1 Program Management Systems Committee (PMSC) Scheduling Work Group May 22, 2009 David Treacy 703-623-4534.

Slides:



Advertisements
Similar presentations
Project management.
Advertisements

Project Management Concepts
M EASURING P ERFORMANCE – N EW R EQUIREMENTS FOR D O D P ROJECTS AND P ROGRAMS IPMR I NTEGRATED P ROGRAM M ANAGEMENT R EPORT (IPMR) (DID) DI- MGMT-81466B.
Schedule Analysis: 14 Point Assessment
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
ANSI/EIA A EIA STANDARD Earned Value Management Systems Overview May 2, 2006 NDIA Program Management Systems Committee Walt Berkey, Lockheed.
1 Schedule Risk Assessment (SRA) Overview July 2013 NAVY CEVM.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Engineering Design Development. Turner College and Career High School.
©Ian Sommerville 2004Software Engineering, 7th edition. Chapter 5 Slide 1 Project management.
Gantt Chart Engineering Design Development. Turner College and Career High School.
PRESENTED BY TRUST THOMAS EROMOSELE STUDENT NO:
What is Business Analysis Planning & Monitoring?
Project Management: Madness or Mayhem
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Project management DeSiaMore 1.
NDIA PMSC Scheduling Working Group. Exploratory working group Objective Objective Brainstorm and explore concerns and issues in scheduling bring them.
IT Project Management Cheng Li, Ph.D. August 2003.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Software System Engineering: A tutorial
Hartley, Project Management: Integrating Strategy, Operations and Change, 3e Tilde Publishing Chapter 5 Time Management Developing and controlling the.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 4 Project Integration Management.
Welcome to Session 4 – Project Management Process Overview (continued) Instructor:Phyllis Sweeney Instructor: Phyllis Sweeney Project Management Certificate.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
1 L U N D S U N I V E R S I T E T P rojektledning och Projektmetodik.
Engineering, 7th edition. Chapter 5 Slide 1 Project management.
SacProNet An Overview of Project Management Techniques.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Project Life Cycle.
Chapter 3 Project Management Chapter 3 Project Management Organising, planning and scheduling software projects.
Collecting requirements – Different methods Defining scope – Estimates for all resources Creating the WBS – Different approaches Verifying scope – Formal.
Develop Project Charter
Introducing Project Management Update December 2011.
Copyright 2003 Lynn Frock & Company. All Rights Reserved. 1 Five Ways to Build a Microsoft Project Schedule Lynn Frock, PMP Phone
SUNY TAACCCT Grant PLA Advisory Board Agenda Review of Charge WordPress Site Policy – Philosophical differences on PLA – What makes a good: Policy?
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Project Time Management
Project management 1/30/2016ICS 413 – Software Engineering1.
The Project Plan Plan Your Work, then Work Your Plan
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
Strength through Industry & Technology How is the Government Managing for Value? Program Management Systems Committee March 11, 2007 The Voice of the Industrial.
SOFTWARE PROJECT MANAGEMENT
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
GAO’s Cost and Schedule Assessment Guides U.S. Government Accountability Office Applied Research and Methods Cost Engineering Sciences Jason T Lee, Assistant.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Schedule Margin July 2013 NAVY CEVM
Project Management Systems
Establishing and Managing a Schedule Baseline
Project Integration Management
Project Theory and Application
CIS12-3 IT Project Management
Chapter 3 Managing the Information Systems Project
Schedule Margin July 2013 NAVY CEVM
Schedule Margin July 2013 NAVY CEVM
Project Time Management
Project Time Management
CAD DESK PRIMAVERA PRESENTATION.
Managing Project Work, Scope, Schedules, and Cost
Chapter 3 Managing the Information Systems Project
Presentation transcript:

1 Program Management Systems Committee (PMSC) Scheduling Work Group May 22, 2009 David Treacy

Overview o Status o Issues o Activities Cost and Schedule Integration Affect of DCMA Trip Wires on Schedule Schedule Margin o Best Practice Research o Key Challenge

Status o Schedule working group continues to be ad hoc and requires continued outreach to obtain input and comment o Continuing to examine issues related to the practice of scheduling in context of program and project management o Collecting and assessing standards and practices across domain

Overarching Issues o Scheduling and EVM Relationship o Requirements Consistency o Aligning standards, best practices & requirements o Roles and Responsibilities of schedulers vs CAMs o Affect of Program Characteristics on Scheduling (phase, contract type, etc.) o Integration of cost and schedule o Management use of schedules o Scheduling discipline maturation and career progression o EV engine and schedule software integration and constraints

Scheduling Practice Issues o Treatment of risk and uncertainty in schedule development (SRA, 3pt estimates) o Impact of DCMA Tripwires on scheduling o Appropriate use of constraints in schedule development o Reporting and visibility level for Critical Path o Appropriate baselining techniques (early vs late dates) o Risk Assessment Frequency vs. Schedule Margin Management o Schedule update frequency o Reporting thresholds for task slips

Cost and Schedule Integration Issue Incomplete cost and schedule integration affects schedule realism and utility Discussion Reporting (EV) does not require budgets/resources to be in schedule DI MGMT does not require resource loaded schedules or inclusion of all tasks which consume resources (LOE) Other methods capture resources (CAPs) but “what if” scenarios difficult to accomplish without full integration Hours are most effective unit for identifying finite resources Intent Guide identifies characteristics of an integrated network scheduling system: “Resource estimates from the budget plan are reasonable and resources are available to support the schedule.” Does not require resources to be identified in schedule

Cost and Schedule Integration Impact Reduces value of schedule. Decisions without full understanding and visibility of relationships between triple constraints. Status General consensus that effective schedules will be resource loaded where resources are finite and resource loading is good scheduling practice (is also a DCMA 14pt metric) Recommend Consider revision to Intent Guide to clarify resource loading characteristics and attributes

Impact of DCMA Trip Wire Metrics on Schedules Issue What is impact of the Trip Wires on Schedules? Discussion Assessed DCMA Trip Wire Metrics (BEI, CPLI), expanded to include DCMA 14 Point Metrics 14Pt metrics are goals and not scores, exceptions need to be understood and explained Metrics appear reasonable and based on sound practice Includes resource loading metric, but DID does not require resource loading Discourages leads in schedule but why wait if you can get a head start and resources are not constrained?

Impact of DCMA Trip Wire Metrics on Schedules Impact No apparent negative impact, although use can be either negative or positive (just like EV data) Status Continuous improvement opportunity (CIO) - schedule margin metric Recommend. Collaborate with DCMA to identify possible schedule margin metric and revisit lead metric.

DCMA 14 Point Assessment Metrics MetricWhat it isGoal Logic Predecessors and Successors 1 ea. task Leads Overlap/Concurrency between tasks (negative lag) 0 Lags Delay between linked tasks <=5% Relationship Types Other than Finish to Start (FS) >= 90% Hard Constraints Must start or finish & no later than <=5% High Float Float > 2 months <=5% Negative Float Float < 0 days 0 High Duration Tasks > 2 months <=5% Invalid Dates Forecast dates prior to or actual dates after current status date 0 Resources Hours/Dollars for each tasks All resource loaded Missed Tasks Negative completion variance <=%5 Critical Path Test Broken logic due to missing dependencies No large neg. float Critical Path Length Index (CPLI) Critical Path Length + Total Float Critical Path Length >= 1.00 Baseline Execution Index (BEI) Ratio of completed tasks to tasks planned to be complete >= 1.00

Identification of Schedule Margin in Schedules Issue No consistent definition of schedule margin Discussion Multiple methods of identifying schedule margin Delta between constraint and deadline milestones or inclusion of buffer tasks are the two most common methods No consistent requirements across Government Buffer tasks accepted by NASA and DOE Buffer tasks (feeding buffers) key element of Critical Chain Method (CCM) DI-MGMT defines schedule margin as difference between contractual and planned milestones Also defines “Task” as element of work with duration DID language as written appears to not recognize CCM as a valid scheduling method

Identification of Schedule Margin in Schedules Impact Unfavorable schedule evaluations result from the use of buffer tasks Status White paper in development. Peer reviews conducted. Final review of draft prior to release for community review

Best Practice Research Status o Association for Advancement of Cost Engineering International (AACEI) publishes Recommended Practices (RP) and Professional Practice Guides (PPG) on scheduling o Assessing PPG#20 Forensic Schedule Analysis as an authoritative independent source for schedule analysis FSA is an unifying technical reference for the forensic analysis of scheduling primarily for use in legal proceedings Describes uniform procedures that increase transparency of the analysis method and increase accountability and testability Purpose is to reduce subjectivity and ensures that analysis is based on diligent factual research and analyses whose procedures can be objectified

Key Challenge  Engaging planners/scheduler in an organization focused on EVM/PM  PMSC focus is on integration, policy, and other broad issues  Attendees not primarily planners/schedulers  Lack of a formal forum/community is a challenge to continued evolution of the practice’s integration with EVM and examination and resolution of issues  Investigated PMI College of Scheduling – more construction/claims oriented – only game in town at the moment  Exploring other possible communities of interest (AACEI)  Other alternatives?

To Summarize