TT99-841 Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.

Slides:



Advertisements
Similar presentations
Total Well Management Lynn Rowlan Beam Pumping Workshop Houston, Texas
Advertisements

Slim hole Production Forrest Collier and Bill Hearn.
CONSTRUCTION AND REPAIR OF WELLS Steel Polymer Pipes, Flexible Drill Stems for Mini Coiled Tubing (application for underground repair of wells)
Oil and Gas Industry Presentation Activities, GHG Emission Sources, and Potential Reductions January 14, 2009.
Innovative Energy Technology July 2014
PETE 411 Well Drilling Lesson 17 Casing Design.
PETE 203 DRILLING ENGINEERING
Trican’s Burst Port System (BPS) (Patent Pending) A Cost Effective Method for Horizontal Well Stimulation Lewis Facca / Scott Sherman October 14, 2010.
Present Procedure for cutting stuck casing on Drilling PLATFORM
Environmental Drilling By: Josh Humphreys October 8,2006.
“ Unusual Interventions ” Jenna Robertson ICOTA Canada Roundtable October 14, 2010.
Safely Using Drill Collar Clamps
Training in Oil & Gas Production for BP Technical Interns Section 4 – Pipes, Fittings, and Safety Looking at pipes, valves and fitting that we use for.
Introduction Recently the industry has had to moved from having traditional derrick mounted drill string compensators to utilizing active drawworks. This.
Evolution Oil Tools Inc. (EOT) was formed in January of 2011 Headquarters in Calgary, Alberta, Canada Manufacturing, Assembly and Testing shops are in.
HydroPull™ June 2010 All rights reserved. 2 HydroPull ™ Water Hammer Valve Self-piloted flow cycling valve generates water hammer pulses that vibrate.
SPE High-Pressure Jet Kerf Drilling Shows Significant Potential To Increase ROP 2005 SPE ATCE Dallas, Texas October 9-12, 2005 By John H. Cohen—Maurer.
Beam Pumping Workshop Houston, Texas October 4 - 7, 2005 ROD PUMPING OPTIMIZATION ROBERT WITTMAN, VP ENGINEERING FLOTEK INDUSTRIES, INC.
Sucker Rod Pump Basics. Presentation Contents:  Sucker Rod Pumps  The Five Basic Components of a Pump  Operation of a Sucker Rod Pump  Types of Sucker.
ARTIFICIAL LIFT SYSTEMS ® © 2002 Weatherford. All rights reserved. Unloading Water from Oil Wells Using Air.
Hydraulic Fracturing Best Management Practices Environmentally Friendly Drilling Program John Michael Fernandez Matthew Gunter.
A Noble Drilling Corporation Subsidiary TT April 19, 2001 Coiled-Tubing High Pressure Jet Drilling System Dr. William C. Maurer.
GARP®Presentation ALRDC Seminar May 14 th, 2014 Daryl Mazzanti – Garp Services, LLC Wholly owned subsidiary of Evolution Petroleum Corp (EPM- NYSEMKT )
“PRODUCTION” MIDDLE EAST TECHNICAL UNIVERSITY
Slim Hole Sucker Rod Pumps
Optimising Hydraulic Energy to Dramatically Improve Lateral Reach.
Adaptive Product Technology for Coalbed Natural Gas (CBM)
Reciprocating Electric Submersible Pump (RESP)
Drilling Engineering – PE311 Rotary System
Rock Coring Obtain undisturbed samples of solid, fractured, or weathered rock formations.
Enhanced Oil Recovery using Computerized Hydraulic Lift Systems
Adjustable Speed Drives (ASD): Failure Reduction and Production Optimization Notes go here. Frank Ochoa 07/25/2007.
BASIC DRILLING SCHOOL. COURSE OBJECTIVES During this drilling school you will get all the knowledge about drilling oil and gas wells, design requirements,
Lesson 25 Well Control, cont’d
Drilling String Design
Scientific and production company “ALTERNATIVE TECHNOLOGIES”, CJSC Russia, Novosibirsk region, Koltsovo, 14 Tel./Fax: (383)
1 New Production Technologies for Lifting Liquids from Horizontal Wells Radius Energy, LLC May, 2015.
Nomis Energy Service Limited  Competitive price  Best service  Super quality  Quick response  Technical-based team.
By M. Ghareeb (Lufkin Middle East) Luca Ponteggia (Agip, Italy)
25-26 August 1999Well Control Conference of the Americas Greater Kick Tolerance and Fewer Casing Strings Make Dual Gradient Drilling a Winner Schubert,
Well Design PE 413.
Breakout Session Operator Issues. Attendance 5 Operating Company reps 3 Service Company reps Multi-Vote Gas Lock/Gas Separation (6) Problems setting TAC.
Completing & Producing A Well
Laboratory Testing Of High-Pressure Coiled-Tubing Drilling System
By: Gatut Widianoko Weatherford Artificial Lift Systems
Problem Wells Break out Session 2006 International Sucker Rod Pumping Workshop Houston, Texas.
Artificial Lift Systems
Merrick Systems Inc. Drilling Products Rapid Component Identification System Covered by one or more of the following U.S. patent No’s: 5,142,128; 5,360,967;
Problem Wells Break out Session Beam Pumping Workshop Houston, Texas
Breakout Session Surface and Downhole Equipment Specs How can performance be improved by product selection? OR Can I purchase a perfect pumping system?
Confidential to Subsea Mudlift Drilling JIP11/6/00DGD Template 1 of 64 Dual Gradient Drilling Basic Technology Lesson 1 Introduction to DGD Jerome J. Schubert.
ARTIFICIAL LIFT METHODS
Lecture 10 Production Engineering
ESPY 1-22 Solution GROUP P: JEREMIAH LARSON, CLAYTON HAWORTH, MOHAMMED JAFFAL.
Overview of Petroleum Industry Chapter 4B – Drilling Operations
Cost Effective Offset Well Frac-hit Protection Solution
Oil-Field Hydraulics Chapter 2 Production Equipment
CASING.
Cementing How it is Done
SUSTAINABLE DRILLING OF OIL & GAS WELLS
HYDROSTATIC DEVICE FOR
Recent Advances in Oil and Gas Production Engineering
STV-4 Series Rotary Lock Traveling Valve Eliminates ALL Gas Lock!
Alejandro F. Ameglio – Head Technical Services Tenaris Rods Division
Shell Exploration & Production
Deviated Rod Pumped Failure Methods
Historical Review of Dual and Multiple Completions
Steel Tubing: A Flexible Product for a Broad Range of Market Needs
Iross™ Fluxmanager® Stress relieving System
Presentation transcript:

TT Artificial Lift Utilizing CT as a Hollow Sucker Rod Humberto F. Leniek COIL TUBING AMERICAS Dr. William C. Maurer MAURER ENGINEERING INC.

TT Stekoll Slimhole Pumping System (1960) Flow Line Rubber Hose 1” Tee Clamp Polished Rod Liner 2 7/8” Casing 1” EUE Pumping String Traveling Barrel Insert Pump Slip-Type Hold-Down with Rubber Removed Screen Blind Cage Gas Vent Conventional Stuffing Box

TT Stekoll Field Well (1960)

TT STEKOLL Field Experience (1960) Over 1,000 Wells 3,000 to 5,000 Foot Wells 1” EUE Tubing (Hollow Sucker Rod) 2-1/2” & 2-7/8” Inch Casing 70 BOPD 40 to 50% Reduction in Tubular Costs 17% Overall Cost Savings

TT STEKOLL Slimhole Wells (1960) Bolton Field, Kansas (1,000 ft) - 1,000 Wells Corsicana, Texas (1,200 ft) Wells Panhandle, Texas (3,000 ft) - 20 Wells Canada (5,000 ft) - 15 Wells

TT STEKOLL Slimhole Operations (2-7/8”) Drilling & Logging Perforating & Squeeze Cementing Acidizing & Fracturing Fishing & Washovers Sand Bailing Dual Completions

TT Hollow Sucker Rod Advantage “The hollow sucker rod combines the function of the sucker rod and the tubing, so it is no longer necessary to pull both sucker rods and tubing when working over wells.” STEKOLL, 1960

TT STEKOLL System Limitations (1960) Limited Slimhole Logging Tools Workover Concerns Tubing Failures Resistance to Slimholes Resistance to New Technology

TT Leniek Pumping System (1999) Production Line 1-1/2” Hydraulic Hose Clamp Hollow Polish Rod 2-7/8” or 3-1/2” Casing (CT or Tubing) 1-1/2” Coiled Tubing Hollow Rod Pump Anchor Screen Gas Vent Stuffing Box

TT Leniek CT Pumping System Conventional Surface Equipment 1,000 to 5,000 Feet 2-7/8” or 3-1/2” Casing (CT or Tubing) 1-1/2” CT (Hollow Sucker Rod) Hollow Polish Rod Hollow Rod Pump

TT Leniek Surface Equipment (1999) Lubricated Stuffing Box Hollow Polish Rod Dynamometer Holder Bridel Polish Rod Clamp 1-1/2” Hydraulic Hose Production Line “U” Tube Hydraulic Connector

TT Hollow Rod Pump Screen Anchor Perforations 1-1/2 Coiled Tubing 2-7/8” or 3-1/2” Casing (CT or Tubing) Gas Oil Leniek Bottomhole Assembly

TT Coiled Tubing Hollow Pull Rod Pump Plunger Traveling Valve Standing Valve Hollow RodConventional Pump Barrel Pull Rod Tubing Pump Plunger Traveling Valve Conventional Seating Nipple Standing Valve Pump Barrel Sucker Rod Pumps Anchor Tubing

TT Leniek System Advantages Reduce Well Construction Cost 50 Percent Eliminates Tubing Thread Failures Eliminates Tubing Anchors Reduce Lifting Costs Reduce Paraffin Problems Reduce Casing Wear Treat Wells Through CT Eliminate Rod Failures Allows Ultraslim Holes

TT Initial Concerns CT Fatigue Failures CT Buckling CT Wear Casing Wear

TT Argentina YPF Test ( ) San Jorge Basin 2,600 Foot Well 60 BPD 2-7/8” Casing (Tubing) 1-1/2” CT 13 Months (No Failures)

TT YPF Test

TT YPF Test

TT YPF Test

TT

TT Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure >30 >20 > Acceptable

TT CT Fatigue Life vs Stroke Rate

TT Leniek Potential Applications Marginal Oilfields Shallow Wells Low Production Wells (<300 BOPD) Close Well Spacing In Fill Drilling Drill New Wells With Smaller Drilling Rigs

TT Leniek Marketing Options Start Service Company Form Alliances with Service Companies License Patent Rights to Service Company Sell Territorial Rights to Operators Form Partnership With Major Independent Drill Slimholes Free For Oil Participation Purchase Shallow Fields and Become Operator

TT

TT Installation & Workover Requirements CT Rig New CT Good Supervision

TT Future Requirements CT Centralizers Low Cost CT Pulling Units Trained Personnel Industry Acceptance Service Company Supplier

TT Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure >30 >20 > Acceptable

TT Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure >30 > Unacceptable

TT Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure >30 >20 > Acceptable

TT Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure >30 > Unacceptable

TT Project Name: Well Name: CT OD (in): CT Wall Thickness (in): Casing Pipe OD (in): Casing Pipe Weight (lb/ft): CT Yield Strength (psi): CT Weld Reduction Factor: Stress Concentration Factor: Fatigue Strength Coefficient: Pumping Fluid Density (ppg): CT Job Corrosion Factor: Stroke Rate (stk/min): Pumping Stroke Length (in): CT Length (ft): CTPS XYZ Coiled Tubing Pumping Fatigue Model CT Length (ft) Years to Failure >30 > Acceptable

TT Conventional Stuffing Box Production Tee 2-7/8” J-55 Non Upset Seamless Tubing Set As Casing Flexible Rubber Hose to Oil Lead Line Hollow Polish Rod Gas Vent 1” J-55 External Upset Seamless Tubing Used as Sucker Rods 1” J-55 External Upset Seamless Tubing Used as Sucker Rods

TT

TT Sucker Rod Pump in Horizontal Well ft. Pump (30 O inclination) Pump Jack Oil Pump (90 O inclination)