Carleton College Science Building Addition & Renovation January 26, 27, 28 & 29, 2015 © Copyright EYP Architecture & Engineering. All rights reserved
/ Schedule PROG. & CONCEPT. PHASE Estimate & review Board Meeting SCHEMATIC DESIGN Estimate & review Board Meeting PAUSE for funding Oct Nov Dec Jan Feb Mar April May
PAUSE Complete DESIGN DEVELOPMENT Estimate & review CONSTRUCTION DOCS BID & NEGOTIATE CONSTRUCTION May June July Aug Sept Oct Nov Dec Jan Feb Mar Apr May / Schedule
Support integrated science education: - experience the connections Support student-faculty research: - increase ability to involve more students - incorporate meaningful research opportunities into the science curriculum Enhance the strengths of facilities and programs: - reflect leadership in educating scientists Articulate the (compelling) vision in a robust way: - synergies across departments - continue to provide high standard of education - greater than the sum of its parts GOALS Carleton College Science Building Addition & Renovation January 26-29, 2015
“Carleton is renowned for its rigorous liberal arts curriculum and excellence in undergraduate teaching.”
“intentional contiguities”
Teaching & Carleton
Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf Modular Planning & Flexibility Classroom and Pre-Lab & Data Analysis S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis
Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf Modular Planning & Flexibility S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis
Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf 40’ 30’ = 110’ Modular Planning & Flexibility S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis = 60’
Teaching Laboratory 1,200 sf S/F Research Lab 600 sf Teaching Laboratory 1,200 sf = 110’ Modular Planning & Flexibility S/F Research Lab 600 sf Instrument & Prep. S/F Research Lab 600 sf Study Classroom and Data Analysis = 60’ 6’
Teaching & Research Suite 6,600 sf Modular Planning & Flexibility Offices Hulings Olin Commons
Modular Planning & Flexibility Commons
Mudd Exchange
El. -2’-6”. El. 0.
Modified Master Plan (MoMa)
E E E El. – 2’-6”’. El. 0’. El. - 3’.
Cost
Estimate of Total Project Cost: Budget: $70,000,000 MoMa: $79,750,000 MuddEx: $95,800,000
MoMa:MuddEx