NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
AIM CPM/LOM Tom Bonnano N74 21 August 2014.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Unclassified: Pre-Decisional 1651 v1.1 AIM FRB May 2010 Mr. Larry G. Paige II Head, Navy Policy, Strategy, Vision and Requirements (N152) Total Force Training.
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
MT Continuum Status 25 February 2015 Presented by Mark Campbell, LMSSC Gerry Cullison, SSP.
Authoring Instructional Materials (AIM) Roadmap
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
MT Continuum Status 4 February 2014 Gerry Cullison, SSP Peter St Jacques, MT Continuum Team System Integrator.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
MT Continuum Status Feb 11 Jake Aplanalp, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, LM SS for SSP Mike French, LSI Jamie Stewart, AIM team.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
AIM Program Software Status
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
project management office(PMO)
Configuration Management
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Release & Deployment ITIL Version 3
What is Business Analysis Planning & Monitoring?
Developing Enterprise Architecture
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
The Evergreen, Background, Methodology and IT Service Management Model
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
FRB NAVEDTRA 136 Business Process Refinement FRB NAVEDTRA 136 Business Process Refinement Roy Hoyt, NETC N74 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD Jamie.
RUP Fundamentals - Instructor Notes
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
NIST Special Publication Revision 1
- 1 - Roadmap to Re-aligning the Customer Master with Oracle's TCA Northern California OAUG March 7, 2005.
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
The Challenge of IT-Business Alignment
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
Microsoft Office Project 2003: Selling EPM in your Organization Matt Wilson Business Solutions Specialist LMR Solutions.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
How do you eat an elephant? Janet May April 21, 2010.
Federal Aviation Administration By: Giles Strickler, UCS Program Manager Procurement Policy (AJA-A11) Date:September 22, 2010 Unified Contracting System.
The Value Driven Approach
AIM Pre-FRB Webmeeting Session 12 Jun 07 Alan Litz NAVAIR Orlando TSD.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
State of Georgia Release Management Training
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Leadership Guide for Strategic Information Management Leadership Guide for Strategic Information Management for State DOTs NCHRP Project Information.
Overview: Spatial Data Standards for Facilities, Infrastructure and Environment (SDSFIE) Services Support FGDC Coordination Group Meeting 6 February 2007.
NETC Authoring Instructional Materials (AIM) Roadmap February Bruce Bare.
Standard Design Process Overview
 Course Master Schedule/Resource Requirement List Authoritative Data Sources. (CeTARS or AIM CPM)  Identify Current CMS Business rules and deficiencies.
Data Management Program Introduction
Sample Fit-Gap Kick-off
Software Project Configuration Management
Service Management World Class Operations - Impact Workshop.
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
Project Initiatives Identified by the CIA Project
Project Ideation Agile Down-to-Earth © 2016.
IT Next – Transformation Program
Presentation transcript:

NETC N6 Status Update to AIM FRB 18 Sep 12 Bruce Bare, NETC, N62 Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD

Overview Enterprise Training Management Framework (ETMF) working group objectives ETMF status and progress CeTARS: CMS and eTEM modules

ETMF Working Group Charter ETMF Working Group objectives: document/analyze existing, “As-Is” state of core business processes required to develop, manage and deliver training curricula, and analyze data to determine duplication, inefficiencies, process improvement opportunities to adjust business practices/rules to maximize IT support resources Business Opportunity: legacy systems for authoring/developing curricula, managing training resources, students and courses created as stand-alone systems, which, in many cases, do not share information requiring same information to be manually entered multiple times contributing to data entry errors and wasted man- hours of productivity Goal/Benefit: Maximize efficiencies by aligning legacy systems which support stand-alone processes into an integrated framework designed to effectively develop, manage, and deliver training to the end user – analyze high impact areas along the core value stream – identify 5 to 6 core processes which are target areas of value by making process improvement, reducing duplication, increasing data validity and training productivity Expected Outcome: list of high value core process/steps that can be improved and of non-value added/nonessential process/steps that can be killed

ETMF Status and Progress

Enterprise Training Management Framework (ETMF) Naval Education and Training Command, Russ McNair, NETC N62 18 Sept 2012 Unclassified 5 9/2/2015

NETC Portfolio Management 6 Design with the “To-Be” Solution in mind, “Without Architecture it doesn’t get built” The Portfolio An evolving set business solutions designed to execute the strategy Enterprise Architecture Governance “If it doesn’t further the strategy, it doesn’t get architected” Strategy Sets the agenda for governance, the foundation for all activity 9/2/2015

ETMF Overview 1.Document and analyze the existing, “As-Is” state  Align Core E2E business processes required to develop, manage and deliver training curricula 2.Analyze the data to identify duplication, inefficiencies, opportunities for process improvement  Improve the User Experience and apply best business practices to maximize IT support resources 3.Assess current system design & interfaces between core training management systems  Determine most efficient alignment and identify opportunities to leverage best practices 4.Recommend strategies that support NETC’s ability to continue the quality and quantity of training  Create a plan to modernize the IT Systems while looking for funding offsets 9/2/20157

Integrated E2E Business Processes 8 Perform IT & TTE Equipment Inventory & Report Associate Assets with Physical Attribute (Bldg or Room) Determine Equipment Requirements List (ERL) by CIN/CDP Map specific IT and non-IT TTE to CIN / CDP & Classroom Perform Equipment Check-in & determine Shortage / Deficiencies (ESL,ITER, TDRs) Report Equipment / Classroom Utilization & Analysis Perform Job Duty Task Analysis (JDTA) Perform Front End Analysis (FEA) Perform Content Quality Review for Content Re-Use or Re-Purpose Develop Business Case Analysis (BCA) Develop Training Project Plan (TPP) Develop New Course or Revise Existing Course and Pilot Deliver Course of Instruction NETC Course Development / Revision End - to - End Process Deliver COI via Robust Instructor Tool Suite NETC Content Management / Delivery End - to - End Process Track Student Training & Execution Management Deliver Course Content via Self Paced (CBT) or Instructor Led Training (ILT) Manage Learning Content SCORM Packages Implement Course Assessment and Survey Tools NETC Course, Classroom & Student Management End - to - End Process Schedule Classes & Spread Quotas Construct CIN / CDPs Mange Course Data (capacities, ratios, course lengths, etc.) Monitor Course, Classroom, and TTE Utilization Ensure Student / Course Completions & Maintain Instructor Certs and Quals NETC Training Enterprise Asset Management End - to - End Process AIM LMS CeTARS eTEMS / eTRMS Host Learning Content & Forward course completions 9/2/2015

9

ETMF “As-Is” Baseline Actions 9/2/ Created multimedia CPI tool for analyzing VSA “string chart” SME One-on-one Process Mapping and Archival Document Collection Process Mapping: Value Stream Analysis Mapping of Critical Core Capabilities and Services Delivered Course Master Schedule process maps and storyboard Delivered Testing and Assessment process maps and storyboard / Reqts Continued discovery, analysis and mapping of RRL/ERL Data Mapping: Authoritative Sources Initial analysis of proposed Services for Open Systems Architecture Design Evaluate essential Interfaces between CeTARS, AIM, ETMDS (LMS), eTRMS System Integration: Concept of Operations

11 “AS –IS” DATA FLOW BETWEEN END-TO-END PROCESSES & SYSTEMS 9/2/2015

ETMF Process Issues Poor Integration Exists Between ETMF Systems – eLearning /Content Delivery System is not currently integrated with the Schoolhouse Management System – Training Content Management System is not automatically integrated with the Schoolhouse Management System – The enterprise Scheduling System is not integrated with any other Training System - (stand alone) Processes are Systems Centric – Legacy systems built to support separate business functions: (Course Development; Content Delivery; Student/Course Management and Resource/Asset Management) Organization Aligned to Manage Systems Separately SMEs are Typically 1-Deep 12 Process Mapping: Value Stream Analysis 9/2/2015

ETMF Life Cycle Data Mapping 13 Course Master Schedule (CMS) Data – – Where is it used and by whom? – Which system is the authoritative? (If AIM change - Policy and Culture) Required Resource List (RRL) Data – Three distinct variations (RRL, ERL, ESL) Configuration/Change Management Policy (CCB) – SOP for producing standard work plan Assessments & Surveys – Multiple systems – Validate Requirements and capability analysis Course Completions & Man-day Accounting – Currently manually entered Training Requirements Capacity/Feasibility – Time-consuming, manual process Class Schedules – Multiple systems with same capabilities Course Content Creation & Management – Content created & stored at LC/LS CeTARS Course Entry & Manipulation – Manual, time-consuming, non-intuitive More (?) - Based on SME Survey Results Data Mapping: Authoritative Sources 9/2/2015

Future Integration Opportunities Immediate State - ( Enhance)  Improve Interfaces & Identify Services  Perform Preliminary Open Architecture (SOA) Analysis Interim State - (Redesign)  Expand CeTARS to include other system’s functionality and eliminate redundancy and duplicate system functionality  Improve the Graphic User Interface (GUI)  Future / Ideal State - (Modernize) Option 1 - Modernize ETMF (SOA Platform) w/Authoritative Data Stores Option 2 - Develop a Federated ETMF Roadmap 14 System Integration: Concept of Operations 9/2/2015

ETMF Next Steps 9/2/ Identify Stakeholders Responsible for Each Key Process Owners (DONE) Finalize VSA documentation and develop ETMF COI within NKO (DONE) Determine METRICS for key processes Conduct an Ideal/Vision workshop and develop “To-Be” end-state Process Mapping: VSA / CPI – Tollgate Review 9/12 Continue mapping and critical analysis of data across entire Life Cycle Continue critical data target architecture mapping (Logical Data Schemas) Finalize and deliver recommendation for assessments tools, RRL/CCB routing Leverage Governance Boards (FRBs, CCBs) to perform CM prioritizations Data Mapping: Phase Requirements Releases (RRL, Tests/Surveys) Deliver final version of partial enterprise architecture (Federated Profile) Continue to perform SOA analysis and leverage best business practices (e.g., CANES) Determine scalability and ratio of e-Learning (IMI) to Instructor led (ILT) delivery Determine best functional design for ETMF architecture based on project findings System Integration: Roadmap for SOA / Modernization

CeTARS: CMS Module AIM I/II CMS re-engineering recently completed per requirements from FRB Working Group –Expanded functionality –Extended from CIN level to CDP level NAVEDTRA 136/CPM –RIS in process for updates –Key integration with ongoing CPM/LO Module enhancement for versioning

eTEM Status and Progress

Enterprise Training Equipment Management (eTEM) Bruce Bare (N62) Naval Education and Training Command 07 SEPT 2012 Unclassified

eTEM Vision Statement Create an authoritative data source for NETC’s training equipment, focused towards providing NETC staff with real-time current inventory analysis tools Provide Learning Centers and their direct report commands with the inventory management tools to – Assess their ability to meet equipment requirements – Conduct inventory control functions – Track inspection/rework planning and results – Collect and report trainer utilization – Support physical inventory custody requirements

Information Flow- “Configuration Management Plus” Trainers Inventories Courses Deficiencies Equipment eTEM CeTARS Learning Center

eTEM Functionality 21

eTEM Functionality Course Configuration Tracking CIN C 2 M 2 Oversight and Equipment Tracking by Course Impacts To Training Or Training Deficiencies Track impacts and abatements, deficiency types, material/equipment shortages Inventory Management Equipment Lists and Asset Tracking, Equipment Requirements (RRL) Management Authoritative Identification, Referenced by CIN, Resolution Tracking Custody Management Track on-hand material, sub-custody items, authorized borrowers Trainer Configuration & Support Management Track trainer configurations, PIT Designations, Trainer Overhaul/Rework and Inspections Publication Management Tracking, Monitoring, Maintaining Publications 22

eTEM Draft AIM Change Request Language Implement changes to Content Planning Module (CPM) To provide capability of importing training equipment requirements data into the RRL RRL section of CPM/LO TPP process model exists within the current AIM II application via the current 'CNATT ERL Import' feature.

CeTARS: eTEM Module

Questions?

Backup Slides

ETMF Back-up Slides 279/2/2015

Charter Tasking 28 “This project will involve documenting and analyzing the existing, "As-Is" state of the core business processes required to develop, manage and deliver training curricula, and analyze the data to determine any duplication, inefficiencies, and/or process improvement opportunities to adjust business practices and/or rules to maximize IT support resources. “ (Supports NETC Integrated Business Plan (IBP) 2.4.2, 3.1.1, and 3.1.2) 9/2/2015

29 All changes require Executive Sponsor approval Demand Signals Functional requirements (Users) – Changes to functionality Technical requirements (FAM, NETWARCOM) – Compliance driven requirements (IAVA, version change) Policy & Procedures (Stakeholders, OPNAV) – Changes to the guidance for using an application or system. 9/2/2015

30 NETC Information Governance Our Thinking About Governance Is Too Narrow – Too Focused on Information Systems (esp CeTARS) – Not Focused Enough On Information – Much More Than Managing System Change Requests NETC Problems With Training Management Functions, Processes and Business Rules Affect Information Management – Lost Corporate Knowledge, – Processes and Business Rules With RIT, Multiple Reorganizations (e.g. The “TPC” Function) – Production And Quality Of Information – System Functional & Technical Requirements Not Effectively Specified NETC Information Governance Should Incorporate: – Support For EIM And Data Stewardship, – Incorporate FRB/CCB Structure – Address Functional Area Policy 9/2/2015

eTEM Back-up Slides

9/2/

eTEM Envisioned Features & Advantages For Naval training staff-members who need to access or update information about training equipment, the CeTARS “enterprise Training & Equipment Management (eTEM)” module delivers real- time access to an authoritative data source of training equipment located throughout the NETC claimancy. By providing Headquarters, Learning Center and Learning Site managers with software tools to analyze, manage, monitor and report on inventory oversight responsibilities, eTEM breaks the paradigm of other schoolhouse inventory systems by linking the equipment data to the Courses managed within each activity. eTEM will allow users to determine equipment requirements for the commands training curriculum and, using on-hand inventory levels, find equipment shortages and excess materials. 33