Credit Scenarios – Modification 0335 Joanna Ferguson.

Slides:



Advertisements
Similar presentations
RG0252 UNC Credit Proposals Overview of UNC Modification Proposals to be raised by Gas Transporters reflecting recommendations of Review Group 0252 Review.
Advertisements

Energy Balancing Credit Proposal MOD 315 Energy Balancing Credit Proposal MOD 315 To Enhance Section X of the UNC Transportation Principal Document to.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
NTS Exit (Flat) Capacity Charges – Credit Arrangements (UNC TPD V3.3.4) Simon Trivella – 14 th January 2009 Distribution Workstream.
144A – Calculation of Value at Risk (VAR) Simon Trivella – 24 th May 2007 Distribution Workstream.
USRV Incentives Review Chris Warner. USRV Resolution Responsibility and Occurrence  E8.1.1  “…the User shall investigate Reconciliation Values that.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Review Group 0221: User Commitment Best Practise guidelines for Gas and Electricity Network Operators Credit Cover (2005)
Review Group 0221 Session 4: 28 th October Introduction  Agenda item 4.1 Focus Session: “Who/What capacity holders should be captured by these.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
MP0131: Meter Error Notifications Liz Spierling – July 4 th 2007.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC modification proposal 0407 : Standardisation of notice periods for offtake rate changes for all National Grid NTS Exit Users Transmission Workstream.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 To re-define the Aggregate Reconciliation Period to reflect the period to which the charge relates.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
“Invoicing Arrangements For Late Payments” Distribution Workstream – 28th August 2008 Erika Melen UNC Modification Proposal 0220.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous Workstream discussion ALLOCATION OF RbD ACROSS RELEVANT PERIOD DNOs’ comments on previous.
Administrative Changes to the UK-Link Manual Modification 414 and SIS Removal David Addison.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Modification: Inclusion of as a valid UNC communication Allowing as a valid form of UNC communication in specific circumstances.
Replacement of Any Read – Initial views. 2 Assumptions  Can’t re-open NDM Allocation or Energy Balancing after D+5  Can’t go back to a read before prevailing.
MOD0164 Bi-Directional Connection Point Overrun Charge Calculation Stuart Waudby (Centrica Storage Ltd.)
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Modification 0232 Presentation for Total By Gareth Evans.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Meter Error – NTS Revenue Flows Gas TCMF – 2 nd December 2010.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
FGO: ASA Service Line Review
Supply Point Capacity BSSOQ and Supply Point ratchets
UNC Modification Proposal 0202 National Grid Distribution
Credit Arrangements – Independent Assessments
Modification 0282 Action 002 Update
Simon Trivella – February 2007 Distribution Workstream
PN UNC Workgroup Invoicing 4th October 2011.
Action 0002: Meter Error Notifications
Confirmation Notice Period for Certain ‘Unique’ Sites
Orifice plate meter error resolution – cash flows
UNC Modification 0335 – Offtake Metering Error Payment Timescales
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Modification 0117 – Additional Considerations
Project Nexus Workgroup
Supply Point Capacity BSSOQ and Supply Point ratchets
UNC Modification Proposal 0201 National Grid Distribution
Credit Modification Proposals Update
Proposer: Transporter /
Further Credit Modification Proposals
User Pays Invoicing Type 1
5 September 2012 Joanna Ferguson
Modification 0448 – European Driven Change Process Flow Diagram
Invoicing Proposals 20th May 2013
Enabling Large Scale Utilisation of Class 3
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Enabling Large Scale Utilisation of Class 3
Change Management Committee
Presentation transcript:

Credit Scenarios – Modification 0335 Joanna Ferguson

VAR Requirements 2 UNC V3.2.1(d): Sum of aggregate amount (other than Energy Balancing Charges) invoiced and unpaid PLUS average daily rate of invoices issued in previous month multiplied by 20 UNC V3.3.1(a): Issue of notice of 80% utilisation of VAR UNC V3.3.1(b): 100% VAR requires additional surety or surety in 2 business days Failure to provide additional surety or security enables Transporter to take action by way of sanctions to prevent growth or ultimately to terminate the User

Modification 0335 Impact 3 UNC V3.2.1(d): Sum of aggregate amount (other than Energy Balancing Charges) invoiced and unpaid PLUS average daily rate of invoices issued in previous month multiplied by 20 Modification 0335 creates a new transportation invoice from a Distribution Network to a User for an amount equivalent to the value of the LDZ Commodity Reconciliation and Energy Balancing Charge Therefore the 0335 invoice is subject to the normal UNC V3.3.1 definition of invoiced charges

Credit Example - Current 4 Based on NGN Maximum Unsecured Credit Limit Northern Gas NetworksShipper 1 (AAA rated)Shipper 2 (A rated) Credit Limit 11, Max Limit 29, , Normal Sales 5, VAR 9, Average Peak VAR80% Peak of Max Allowed32%79% OK Credit limit maintained =<80%, no notices issued 50GWh: 12 monthsCommodity 1, Energy - - Total 1, New Sales 6, VAR 11, Average Peak VAR97% Peak of Max Allowed38%96% OK80% Notice 80% notice requirement will result in increased unsecured credit being awarded

Credit Example – Mod Based current Mod 0335 invoicing rules Northern Gas NetworksShipper 1 (AAA rated)Shipper 2 (A rated) Credit Limit 11, Max Limit 29, , Normal Sales 5, VAR 9, Average Peak VAR80% Peak of Max Allowed32%79% OK Credit limit maintained =<80%, no notices issued 50GWh: 12 monthsCommodity SAP = 45p/thermEnergy 5, Monthly 5, New Sales 11, VAR 18, Average Peak VAR161% Peak of Max Allowed64%160% OKAdd'l security req'd AA Shipper will result in increased unsecured credit A Shipper will be required ~£9m to lodge additional security