11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006.

Slides:



Advertisements
Similar presentations
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
Advertisements

ERCOT Nodal Protocols Telemetry Requirements Proposal
June 6, 2007 TAC Meeting NERC Registration Issues Andrew Gallo, Assistant General Counsel, Litigation and Business Operations ERCOT Legal Dept.
1Texas Nodal Texas Nodal CRR Annual Model Discussion DRAFT By John Moseley, ERCOT.
1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
January 2008 Texas Regional Entity Report. 2 Performance Highlights ●ERCOT’s Control Performance Standard (NERC CPS1) score for November – ●Scores.
Transparency requirements in accordance with the provisions of Regulation 715 M.Sc. Aleš Osrajnik Ljubljana, 13 September, 2012 ACER Workshop on Transparency.
QSE/RE Transmission Facilities Outage Coordination Workshop.
814_20 – Substation ID updates Background and Proposed Action Plan TX SET – 10/25/07.
ROS Feb 2006 The Model Curtis Crews Network Model Engineering Supervisor
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
Lead from the front Texas Nodal 1 Texas Nodal Energy Management System Requirement Documents December 5, 2006 Jay Dondeti EMS Project.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
12/4/2007 ERCOT Public INF MP Identity Management: Roles Gary Macomber.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
Texas Nodal March Texas Nodal NMMS Requirements By John Adams ERCOT.
1 Nodal Single Entry Model (SEM) Go-Live WMS Update May 18, 2009.
1 Market Trials Outage Scheduling Weekly Update June 25, 2010.
ROS Meeting – 05/15/081Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 05/15/08.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
12/4/2007 ERCOT Public INF MP Identity Management Jeff Floyd Gary Macomber.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Network Model Management System (NMMS)
1 TDTWG Scope and Goals 2015 Wednesday January 8, 2014.
1Texas Nodal Texas Nodal NMMS/RARF Data Discussion By John Moseley, ERCOT, Network Modeling Group.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
814_20 – Substation ID updates Background and Proposed Action Plan RMS – 11/07/07.
1 State Estimator performance. 2 State of Technology Many metrics have been proposed for measuring State Estimator performance.. PI = min Σ( Z – h i (x))^
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
NDSWG Report June 16, NDSWG Report Regular meeting held May 16 in Taylor Telemetry / State Estimator Update Naming Convention Electrical Bus Designation.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
State of Georgia Release Management Training
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Scheduling and Operating Transmission Devices in the Nodal Environment.
Model load frequency Discussion John Adams January 5, 2010 Nodal Advisory Task Force.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
© Property of ERCOT EMMS Improvements Operations Review Group 11/17/04.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
1Texas Nodal Update on Disclosure Issues, including NMMS/RARF Data Discussion ERCOT Staff October 27, 2009.
Telemetry and State Estimator Standards Network Data Support Working Group June 16, 2006.
1 ROS Update regarding TSP Nodal Engagement ERCOT April 12, 2010.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Technical Advisory Committee Presentation to the ERCOT Board of Directors May 20, 2009.
1 CenterPoint Energy presentation to TAC regarding the NMMS April 7, 2006.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
TPTF Update Trip Doggett TAC March 9, TPTF Update Meetings February 6 & 7, February 20 Attendance approximately 40 Completed review of ERCOT’s clarification.
Approval of Important Station Voltages for State Estimator Reporting Review of SE and Telemetry Standards Alex Sills Advanced Network Applications 10/13/11.
6/21/2007 TPTF: Baselines 1&2 WP and CI Baselines 1 and 2 White Papers and Change Items Diran Obadina.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Texas Nodal Program ERCOT Readiness & Transition (ERT) Supplemental Information TPTF January 12, 2009 Kevin Frankeny.
Texas Nodal Electrical Buses and Outage Scheduling.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
Nodal Planning Go Live Austin, TX February 3, 2011
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
PLWG Review 6.9 and the Interconnection process
UFLS Workshop Discussion #3
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
Oncor Electric Delivery Company LLC
September Protocol Transition Plan
Presentation transcript:

11/08/2005 Ken Donohoo How Does NMMS meet the Nodal Protocol Requirements John Adams 3/23/2006

11/08/2005 Ken Donohoo Agree on Meeting Objectives Reach consensus a modeling process with which ERCOT can meet the Nodal Protocol requirements –Pass audit which requires identical results for Operations and planning model intended to represent the same system state (Protocol 3.10 ppg 5) –Coordinate Operations Model with planning model (Protocol 3.10 ppg 9) –Release planning model in CIM format ( ppg 3) –Use dynamic ratings in Annual Planning Model, Network Operations Model and CRR Network model (3.10.8)

11/08/2005 Ken Donohoo Existing Process

11/08/2005 Ken Donohoo Proposed Process

11/08/2005 Ken Donohoo

How NMMS meets requirements 3.10Network Operations Modeling and Telemetry (5) ERCOT shall use consistent information in the various models used by ERCOT Operations, ERCOT Planning, and other workgroups in a manner that yields consistent results. For operational and planning models that are intended to represent the same system state the results should be identical and the naming should be consistent. An independent audit must be performed at least annually to confirm that consistent information is used in all ERCOT Operations models. By using the same source for the Annual Planning Model, for the Network Operations Model and CRR Network models, we guarantee model consistency

11/08/2005 Ken Donohoo How NMMS meets requirements 3.10Network Operations Modeling and Telemetry (9)ERCOT shall update the Network Operations Model under this Section and coordinate it with the Planning Models for consistency to the extent applicable. By using the same source for the Annual Planning Model, for the Network Operations Model and CRR Network model, we guarantee model consistency

11/08/2005 Ken Donohoo How NMMS meets requirements Annual Planning Model (1)ERCOT shall develop models for annual planning purposes (“Annual Planning Models”) that contain, as much as practicable, information consistent with the Network Operations Model. (2)ERCOT shall perform updates to the ERCOT Annual Planning Models for each of the next five years as follows: (a)Annual Planning Model updates are due September 1st; (b)Annual Planning Models are released October15th. (3)ERCOT shall release of Critical Energy Infrastructure Information (CEII), the transmission make available to TSPs and/or DSPs and all appropriate Market Participants, consistent with applicable policies regarding model used in transmission planning. ERCOT shall provide model information through the use of the Electric Power Research Institute (EPRI) and NERC sponsored “Common Information Model” and web-based XML communications. The NMMS and associated business process meets the requirement that ERCOT develop models for annual planning purposes consistent with the Network Operations Model. Then NMMS provides a mechanism to make the transmission model used in transmission planning available to market participants through the EPRI and NERC sponsored Common Information Model.

11/08/2005 Ken Donohoo How NMMS meets requirements Dynamic Ratings –ERCOT shall use Dynamic Ratings, where available, in the Network Operations Model, Annual Planning Models, and the CRR Network Models. The NMMS and associated business process provides a mechanism to use Dynamic Ratings in the Network Operations Model, Annual Planning Models, and the CRR Network Models.

11/08/2005 Ken Donohoo How NMMS meets requirements (2)ERCOT shall provide a system to implement Dynamic Ratings and obtaining monthly expected ambient air temperatures to be applied to rating tables for the Annual Planning Models and the CRR Network Models. Transmission Elements that have Dynamic Ratings implemented in the Network Operations Model must have Dynamic Ratings in the Annual Planning Models and CRR Network Models. The NMMS and associated business process provides a mechanism to apply rating tables for the Annual Planning Models.

11/08/2005 Ken Donohoo How NMMS meets requirements 8.3TSP Performance Monitoring and Compliance (1)ERCOT shall develop a TAC-approved TSP Monitoring Program to be included in the Operating Guides for TSPs. The metrics developed by ERCOT must include the following elements of transmission system planning, operations and maintenance: (a)Transmission Element rating calculations; (b)Real-Time data: (i)Meeting telemetry standards, including the installation of new measurement equipment and the accuracy of measurements; (ii)Communications system availability; and (c)Outage scheduling and coordination; TSP Outage planning and scheduling statistics must have less weight the further out these statistics are from the Planned Outage date; (d)Compliance with model update requirements, including provision of network data in CIM compatible format and consistency with the Transmission Element naming convention developed in accordance under Section 3, Management Activities for the ERCOT system The NMMS and associated business process provides a mechanism for accepting CIM compatible data, and enforcing compliance with the Transmission Element naming convention.

11/08/2005 Ken Donohoo