OMA and Interoperability Testing Gilbert Buty Chairman, Interoperability Working Group, OMA www.openmobilealliance.org iMobicon, Seoul, Korea, August 22,

Slides:



Advertisements
Similar presentations
World Class Standards IMS Interoperability Testing - from Standards to Practice Giulio Maggiore ETSI TC INT Chairman © ETSI All rights reserved.
Advertisements

Location Services Overview Larry A. Young Chairman, OMA Location Working Group SDO Emergency Services Coordination Workshop 5 th and 6 th October, 2006.
1 Service Providers Capacity Assessment Framework Presentation to the Service Delivery Advisory Group August 28, 2008.
IETF – March 2012 OMA OpenCMAPI presentation IETF – March 2012 Thierry Berisot Chairman OMA CD-OpenCMAPI SWG Deutsche Telekom.
IEEE Conformity Assessment Program (ICAP) – An Overview Rudi Schubert Director – ICAP Prepared for: CS-SAB Meeting March.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All ETSI Standardization Activities on M2M communications Joachim Koss, ETSI Board Member Document No:
Introduction to OMA iMobicon Mark Cataldo Chairman, Open Mobile Alliance Technical Plenary September 25, 2006.
© 2008 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
IS 214 Needs Assessment and Evaluation of Information Systems Managing Usability © Copyright 2001 Kevin McBride.
1 2-1 McGraw-Hill/Irwin Copyright © 2003 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc.,
Commonwealth of Massachusetts Statewide Strategic IT Consolidation (ITC) Initiative ITD Virtualization and Shared Services Executive Briefing Presentation.
Converged IP Messaging Integrating multiple communications platforms, multiple devices and existing standards for interoperability Kevin Holley Vice Chair,
Digital Rights Management 5th Annual Wireless Java Conference January 21-23, 2004 Kevin Mowry, Motorola Chair, OMA Download and DRM group.
OMA overview and M2M-related activities Presentation to oneM2M Steering Committee Bellevue, USA, 24 th -26 th July, 2012 Mark Cataldo, Chairman of the.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Open Mobile Alliance Application Layer Interoperability in a Converged World IMOBICON Mark Cataldo Chairman, Open Mobile Alliance Technical Plenary August.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt E2E IMS Interoperability Test Environment Ali Soujeh Senior Specialist, Interoperability Ericsson.
MISMO Business and Standards Round-up Fall 2013 Educational Summit & Workshops MISMO Business and Standards Round-up Presenters: Kyle Bensen, MGIC, Chair.
SNIA/SSIF KMIP Interoperability Proposal. What is the proposal? Host a KMIP interoperability program which includes: – Publishing a set of interoperability.
Engineering, Operations & Technology | Information TechnologyAPEX | 1 Copyright © 2009 Boeing. All rights reserved. Architecture Concept UG D- DOC UG D-
What I Know About OMA Or At least What I Think I’m Allowed To Say, as I Think This is All Public Knowledge Dean Willis November 20, 2002.
M2M Consolidation August 17-18, 2011 Washington D.C. 1 ARIB/TTC’s Feedback on Consolidation Issues M2MCons02_06.
The Challenge of IT-Business Alignment
Innovation Use Case <Solution Title> <Partner Name>
5 October 2015 AllSeen Alliance 1 Testing C&C WG 30 July 2014.
Promoting Web Services Interoperability Across Platforms, Applications and Programming Languages Basic Profile 1.0 August 12, 2003 Copyright © 2003 by.
Java certification into GCF Vodafone S r2 Restricted - Confidential Information This document is confidential to the Global Certification Forum (GCF)
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
Interoperability event proposal Group Name: WG TST Source: Sookhyun Jeon, TTA, Laurent Velez, ETSI, Meeting Date:
© Mahindra Satyam 2009 Decision Analysis and Resolution QMS Training.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
NCOIC Building Blocks Catalog Network Centric Operations Industry Consortium NCOIC Building Blocks Catalog July 2008 Approved for Public Release NCOIC-BB.
ITU Regional Standardization Forum for Americas (Washington D.C., United States, 21 September 2015) Conformance and Interoperability Activities in CITEL.
ISA Setting the Standard for Automation ™ Automation Standards Compliance Institute ISA Security Compliance Institute (ISCI) Prepared by: Andre Ristaino,
Copyright © 2003 Open Mobile Alliance Ltd. All Rights Reserved. Open Mobile Alliance Presence Enabled Messaging Specifications Presence, Mobile Instant.
© 2005 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
© 2003 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Copyright © 2002 Open Mobile Alliance Ltd. All Rights Reserved. Open Mobile Alliance Open Approach to the Mobile Industry Copyright © 2002 Open Mobile.
International Harmonization of Cooperative Systems Standards and the IntelliDrive SM Program ITS-JPO Standards Program Update Brian Cronin Team Leader,
MMS use case OMA on the right track OMA World 2007, London Philippe Lucas – Orange 13 th December 2007.
Slide title In CAPITALS 50 pt Slide subtitle 32 pt Ericsson IMS CANTO 2005, St. Kitts Antonio Gómez Business Unit Systems.
1 © NOKIA Open Mobile Alliance / / Vipul Mehrotra Open Mobile Alliance Vipul Mehrotra Senior Manager, Strategic Marketing Nokia Mobile Software,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
© 2007 Open Mobile Alliance Ltd. All Rights Reserved. Used with the permission of the Open Mobile Alliance Ltd. under the terms as stated in this document.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Census Processing Baku Training Module.  Discuss:  Processing Strategies  Processing operations  Quality Assurance for processing  Technology Issues.
3rd Helix Nebula Workshop on Interoperability among e-Infrastructures and Commercial Clouds Carmela ASERO, EGI.eu 17 September 2013, Madrid
Discussion points for 2 nd Interop Event Group Name: TST WG Source: Keebum Kim, TTA, Meeting Date: TP#22.
CMMI Certification - By Global Certification Consultancy.
Rob Connatser NSS Instrument Work Packages and XLPM.
Status report on CJK NGN Working Group
BANKING INFORMATION SYSTEMS
Open Mobile Alliance Application Layer Interoperability in a Converged World IMOBICON Mark Cataldo Chairman, Open Mobile Alliance Technical Plenary August.
Week 6 Innovation Process
ETSI NFV POCS and PLUGTESTS
Status report on CJK NGN Working Group
ETSI Standardization Activities on M2M communications
Health Resources and Services Administration (HRSA)
CUNY City College Kickoff Meeting November 2nd, 2017
Presenter: Luis Jorge Romero oneM2M Steering Committee Chairman
Amendment Invoice Task Force Progress Report
Web Services Interoperability Organization
OMA Perspective ETSI SOS Interop II Meeting
Employee engagement Delivery guide
Jørgen Friis, ETSI VP SES
Amendment Invoice Task Force Progress Report
Conformance and Interoperability Activities in CITEL PCC.I
Presentation transcript:

OMA and Interoperability Testing Gilbert Buty Chairman, Interoperability Working Group, OMA iMobicon, Seoul, Korea, August 22, 2007

2 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Agenda OMA and Interoperability (IOP) IOP Working Group Activities IOP Process OMA TestFest Benefits OMA Enablers (Current and Approved) OMA Test Tools OMA TestFests in Detail TestFest Achievements

3 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA and Interoperability Fast paced innovation and development have resulted in increased demand for interoperability and inter-working in a multi-party environment OMA has a commitment to increase the number of Enabler specifications in which implementations are tested OMA TestFests - Verification of specification interoperability, stability and quality OMA is committed to reducing the time to market with open specifications which are tested for quality through its IOP program

4 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. IOP Working Group Activities The IOP Working Group objectives are to ensure the quality and interoperability of OMA specifications and the resulting implementations Main activities: Maintenance of the required processes, policies and test programs Development and Approval of Test Specifications Enabler Test Specification (ETS) Enabler Validation Plan (EVP) Enabler Implementation Conformance Statement (EICS) Organization of OMA test events (TestFests) Review and Analyze TestFest results reported

5 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No

6 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No TWG prepares the Test requirements To be validated by IOP

7 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No IOP starts to work on test specifications ASAP to foster the process

8 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No When ETS/EVP sufficiently developed, IOP may decide to start prototype testing

9 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No When ETS/EVP approved by TP, enabler goes to TestFests or Bilateral Testing events

10 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No Results from testing are fed back to IOP to improve quality of specifications

11 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Architecture Review Consistency Review Candidate Package Prototype Testing ETR Approved Enabler ETS TestFests Bilateral Testing Testing Phase OMA IOP Simplified Process Enabler Specifications Test reports and generation of IOP Report Loop process EVP TP Agreed ? Yes No When enough test Results are collected, IOP recommends “Approved” status

12 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFest Benefit to Members By participating in an OMA TestFest, companies can: Expand their market opportunities by ensuring that their products are interoperable with other industry implementations of OMA specifications Avoid costs and delays in product deployments by resolving specification issues before deployment Participate in the identification and resolution of technical issues to help bring new products and services to market much quicker

13 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Status of Current Enablers in IOP On the road towards the “Approved” Status IMPS 1.1 IMPS IMPS 1.3 MMS 1.1 MMS 1.2 OCSP 1.0 PoC 1.0 Presence 1.0 STI 1.0 SUPL 1.0 XDM 1.0 “Approved” Status Enablers Browsing 2.1 Browsing 2.2 Charging 1.0 CSCSF 1.0 DS DS 1.2 DM DM 1.2 DRM 1.0 DRM 2.0 DL 1.0 FUMO 1.0 Browsing 2.3 BCAST 1.0 CP 1.1 DL 2.0 DRM 2.1 EMN 1.0 GS CSI 1.0 MMS 1.3 Push 2.1

14 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA Test Tools IOP program also facilitates enabler test tools No longer mandates test tools as entry criteria to OMA TestFests Although continuing to work with test tool industry to develop TTCN-3-based Conformance Test Cases Plan to make TTCN-3 Code available Test Tool Industry will incorporate TTCN-3 code into their tools Members can license tool from industry Self test of implementations in own lab and Results log file can be made available to customers

15 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Available OMA Test Tools DM v1.2 SCTS for DM v1.2 – Open Source tool available from SourceForge (Project: OMA- SCTS) DRM v2.0 CTT from CoreMedia (Available to License) BCAST v1.0 TTCN-3 Test Cases currently being developed in a pilot project to help make OMA tools available throughout the industry. Test Cases expected to be available in Oct 2007

16 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFests in Detail OMA interoperability events Held 4 or 5 times per year Between 80 and 140 engineers attending Test about 6 to 8 different enablers 40 to 60 test teams 6 or 7 day event

17 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFests in Detail Provides confidential neutral environment Allows inter-working between competitors Provides complete mobile infrastructure 2G and 3G networks (GSM, CDMA, W-CDMA) WAP Gateway, PPG, SMS Centre, IMS System Formal testing against Test Specifications Results reported anonymously to IOP WG Allows assessment of enabler for approval Problems and issues fed back into OMA process through neutral reporting system

18 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA TestFest Achievements 21 Test Events held to so far Over 1100 implementations tested 144 in 1 st Year (11/02 – 10/03 – 5 events) 178 in 2 nd Year (11/03 – 10/04 – 4 events) 263 in 3 rd Year (11/04 – 10/05 – 4 events) 429 in 4 th Year (11/05 – 10/06 – 5 events) 148 so far in Year 5. Over 500 problems and issues raised to OMA All related to Specifications Implementation errors dealt with by participants

19 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. Opportunities in 2007 & 2008 Continuing to Plan 5 TestFest per annum 3 more events in 2007 Over 20 new Candidate Enablers will start Testing in 2008 BCAST v1.0, DRM 2.1 already testing at September 2007 events Other Opportunities to be explored

20 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. TestFest Dates/Hosts in 2007/ th - 14 th September 2007 Vodafone, Düsseldorf All Enablers except BCAST 21 st – 28 th September 2007 Vodafone, Düsseldorf BCAST Only Event 9 th - 16 th November 2007 Mobitel & Sintesio, Bled, Slovenia 2008 Dates available on OMA website Locations still being planned

21 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA Permanent TestFest Sites OMA’s Objective To appoint a number of sites ready to host TF Help OMA to improve it’s ability to plan TestFests using both volunteer and permanent sites Criteria for selection Commercial Terms, Technical Ability, Organizational Capabilities 4 sites already selected China Mobile (Beijing), ITT (Montreal), TeliaSonera (Helsinki), Vodafone (Düsseldorf) Opportunities for other companies to become a Permanent TestFest Site

22 Copyright © August 2007 Open Mobile Alliance Ltd. All Rights Reserved. OMA Product Listing Recognition for companies participating in TestFests Ability to list products and the enablers they support Must include general TestFest results Can optionally list: Functionality of Product (EICS) Company’s Results achieved at TestFest (ITR) Web-site open to public access in June Products listed from 35 Companies already listed