CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

Construction Engineering 221
1.1Definition of Construction:. Is the process by which material, equipment, machinery are assembled into a permanent facility. Is the process by which.
Organization of Primary Entities
JOB ORDER CONTRACTING Contract Management Department 8/28/121.
Construction Management. Players Owner – owns project upon completion of construction –Private – owner owns land and pays for construction of facility.
Lessons Learned: CM at Risk & Design Build
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Building Success Stories: A Survey of Construction Delivery Methods PRESENTED BY: BLAKE G. POWELL.
Chapter 14 Pricing General Expenses. Objectives Upon completion of this chapter, you will be able to: –Define general expenses –Use a checklist to identify.
4/13/2017 1:54 PM.
John Boon ZUT November Procurement Systems The organisation of the interaction between the purchaser of a new building and the suppliers of goods.
1. A project delivery method describes the process of how a project will be designed and constructed. A project delivery method can be characterized in.
Your Deliver Method... …Pick it Early
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
The Risks and Rewards of Contractor Bids and Proposals.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Project Startup Hmwk Due 10/11/ # 1,3,7,8 8.9 #1 9.7 #1,3,4,5, #1,2,3,4,10.
Introduction -Discussed preparation of the overall plan for the project - as well as its implementation. -The control system quantitatively measures actual.
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
ESTIMATING By Laith Jacob.
PROCEDURES FOR SELECTING THE CONTRACTOR
Construction What is “construction” defined as or include?  Building?  Altering ?  Repairing?  Demolishing?  Public Improvements?
APPLICATION OF CONTROLS CHAPTER 8 Presenting by : Mustafa Al tayeb Date 21/11/2005.
Prof Awad S. Hanna C HANGING P ROJECT D ELIVERY S YSTEMS by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison Department of Civil and Environmental.
Prof. Awad S. Hanna S TEPS IN THE D EVELOPMENT OF A D ETAILED E STIMATE.
Job Order Contracting A Washington State Procurement Option
HOW TO WRITE A BUDGET…. The Importance of Your Budget Preparation of the budget is an important part of the proposal preparation process. Pre-Award and.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
PM/CAM Training H. Jeff Moore May 11, AGENDA Overview CM at Risk Design (Completion) / Build Lunch Break / Discussion – 11:30 AM – 12:30 PM CM Agency.
Construction Contracts and Project Delivery Methods
CON 2001 & CVE 4070 Construction Methods & Engineering L-3 Construction Contracts & Controls Prof. Ralph V. Locurcio, PE.
Is Your JOC Program Audit Worthy? z Scott Creekmore.
Measurement and Payment. Construction Progress Payments –Contractor gives a bill for progress to RPR Outlines what bill is for Give details as needed.
TYPES OF CONTRACTS.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Project Delivery Methods Part I. What is A Project Delivery Method? The owner’s selection of the organizational structure of the project. Three popular.
FACULTY OF ENGINEERING DEPARTMENT OF CIVIL ENGINEERING SPRING SEMESTER ASSOC.PROF.DR. İBRAHİM YİTMEN CIVL 493 CONSTRUCTION MANAGEMENT.
Project Delivery Methods CM CONSTRUCTION DOCUMENTS Kevin A. Delorey 11 Feb 2010.
Chapter 13 Estimates for Remodeling Work
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Measurement and Payment
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Collaboration of Entitlement and Cost Efforts in Claims Analysis Rubino & McGeehin Consulting Group June 27, 2005.
Not for Distribution Outside of MBP1 April 11, 2012.
Construction Management At Risk Process
Agenda – JOC Gordian Construction Task Catalog Understanding the Construction Task Catalog ® (CTC) Calculating the Bid Contractor Adjustment Factors Risk.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 2 Construction Contracts.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
HORTICULTURE II - LANDSCAPE Unit B Landscape Design.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
CHANGING PROJECT DELIVERY SYSTEMS
by Awad S. Hanna, Ph. D., P. E. The University of Wisconsin, Madison
2016 SAME Small Business Conference - Atlanta
(Additional materials)
STEPS IN THE DEVELOPMENT OF A DETAILED ESTIMATE
CHANGING PROJECT DELIVERY SYSTEMS
Project Delivery Systems
PROJECT DELIVERY METHODS
ARCH 435 PROJECT MANAGEMENT
Construction Contracts
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
Presentation transcript:

Facilities Institute July , 2012 Houston, Texas

Facilities Institute July , 2012 Houston, Texas A Primer on Standard Costing Methods for Construction Projects Presented by Tom Vaughn, CEO

Facilities Institute July , 2012 Houston, Texas Agenda Defining Terms Construction Cost Components Four Common Contract Types ‒ Definition/What’s Included ‒ Delivery Methods Associated with Each ‒ Pros/Cons ‒ Best/Least suited projects Market Forecasting

Facilities Institute July , 2012 Houston, Texas Defining Terms Management Options Delivery Methods Selection Criteria Contract Types

Facilities Institute July , 2012 Houston, Texas Defining Terms Delivery Methods 1.Traditional (Design-Bid-Build) 2.Competitive Sealed Proposal (CSP) 3.Construction Manager at Risk (CM at R) 4.Design/Build 5.Job Order Contract (JOC) Selection Criteria 1.Low bid 2.Best value 3.Qualification based Contract Types 1.Lump Sum 2.Cost + Fee 3.Cost + Fee with GMP 4.JOC (unit price) Price Only Qualifications Only

Facilities Institute July , 2012 Houston, Texas Construction Cost Components Four Basic Components ‒ Preconstruction Phase Fee ‒ Construction Fee ‒ General Conditions ‒ Contingency Type of Contract dictates which of these components are included

Facilities Institute July , 2012 Houston, Texas Preconstruction Phase Fee Preliminary Budget & Schedule Constructability Reviews Ongoing Scheduling – Design & Construction Ongoing Budget/Cost Consultation Coordination of Construction Documents Bid Package Strategy Obtaining Bids Compensation: Lump Sum/Cost Plus or GMP

Facilities Institute July , 2012 Houston, Texas Profit Home Office Overhead ‒ Estimating ‒ Accounting ‒ Human Resources ‒ Legal ‒ Corporate Safety ‒ Executives ‒ Interest Cost ‒ Income Tax Construction Fee

Facilities Institute July , 2012 Houston, Texas General Conditions (Everyone’s Definition is Different) On-Site Project Management Bonds & Insurance Field Offices & Office Supplies Temporary Project Utilities Safety Coordinator/ Assistant Project Executive Office Engineer(s) Project Expeditor(s) Asst. Superintendent(s) CPM Scheduler Superintendent(s) Project Manager(s) Project Support Staff Out-of-State Project Specific Travel Builder’s Risk Insurance General Liability Insurance (unless ROCIP) Payment & Performance Bonds Other Project Insurance as required Partnering Costs Job Photos/Videos Project Specific Signage Postage/Special Shipping Project/As-Built Drawings Project Milestone Events Move-In/Out, Office Set-up Employee ID Systems Small Tools, Storage Trailers Monthly Trailer Rental Mobilization/Demobilization First Aid Supplies Reprographic Services Monthly Office Supplies Remote Parking Expense Project Reference Manuals Security Systems/Watchman Safety Material & Equipment Dumpsters Project Electricity Monthly Phone/ Internet Phone/Internet Install. Street Rental & Barricades Fencing Covered Walkways Temp. Water Distrib. & Meters Temp Electrical Distrib. & Meters Site Erosion Control & Project Entrances Project Water Temp Toilets Temp Fire Protection

Facilities Institute July , 2012 Houston, Texas Contractor’s Contingency Bidding Cost Escalation Ooops Scope Unforseen Conditions Design Owner

Facilities Institute July , 2012 Houston, Texas Lump Sum Contract Contract TypeSelection CriteriaDelivery Method (s) Lump Sum (Fixed price, Stipulated sum) 100% on Total Construction Cost Traditional (Hard Bid) 0-100% on Total Construction Cost & Other Factors Competitive Sealed Proposal (CSP) Qualifications & Cost Design/Build, Construction Manager at Risk Definition – Build X project for Y dollars. Bid is based on Contractor’s interpretation of the major items of work and quantity/scope of each item. Contractor paid only the lump sum dollar amount.

Facilities Institute July , 2012 Houston, Texas Facilities Institute July , 2012 Houston, Texas Lump Sum Contract What is Included? Preconstruction Phase FeeNO* Construction Fee Home office overhead Profit YES General ConditionsYES ContingencyNO* *Only what’s clearly on the plans & specs

Facilities Institute July , 2012 Houston, Texas Lump Sum Contract Traditional (Design-Bid-Build) ‒ Owner selects the Architect/Engineer to design the project. ‒ Once Construction Documents (CDs) are fully complete, the Owner requests lump sum prices from general contractors to perform the work. ‒ Selection of the General Contractor is based on the lowest price submittal and award is made to a single contractor. Characteristics ‒ Delivery is in three linear phases resulting in the longest time duration. Owner General Contractor A/E S u b c o n t r a c t o r s DesignBidConstruct

Facilities Institute July , 2012 Houston, Texas Lump Sum Contract Competitive Sealed Proposal ‒ Similar to Traditional, the Owner selects an A/E to design the project. ‒ Once CDs are completed, the Owner solicits proposals from contractors to perform the work. ‒ Selection is based on a combination of price and other factors that the Owner deems in its best interest, such as project team personnel, schedule, contractor’s past experience, etc. ‒ Doesn’t always result in lowest price. Delivery Schedule is in three linear phases: Owner General Contractor A/E S u b c o n t r a c t o r s DesignBidConstruct

Facilities Institute July , 2012 Houston, Texas Facilities Institute July , 2012 Houston, Texas Lump Sum Contract Possible Selection Criteria Price Safety Record Quality Control Program Past Similar Projects References Management Team Sub Contractors Financial Strength (bonds) Value Added Services

Facilities Institute July , 2012 Houston, Texas PROS Easy – no cost accounting or confusion Open, aggressive bidding Single point of responsibility for construction CONS No design phase assistance Longer project duration Lack of flexibility Price not known until done Adversarial relationships Lump Sum Contract BEST SUITEDLEAST SUITED Smaller projects Simple projects Completely designed New projects Multi-phase or complex jobs Time sensitive

Facilities Institute July , 2012 Houston, Texas Cost Plus Fee/GMP Contracts Contract TypeSelection Criteria Delivery Method Cost Plus Fee or Cost Plus Fee with GMP (Guaranteed Maximum Price) Qualifications & Cost Design/Build* Qualifications & Cost Construction Manager at Risk* (CMR) Cost Plus Fee – Contractor is reimbursed for actual cost of labor and materials, plus charges a fee (typically an agreed-upon lump or % of total labor & material costs) for home office overhead & profit. Guaranteed Maximum Price (GMP) – The CMR or Design/Builder agrees beforehand that the cost of the work will not exceed a specific figure, known as the GMP. The CM is allocated some contingency to pay for construction changes within the design intent. Changes beyond design intent require approval of all stakeholders. *Can also be lump sum.

Facilities Institute July , 2012 Houston, Texas Facilities Institute July , 2012 Houston, Texas Cost Plus Fee/GMP Contracts What is Included? Preconstruction Phase FeeYES Construction Fee Home office overhead Profit YES General ConditionsYES ContingencyYES

Facilities Institute July , 2012 Houston, Texas Used with CM at Risk o Owner selects A/E separate from CM. o CM is selected based on fees, general conditions costs and qualifications. o CM provides preconstruction phase services and works in a cooperative relationship with A/E. o CM guarantees construction price at some point during design. o Pricing/costs are open book. Cost Plus Fee/GMP Contracts Delivery Schedule is three phase non-linear: Construct DesignSelect Owner A/E CM Agent Sub

Facilities Institute July , 2012 Houston, Texas PROS Builder Selection Flexibility CM provides preconstruction services and works in team concept with A/E & Owner Opportunity phase/fast track job Team concept Better opportunity to maximize MWBE subcontractor participation through bid package initiatives Change flexibility CONS Price is not guaranteed at time of selection Owner must have more involvement in the process Selection is more difficult Cost Plus Fee: CM at Risk BEST SUITED LEAST SUITED Larger new or renovation projects that are schedule sensitive, difficult to define, or subject to change Smaller projects

Facilities Institute July , 2012 Houston, Texas Example Cost Plus Fee (CM at Risk) Project Emerging Technology Center, Texas A&M University

Facilities Institute July , 2012 Houston, Texas Example Cost Plus Fee (CM at Risk) Project Emerging Technology Center, Texas A&M University

Facilities Institute July , 2012 Houston, Texas Why it Worked Well at Texas A&M University Complex Project High End Design Fixed Budget Early Packages ‒ Utility Re-Route ‒ Earth Work

Facilities Institute July , 2012 Houston, Texas Cost Plus Fee/GMP Contracts Design/Build Delivery Method ‒ Design and Construction are accomplished through a single entity. The Design/Build entity includes a builder, architect and engineer. ‒ Selection is based on best value determination. ‒ Pricing at selection may be fee and general conditions based or lump sum. Sub Owner Self-Perform Design/Builder Delivery Schedule is two non-linear phases: Design ConstructSelect Sub

Facilities Institute July , 2012 Houston, Texas PROS Speed Selection flexibility Single point of responsibility Team concept CONS Speed No check and balance between A/E and Contractor More difficult for Owners to manage Potential adversarial relation-ship between Design/Builder and Owner (if lump sum) Cost Plus Fee: Design/Build BEST SUITEDLEAST SUITED Projects that are schedule sensitive Projects that are difficult to define Projects that are less schedule sensitive

Facilities Institute July , 2012 Houston, Texas Example Cost Plus Fee (Design/Build) Project MD Anderson Cancer Center Mid Campus Building 1 and Parking Garage

Facilities Institute July , 2012 Houston, Texas Example Cost Plus Fee (Design/Build) Project MD Anderson Cancer Center, Mid Campus Building 1

Facilities Institute July , 2012 Houston, Texas Why it Worked at MD Anderson Cancer Center Accelerated Schedule Known and Trusted Builder and A/E Team Known Owners Expectations o Not just what was in writing Proactive, Daily Owner Involvement

Facilities Institute July , 2012 Houston, Texas YES Estimate errors Market fluctuations Normal weather delays Construction mistakes Quantity errors Subcontractor performance NO Design changes Added scope Design errors Unforeseen conditions Natural or man-made disasters What is GUARANTEED about a GMP? “A Guaranteed Maximum Price on a particular scope of work”

Facilities Institute July , 2012 Houston, Texas Unit Price Contract Contract TypeSelection CriteriaDelivery Method Unit Price Qualifications & Cost Job Order Contract (JOC) Predetermined price for major items of work. The Contractor’s price per unit multiplied by the total quantity to create the total cost for each major item of work. Based on the Contractor’s interpretation of the major items of work and the quantity of each item. Contractor is paid based on the actual quantity constructed of each major item of work.

Facilities Institute July , 2012 Houston, Texas Facilities Institute July , 2012 Houston, Texas Unit Price Contract What is Included? Preconstruction Phase FeeNO* Construction Fee Home atlive overhead Profit YES General ConditionsYES ContingencyNO* *Only what’s clearly on the plans & specs

Facilities Institute July , 2012 Houston, Texas Unit Price Contract Job Order Contracts ‒ A process for contracting for the minor construction, repair, rehabilitation, or alteration of facilities when the work is of a recurring nature but the delivery times, type, and quantities of work required are indefinite. ‒ Orders are priced based substantially upon pre described and pre-priced tasks contained in an Owner’s specified Unit Price Book. ‒ The prime contractor bids a “coefficient” or multiplier which is applied to these unit prices to determine the actual rates. ‒ Selection is based upon the combination of experience, qualifications, past performance, technical ability, financial stability, reputation, and price which provides the overall “best value.” Owner JOC Contractor A/E or Consultant S u b c o n t r a c t o r s o r E m p l o y e e C r e w s

Facilities Institute July , 2012 Houston, Texas PROS Flexible Fast CONS Difficult to manage Difficult to compare proposals Unit Price Contract BEST SUITEDLEAST SUITED Small projects Repeat work Schedule sensitive Large projects Poorly defined scope

Facilities Institute July , 2012 Houston, Texas SUMMARY: Comparison of Different Contract Types Contract TypeSelection CriteriaCost ComponentsDelivery Method (s) Lump Sum 100% on Total Construction Cost Construction Fee General Conditions Traditional (Design-Bid-Build) Lump Sum % on Total Construction Cost & Other Factors Construction Fee General Conditions Competitive Sealed Proposal (CSP) Lump Sum Qualifications & Cost Preconstruction Fee Construction Fee General Conditions Contingency Design/Build, CM at Risk Cost Plus Fee Qualifications & Cost Preconstruction Fee Construction Fee General Conditions Contingency Design/Build, CM at Risk Cost Plus Fee with GMP Qualifications & Cost Preconstruction Fee Construction Fee General Conditions Contingency Design/Build, CM at Risk Unit Price Qualifications & Cost Construction Fee General Conditions Job Order Contract

Facilities Institute July , 2012 Houston, Texas Market Factors: What Contractors Consider Perceived Risk Perceived Quality of Owner & A/E o Quality of plans o Paid on time o Prompt resolution of changes Difficulty/Complexity of the Project Time Retainage & Payment Terms Location – Availability of Manpower & Materials Cost of Materials & Labor

Facilities Institute July , 2012 Houston, Texas Materials Costs* (Last 10 Years) Diesel 246% Asphalt 124% Iron Ore / Steel Scrap 164% Lumber 4-9% Copper Ore 309% Gypsum 28% CPI 24.5% vs. PPI for Construction 52.1% *Source: AGC, Bureau of Labor

Facilities Institute July , 2012 Houston, Texas Labor Costs Industry Facts The average craft worker is 47 The average entry age into the industry is 29 Craft training is at an all-time low Construction productivity was at an all-time low 20% of the workforce is expected to retire within 3 years Future building growth is projected to exceed anything seen in previous generations The Bottom Line While the construction workforce is aging and less productive due to lack of training, the demands on our industry increase and become more technical every year. We must do more to recruit, train and retain craft workers to meet the demands of our industry.

Facilities Institute July , 2012 Houston, Texas Pick the Right Contract Type & Delivery Method Before starting the selection process, determine which contract type and delivery method will provide “best value” Factors to consider: −Project size and complexity −Time allocated for the construction −Competitiveness of the current/local construction market −Desired flexibility −Availability of contractors and subcontractors in the local market After deciding on key factors, evaluate the various delivery methods and formally adopt the method you deem “best value.”

Facilities Institute July , 2012 Houston, Texas Resources / Credits Dorsey, Robert W., Project Delivery Systems for Building Construction, AGC of America, 1997 AGC National, Project Delivery Methods

Facilities Institute July , 2012 Houston, Texas Thank You Tom Vaughn