and air pressure testing) Construction quality around junctions, specification detailing, integrity of air barriers Renewables & ‘Innovative Systems’ Issues around design, installation, integration with other systems, operation and maintenance, complexity and control

Pathways to change Day 2, Informing Changes What does the data tell us There are opportunities to improve performance (to narrow the gap) In general these fall under the following areas. Design – is energy efficiency embedded in processes for new build and retrofit? Operations – can we improve the ongoing management and maintenance of building, plant and equipment? Occupant behaviour – are building occupants engaged in energy efficient operations? Procurement – are we buying energy efficient equipment? Maintenance – is energy efficiency embedded into maintenance contracts and practices?

Pathways to change Day 2, Informing Changes What needs to change and who needs to know?

Pathways to change Day 2, Informing Changes Off-site maintenance Facilities Management Building occupants Services Contractors Building Contractors Building owners Procurement teams Design teams BMS and controls suppliers Others – Catering, cleaning, security Procurement methods Performance standards Specifications – fabric, plant, controls, metering Design standards Design targets Build quality, fabric performance Commissioning Selection of materials, plant, controls Installation of plant and controls Hours of use of building and services Building changes of use Operation of building and services Performance efficiency of plant Control schedules set points StakeholdersIntervention and influence areas Maintenance of fabric & plant Occupant behaviours

Pathways to change Day 2, Informing Changes Audiences (Roles and responsibilities): simplified Client/owner e.g. Developer Landlord Lend Lease Owner/ occupier cd Design team e.g. Architect Struct. Eng Serv. Eng QS b Build team incl. Main Cont. Civils Electricians HVAC Eng QS o Occupants Incl. Full time Part time Transient Visitors f Facilities e.g. On-site FM Off-site FM Caretaker Security

Pathways to change Day 2, Informing Changes StageInput (typically) by Acquisition Planning Design Tender Value Engineering Construction Commissioning Handover Operation and Management Building Performance EvaluationNot routinely performed Roles and responsibilities: simplified Full block: Main parties; Half block:Parties with significant input Client/ownerDesign team: Architect Services Eng Structural Eng Contractor team: Civils Electricians HVAC OccupantsFacilities and/or independent evaluation

Pathways to change Day 2, Informing Changes Design Tender Value Engineering Construction Commissioning Handover Operation and Management Uncontrolled ventilation losses Occupant dissatisfaction Uncontrolled ventilation losses Occupant dissatisfaction VE Window type selection, narrowed actuator options Occupants try to manually open the windows and break handles Motorised fan lights selected Lack of understanding of use on site Technology unproven in schools Windows become stuck open Actuator falling between architects and M&E Actuators and window units incompatible Actuators and window units incompatible Design team unfamiliar with technology Relatively complex system - inappropriate No information for occupants Actuator – unlabelled switch on the wall Form of contract and specification not tight enough - requirement to find an actuator (as part of a package) Actuator function problems

Pathways to change Day 2, Informing Changes Exercise 1

Pathways to change Day 2, Informing Changes Exercise 1 (20 minutes) Discuss in pairs (10 minutes), share responses (10 minutes) 1.What do you think are the top 3 key interventions needed in your building (planned or existing building) to improve energy performance? 2.What are the roots of the issue (opportunity)? 3.Who are the key people who can make this intervention a success? Key intervention area What are the roots of this issue or opportunity? Who controls the success or failure? Who Controls this stuff?

Pathways to change Day 2, Informing Changes Making it happen

Pathways to change Day 2, Informing Changes Making it happen – Highlighting actual performance Key target audienceWhat’s needed, to make it happen FM team Need to understand the performance gap, size and shape, the opportunities (costs and benefits) to reduce it Senior support for action, an agreed plan Engagement and co-operation of other stakeholders Design team Need to understand the actual performance of real buildings, to help reduce and refine assumptions and improve the design process Occupants Understand the case for action (with Senior support) Need clarity on what their role is in improving performance, what they need to do, how they can do it and ideally feedback on progress. Clients Need to see the (business) case for action, existing and new build Need to factor learning into future targets for new build and retrofit To support action to change, an agreed plan dfoc

Pathways to change Day 2, Informing Changes Making it happen – hours of operation Key target audienceWhat’s needed, to make it happen FM team A building occupancy profile (area, day of week, time of day) - regularly reviewed with occupants Compare and optimise plant operation schedules. Regular communication with building users (Room booking systems – linked to control settings?) Design team Schedule of actual building occupancy and hours of operation to feed into design models (assumptions) Occupants Need information about the hours of operation of key plant. System to notify FM of requirements to change (May need additional ‘extension’ controls) dfo

Pathways to change Day 2, Informing Changes Making it happen – hours of operation Include area specific occupancy details List main equipment and record times of operation Compare and adjust in line with occupation

Pathways to change Day 2, Informing Changes Re-commissioning of store set points and operating hours to match occupancy (saved 7-11%)

Pathways to change Day 2, Informing Changes Making it happen - controls Key target audienceWhat’s needed, to make it happen Occupants Clear, simple, intuitive controls Clear instructions and signage Training and demonstration Simple building user guide Need automatic controls to operate unobtrusively Design team Feedback on whether the control strategy is working Details of the key requirements which must be specified moving forwards e.g. specific equipment FM team Carry out a controls audit to determine and map who controls which energy uses and the size of the uses. Review ‘usability’ of the controls for different users, develop appropriate information to improve. odf

Pathways to change Day 2, Informing Changes

Pathways to change Day 2, Informing Changes Making it happen – BMS Key target audienceWhat’s needed, to make it happen Design team Full specification of requirements in terms of technology and management of install, commissioning and handover. Build team Need to appoint an individual responsible for co- ordinating the different sub-contractors working on the BMS at an early stage. FM team Need a full BMS demonstration and (timely) training, identify storage capacity of BMS and establish a procedure e.g. data storage off-site. Need to understand the control strategy. Consider re-commissioning of BMS, to optimise. Check meter calibration and data quality Occupants Clear information about what they do / don’t control dfob

Pathways to change Day 2, Informing Changes 201 Bishopsgate Using BMS and sub metering, contractors found issues leading to a reduction of 20% of the building electricity consumption

Pathways to change Day 2, Informing Changes Making it happen – Commissioning and handover Key target audienceWhat’s needed, to make it happen Design team Procedures built into contract specification Specify the appointment of an independent commissioning engineer FM team Input to design / specification Involvement in commissioning and handover Regular e.g. seasonal commissioning e.g. heating, lighting to maintain optimal performance Build team Commissioning integrated into the building process Planned and timely commissioning and handover Occupants Builder Users Guides – based upon occupants needs, including understanding how the building and systems work dfob

Pathways to change Day 2, Informing Changes Making it happen – hours of operation John Lewis Partnership Re-commissioning of HVAC and controls (~10% savings)

Pathways to change Day 2, Informing Changes Making it happen – Sub metering Key target audienceWhat’s needed, to make it happen Design team Metering and monitoring strategy describing what is being metered and energy breakdown at the outset Metering system commissioning and handover responsibilities defined Need feedback on the ‘actual’ sub metered performance of plant and building areas, to refine design assumptions FM team Need a process to gather and check sub metered data Need to check meter calibration and data quality Need to carry out a metering reconciliation Build team Need to understand the costs associated with setting up complex metering systems Occupants Need accurate, quantified feedback on performance e.g. sub metered impact of behaviour dfob

Pathways to change Day 2, Informing Changes Building Energy Metering CIBSE TM39 Making it happen – Sub metering What’s in it?

Pathways to change Day 2, Informing Changes Making it happen – Fabric performance Key target audienceWhat they need to make it happen Design team Need to provide detailed specifications particularly around joints Need to mark the air barrier on all drawings Feedback on fabric performance testing results Air tightness testing target written into main contract Build team Need to be clearly aware of the air barrier and processes to check the barrier at each build step Appoint an air tightness champion on site FM team For existing buildings with fabric or space heating (underfloor) problems, consider thermography. For retrofit,testing can be used before and after Occupants Need the opportunity to feedback comfort issues dfob

Pathways to change Day 2, Informing Changes Making it happen – Fabric performance

Pathways to change Day 2, Informing Changes Making it happen – Renewables & Innovative Systems Key target audienceWhat’s needed, to make it happen Design team Need to specify tried-and-tested systems, installed by individuals who have done a good job before Design needs to be kept simple, challenge complexity Need to understand the full costs and practicalities, how complex solutions will be controlled, operated and maintained. Strategy in place for correct set-up of controls and metering Build in a long period of commissioning, include specialists Clear responsibility and Building User Guides FM team Needs training and guidance in the services / integration, controls, operation, metering and maintenance Need to check metering of renewable systems (installed / correctly, functioning) Occupants Need training and guidance to communicate the aspirations of the building and how to effectively interact with it. dfo

Pathways to change Day 2, Informing Changes Retain specialist suppliers in the commissioning and integration Biomass - Design and operation issues Flue height Hopper size Noise Ignition system Boiler bricks First year 30%

Pathways to change Day 2, Informing Changes Exercise 2

Pathways to change Day 2, Informing Changes Exercise 2 (20 minutes) Discuss in pairs (10 minutes), respond (10 minutes) Using the top 3 interventions needed in your building to improve performance and the key people who can make them happen, what do these people need, in order to deliver the intervention and embed change? Key intervention areaWho controls the success / failure What’s needed, to make it happen From Exercise 1 What do they need, to make it happen?

Pathways to change Day 2, Informing Changes Discussion