Road Pavements Forum Structural Design Working Group Revision of the South African Flexible Pavement Design Method 7 November 2006 Pretoria H L Theyse.

Slides:



Advertisements
Similar presentations
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
Advertisements

SOUTH AFRICAN NATIONAL ROADS AGENCY LTD Pavement Research
MEPDG Overview & National Perspective CRSI Expert Task Group Meeting July 29, 2008 Gary Crawford Federal Highway Administration Office of Pavement Technology.
From… Maintenance Technical Advisory Guide (MTAG) Chapter 1 Introduction.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
MethodAssess System Assessment. Methoda Computers Ltd 2 List of Subjects 1. Introduction 2. Actions and deliverables 3. Lessons and decisions.
Basic guidelines for the creation of a DW Create corporate sponsors and plan thoroughly Determine a scalable architectural framework for the DW Identify.
Cadle & Yeates Ch 5 Revised by Ivor Perry Sept Detailed Planning - 1.
Iterative development and The Unified process
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Bituminous Stabilized Materials Guideline RPF Feedback : K Jenkins May 2006.
Interim Guidelines: The Design and Use of Foamed Bitumen Treated Bases Fenella Long Road Pavements Forum November 2001.
IS&T Project Management: Project Management 101 June, 2006.
The Irish standard for Energy Management – IS393
Family Outreach and Response Program Strategic Plan September 26 th, 2012.
Revision of the South African Pavement Design Method Louw Kannemeyer.
Status Report on Standard Specifications and Codes of Practice Department of Transport RPF November 2004.
IT 499 Bachelor Capstone Week 9.
Web Development Process Description
AICT5 – eProject Project Planning for ICT. Process Centre receives Scenario Group Work Scenario on website in October Assessment Window Individual Work.
Kim Jenkins SANRAL Chair in Pavement Eng
AAPA 2011 Study Tour – Improving Pavement Performance #1 Improving Pavement Performance Part 1 V2.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 1 Diploma of Project Management Qualification Code BSB51507 Unit.
Project Overview, Objectives, Components and Targeted Outcomes
Testing Challenges in an Agile Environment Biraj Nakarja Sogeti UK 28 th October 2009.
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
RSA Design Guidelines for hot-mix asphalt TRH3/HMA Workshop June 2001.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Members of Finland Parliamentary Delegation Policy Approaches into Housing in South Africa Presentation by the Department of Human Settlements.
CSIR-UCB research programme Road Pavements Forum 14 November 2001.
The Global Fund - Proposal Process & Round 8 February 19, 2008.
WP1 Management. N° of work package: 1 Management Duration in months: 36+2 EGEC Description of the tasks: 1.1. Project Management (EGEC) Coordination in.
BSBPMG505A Manage Project Quality Manage Project Quality Project Quality Processes Diploma of Project Management Qualification Code BSB51507 Unit.
6 th Regional Statistics Seminar November 1 st, 2013 St. Kitts Marriott, Frigate Bay Beverly Harris 6 th Regional Statistics Seminar November 1 st, 2013.
INFSO-RI Enabling Grids for E-sciencE EGEE and Industry Bob Jones EGEE-II Project Director Final EGEE Review CERN, May 2006.
Preparation of a Strategic Pilot Program for Climate Resilience (PPCR) Project - Phase I (November January 2013) Climate Investment Funds (CIF) Grant.
PROGRESS OVERVIEW: COLTO STANDARD SPECIFICATIONS TMH AND TRH DOCUMENTS OTHER DOCUMENTS.
LEONARDO TRANSFER OF INNOVATION PROJECT “MEDIA TECH: The future of media industry using innovative technologies ” No. LLP-LdV-ToI-11-CY Kick-off.
The ToolBox Product Management & Product Development Framework Welcome to the Product Management & Product Development “Good Practice” workshop Facilitated.
AAPA 2011 Study Tour – Improving Pavement Performance #1 Improving Pavement Performance Part 1.
Apply Quality Management Techniques Project Quality Processes Certificate IV in Project Management Qualification Code BSB41507 Unit Code BSBPMG404A.
SUMMARY PROJECT OUTLINE (SPROUT) ITC-ILO/ACTRAV Training Course A : Trade Union Training on ILS & the ILO Declaration on Fundamental Principles &
Project management Topic 1 Project management principles.
EIGHTH ROAD PAVEMENTS FORUM Programme and Status of Resolutions.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
15 th ROAD PAVEMENTS FORUM Mpekweni Beach Resort 6-7 May 2008 Final Session: Resolutions.
Lecture 2 System Development Lifecycles. Building a house Definition phase Analysis phase Design phase Programming phase System Test phase Acceptance.
3 rd REVISION OF TRH12 Renaldo Lorio 12 th Meeting of RPF - 8 November 2006.
Pavement Research Advisory Committee (PRAC) 13 th Meeting of the RPF 8 May 2007.
12 March, 2002 LCG Applications Area - Introduction slide 1 LCG Applications Session LCG Launch Workshop March 12, 2002 John Harvey, CERN LHCb Computing.
CSIR Pavement Design Task Group Feedback RPF meeting 23 November 2005.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Practical Scheduling – PMICOS in Australia Presented by: Ed Blow (MTC Australasia Pty Ltd) 2 November 2005 PMI-College of Scheduling.
ROAD PAVEMENTS FORUM CSIR CONFERENCE CENTRE 7/8 August 2000 Final Session.
Steps in development of action plans ITC-ILO/ACTRAV Course A3 – Trade Union Training on Information Management for Trade Union Organization, Research.
Participatory Monitoring and Evaluation of Community Projects – A Model Pretoria, South Africa 30 November – 3 December 2009.
The System Development Life Cycle
Process 4 Hours.
WP1 INERTIA Framework Requirements, Specifications and Architecture
Understanding Standards An overview of course assessment
Project Integration Project integration management processes :
The System Development Life Cycle
MOSH Leading Practices Adoption System
Infra program Project outline Helsinki University of Technology
BioMedBridges – Work Packages 2 & 12
OO Design and Development
Infra program Project outline Jouko Kankainen
Portfolio, Programme and Project
AICT5 – eProject Project Planning for ICT
PORTFOLIO COMMITTEE ON SOCIAL DEVELOPMENT 13 MARCH 2019
Presentation transcript:

Road Pavements Forum Structural Design Working Group Revision of the South African Flexible Pavement Design Method 7 November 2006 Pretoria H L Theyse

Slide 2 © CSIR Research and Development (R&D) Framework Pavement Design Task Group Established May 2005 Series of meetings during July and August 2005 R&D framework submitted in November 2005 Characteristics of new pavement design method R&D topics Performance based information system Demand analysis (Traffic and environment) Material resilient response models Pavement resilient response models Damage models Probabilistic and recursive schemes Each R&D topic have a number of identified R&D needs Each R&D need is currently being translated into one or more project briefs to address those needs

Slide 3 © CSIR R&D Process Project funding and contracts Funding organisations will sponsor projects of interest to them Contract between service provider and project client Project management Each project will start with an inception phase Investigate available solutions Finalize project methodology Finalize cost and resource allocation Ongoing project review through existing structure of Road Pavements Research Advisory Committee (RPRAC) to ensure correct delivery on time

Slide 4 © CSIR R&D Process (continued) Overarching integration level project Integration of output from various ME-design related projects Integration of performance based information system with ME-design components in a single design method Delivery mechanisms Website for tracking progress on R&D process and sharing general information Any content (documents and software) developed as part of the project available for use on the project website Immediate, short, medium and long-term output User-manual with an overview of the method Detail technical documents on individual components Technical guidelines, test protocols and method specifications

Slide 5 © CSIR Project objectives Overall objective To develop a design method that is Accurate (agree with reality) Impartial in terms of pavement type selection Unbound (Crushed stone, natural gravel) Stabilised (Cement, Foamed-bitumen, Emulsified-bitumen) HMA Concrete (not included in flexible pavement design R&D process) Project structured according to immediate, short, medium and long-term objectives and deliverables Achievement of objectives subject to availability of resources

Slide 6 © CSIR Time-frame for R&D process Immediate12 to 18 months Short-term3 to 5 years Medium-term5 to 8 years Long-term8 to 12 years

Slide 7 © CSIR Revised design method Integration of two components Information system based on past performance Mechanistic-Empirical analysis and design system Performance based information system Starting point for design – coupled with ME-design using default input values for preliminary design and training Validation data set for reality checks and calibration ME-design component Provides opportunity for design refinement Project specific input combined with design expertise Utilisation of available road-building material

Slide 8 © CSIR Integration of past performance and M-E design components Design Method Young professional Seasoned professional Design specialist Design scenario: Routine and preliminary design Low risk Low design experience Known materials – default input Conventional material classification Design scenario: Important design Medium risk Seasoned professional designer Project specific input Design scenario: Very important design, high risk Special investigations Specialist designer Unusual materials Project specific input UserDesign application Performance based information system ME-design component

Slide 9 © CSIR Work in progress Performance based information system Modelling and Analysis Systems CC appointed to develop and populate the system ME-design component CSIR Built Environment appointed for inception phase Develop project briefs – 22 briefs Industry workshop – 15 November 2006 Project website linked to RPRAC website

Slide 10 © CSIR Temperature Moisture content Density Grading Atterberg limits Binder content Binder properties Geometry PB/2006/A-2 Other? PB/2006/A-1 Grading PB/2006/B-1b PB/2006/B-1a PB/2006/B-1c UCS Stress and strain at break Time/previous loading HMA Unbound Stabilized PB/2006/B-4 PB/2006/A-3 PB/2006/A-4 PB/2006/C-1 PB/2006/C-3 PB/2006/C-4 PB/2006/C-5 Resilient response models Damage models PB/2006/D-1 HMA Unbound PB/2006/D-2 Other? Stabilized PB/2006/D-3 Subgrade PB/2006/D-2 PB/2006/E-3 Computer solution PB/2006/E-1 and PB/2006/E-2 PB/2006/B-2 and PB/2006/B-3 PB/2006/C-2 PB/2006/B-4

Slide 11 © CSIR

Slide 12 © CSIR Structural Design Working Group Progress Performance based information system due for completion in August 2007 ME-design component Preparation nearly completed R&D framework Project briefs to be finalised after 15 November Project work to start in 2007

Slide 13 © CSIR Announcement ….. In the light of the CSIR mandate, CSIR Built Environment has decided to distribute Pavement Analysis and Design Software (PADS) free of charge from mid-2007 Me – PADS TM Back - PADS TM Traf - PADS TM Pro – PADS TM User certification required - training course Launch at May 2007 RPF