Time Meeting 1/13/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.

Slides:



Advertisements
Similar presentations
Run8 – Coming sooner than we had thought Mike Leitch Run8 Coordinator November 7 th /7/20071MJL.
Advertisements

MuTRG for Run12 RIKEN/RBRC Itaru Nakagawa 1. Run12 Schedule 14 Cryoweeks -> Mid Jan. ~ End of April GeV pp (2+3 weeks) GeV pp (1+6 weeks)?
MICO 8 th February 2010 Terry Hart (MOM) - Decay Solenoid and Target - MICE Machine Physics runs - Problems and Issues.
Time Meeting 1/20/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX Run-14 Status January 28, 2014 Klaus Dehmelt 1Klaus Dehmelt - Jan 28, 2014 RHIC Time meeting.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
PHENIX Run12 Spin John Koster RBRC RSC Meeting 2012/05/11.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
Jon S Kapustinsky 11/17/2010 Jon S Kapustinsky FVTX Commissioning Plan 1.71 Jon S Kapustinsky 1.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Columbia University IN THE CITY OF NEW YORK Environmental Monitoring DOE Review June 2-3, 2009.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
Status of W analysis in PHENIX Central Arm Kensuke Okada (RBRC) For the PHENIX collaboration RHIC Spin Collaboration meeting November 21, /21/20091K.Okada.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
Time Meeting 2/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Mar 13.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
Takao Sakaguchi, BNL Run-11 PHENIX Run Coordinator PHENIX Run-11 Report Sakaguchi, RHIC retreat 1 RHIC retreat version.
FVTX Trigger Toru Nagashima, Yomei Fukushima (Rikkyo University) Shoichi Hasegwa (J-Parc) Itaru Nakagawa RIKEN and FVTX Group 1.
PHENIX Run-13 status Hubert van Hecke for the PHENIX collaboration 1Hubert van Hecke - 05 Feb 13.
Swadhin Taneja Stony Brook University On behalf of Vertex detector team at PHENIX Collaboration 112/2/2015S. Taneja -- DNP Conference, Santa Fe Nov 1-6.
Time Meeting 3/17/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
Time Meeting 3/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Experimenters MeetingDmitri Denisov Week of July 7 to July 15 Summary  Delivered luminosity and operating efficiency u Delivered: 1.4pb -1 u Recorded:
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
1 RHIC Machine/Detector Planning Meeting 29 Jan 08 Agenda –Run 8 end game issues, if any Planning Meeting Web Site:
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
Forward Vertex Detector Cost, Schedule, and Management Plan Participating Institutions Organizational plan Cost Basis R&D Costs Cost Schedule.
PM Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Columbia University IN THE CITY OF NEW YORK FVTX Electronics Oversight and Integration Eric J. Mannel Columbia University.
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
Recap Clamp Installation RIKEN/RBRC Itaru Nakagawa 1.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Time Meeting PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
Study of polarized sea quark distributions in polarized pp collisions at sqrt(s)=500GeV with PHENIX Oct. 10, 2008 Tsutomu Mibe (KEK) for the PHENIX collaboration.
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
PHENIX Plan for Run13 Kieran Boyle RSC 01/11/20131.
BUP Discussion Input John Koster, Sasha Bazilevsky, Itaru Nakagawa Spin PWG 2013/04/03 1.
Muon Tracking is still in the process of organizing our specialist & assistant shifts. Our strategy can be summarized as follows: A specialist should be.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Pixel Status Mar 12nd 2012 Maki KUROSAWA RBRC.
Maki KUROSAWA VTX Group 2014 Feb 20
Run16 Y. Akiba.
Presentation transcript:

Time Meeting 1/13/2015 PHENIX Run-15 Preparations Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico

Time Meeting 1/13/2015 Run-15 BUP (revised) 200 GeV with transverse polarization for 9 weeks [Physics driven goal is 50 pb −1 recorded within |z| = 60%] 200 GeV with transverse polarization of the proton for 5 weeks [Physics driven goal is 190 nb −1 sampled within |z| = 60%. We note that the request is with half the data switching the beams to Au+p.] 200 GeV with transverse polarization of the proton for 2 weeks [Physics driven goal is 450 nb −1 sampled within |z| = 60%] 12/10/2014Douglas Fields 2

Time Meeting 1/13/2015 Of concern in Run-15 MPC-EX North and South commissioning. FVTX/VTX re-commissioning. 12/10/2014Douglas Fields 3

Time Meeting 1/13/2015 Status of Preparations PHENIX is pushing hard to be ready for Run 15 start on January 27, MPC-EX North and South installed. FVTX/VTX installed. Sheeting has begun. Complete this week. Cooling system checks under way. Commissioning is starting. 12/10/2014Douglas Fields 4

Time Meeting 1/13/2015 FVTX/VTX Status 12/10/2014Douglas Fields 5 Detector fully installed, cabled, insulated and closed up. Cooling system functioning at 18 o C. Dry Nitrogen flowing. Have addressed condensation issues. Groups are now bringing detector back to operational.

Time Meeting 1/13/2015 MPC-EX Status 12/10/2014Douglas Fields 6 LV Distribution Boards Both North and South MPC-EX detectors installed and cabled. Read real signals from silicon sensors at bias through stand-alone readout. Working to incorporate into PHENIX DAQ. Have successfully passed data from a FEM we had set up in the counting house. Have successfully cycled data from an FEM in the hall making a number of raw data files with several thousand events in each. The data files were checked with ddump by hand and by a macro that double-checked the parity words. All looked fine. Working on multi-event buffering. Important to control beam loss

Time Meeting 1/13/2015 Spin Tasks PHENIX Spin coordinator – Itaru Nakagawa 12/10/2014Douglas Fields 7 TaskRun 11Run12Run13Run15 Local polCiprian, Sanghwa Josh/Sanghwa/ Cip Minjung Kim (SNU) Junsang (SNU) Minjung* Spin monitor/Oncal/CDEV Sookhyun, Andrew, Paul, Kieran Hide (Tokyo), John Koster Mike Beaumier (UCR) SeYoung, Mike*,Xiaodong Fast production (muons + electrons) Martin (UIUC), Yoshimitsu (RIKEN) Mike Beaumier (Muon) Darshana Perera(NMSU), Nils Feege(SBU) Nils Feege, Stacy Karthas(SBU), Darshana? EMCal Calibration (contact:Jeff Mitchell) Andrew (SUNY) Ciprian (SUNY)Jeff Relative Luminosity Andrew (SUNY), Kieran (RBRC) Hari (GSU), Inseok(SNU) Haiwan, Kieran* Vernier ScansDave Kawall, Paul Kline, Oleg, Kensuke Mike Beaumier (UCR) Sadeera (Umass) Katherine DeBlasio, Gregory Otino (UNM) ERTKensukeKensuke, Chin- Hao Chen Chin-Hao Chen, Inseok, Kieran Inseok, Sadeera, Minjung, Yorito, Zhongling (SBU)

Time Meeting 1/13/2015 Shift Status Currently we are pretty well covered beginning with watch shifts on Jan. 13 through end of March. Have a few vacancies left in the shift schedule through end of March. Have commitments for period coordinators through mid-May. Are filling Subsystem Experts shifts. 12/10/2014Douglas Fields 8

Time Meeting 1/13/2015 Period Coordinators 12/10/2014Douglas Fields 9 DatesNameComments 01/13/2015 – 01/20/2015John HaggertySheeting 01/20/2015 – 02/03/2015Sarah CampbellBeginning of run, MPC-EX 02/03/2015 – 02/17/2015Darren McGlinchey 02/17/2015 – 03/03/2015Klaus DehmeltRC on travel 2/26 – 3/3 03/03/2015 – 03/17/2015Norbert Novitzky 03/17/2015 – 03/31/2015Jin Huang 03/31/2015 – 04/14/2015Eric Mannel 04/14/2015 – 04/28/2015Nicole Apadula (tent)Change to p + Au 04/28/2015 – 05/12/2015Hubert van HeckeRC on travel end of April 05/12/2015 – 05/26/ /26/2015 – 06/09/2015Change to p + Al 06/09/2015 – 06/23/2015

Time Meeting 1/13/2015 Backup 12/10/2014Douglas Fields 10

Time Meeting 1/13/2015 CAD Schedule 12/10/2014Douglas Fields 11

Time Meeting 1/13/2015 FVTX/VTX Status 12/10/2014Douglas Fields 12 Detector fully installed, cabled, insulated and closed up Cooling system and functioning during the daytime (Mon-Fri) at 18C Dry Nitrogen flowing A few leaks in one (north?) manifold that need to be addressed before start of run FVTX LV bulk supply voltages lowered to reduce overheating of LDOs. Nothing has been done with the VTX bulk supplies. Flow interlocks are operational but not fully tested Thermal interlocks are partially operational. The PLC is on and configured and should alarm if there is an over temperature condition and trip LV/Bias, however it has not been tested. There is currently an issue with the OPC server/client interfaces as a result of system upgrades to Windows7. John H is working on this and we have a fall back plan to use a windowsXP system if necessary. We will have to address some security concerns, but there is a plan for that. LV control is still experiencing some issues. Steve B. is looking at it and will continue to work on it first thing next week. The focus will be on the FVTX, followed by the VTX Pixel and StriPixel systems. No recent work has been done to check out the Bias systems, however, there was basic functionality of all 3 crates in November (e.g ping them, query status).

Time Meeting 1/13/2015 On-line Monitoring 12/10/2014Douglas Fields 13

Time Meeting 1/13/2015 Subsystem Experts 12/10/2014Douglas Fields 14

Time Meeting 1/13/2015 Proposal for change in Shift Change Meeting Standing BlueJeans meeting. – Allows remote connections to see what we are showing. – Down side is perhaps encourages remote connections? I would like to have 1+ page presentations by each subsystem once/week to demonstrate subsystem performance. – Could just be plots from online monitoring. 12/10/2014Douglas Fields 15

Time Meeting 1/13/2015 Shift Status 12/10/2014Douglas Fields 16

Time Meeting 1/13/2015 Run-15 Web Page Current Run-15 page is now available, but mostly just copied from Run-14. Many links broken. I will begin to update and correct links. 12/10/2014Douglas Fields 17