Identifying opportunities and evaluating stormwater practices in ultra-urban catchments. Neely L. Law Sally Hoyt October, 2006.

Slides:



Advertisements
Similar presentations
creating a sustainable world The Chesapeake Bay TMDL A Policy Model for Nutrient Pollution Reductions James Noonan October.
Advertisements

NPDES Phase II Permit City of St. Louis Park Annual Storm Water Informational Meeting April 16, 2009 Scott Anderson Superintendent of Utilities.
Total Suspended Solids (TSS) Reduction Presenter: Keith Noble, Saginaw Bay District Office.
What are TMDLs? and What Might They Mean to MS4 Permittees?
An Evaluation of BMP Removal Efficiency in the Kensico Reservoir Watershed New York City Department of Environmental Protection September 2008 Prepared.
Roger Williams Park Ponds Restoration Project. Project Update Concept Plans Developed for Structural and Non- Structural Best Management Practices Draft.
Stormwater Retrofitting Demystified! A training for local governments to cost effectively implement retrofits to meet MS-4 permit and Chesapeake Bay TMDL.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
David K. Paylor Director, Department of Environmental Quality May 27, 2014 VEDP Lunch & Learn Environmental Permitting 101.
Modifications to the Storm Water Ordinance The City Municipal Separate Storm Sewer System (MS4) drains rainwater and all runoff into natural streams. EPA’s.
NPDES Phase II Storm Water Regulations: WHAT MUNICIPAL GOVERNMENTS NEED TO KNOW.
December 3, 2012 Laurel Woodworth Center for Watershed Protection.
& Community Design LSU Green Laws Research Project Green Laws Louisiana Department of Agriculture & Forestry EBR Parish Tree And Landscape Commission Louisiana.
Current Planning for 2017 Mid-Point Assessment Gary Shenk COG 10/4/2012 presentation credit to Katherine Antos and the WQGIT ad hoc planning team.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
Baltimore County’s Stormwater Remediation Fee Opportunities for surveyors & geospatial professionals Robert Hirsch Natural Resource Specialist Baltimore.
Deriving Reliable Pollutant Removal Rates for Municipal Street Sweeping and Storm Drain Cleanout Programs A project funded by U.S. EPA Chesapeake Bay Program.
MCM#6 Pollution Prevention/Good Housekeeping Part 4 Part 4 Municipal BMPs – Cleaning &Maintenance.
Mark Dubin Agricultural Technical Coordinator University of Maryland Extension-College Park Modeling Quarterly Review Meeting April 17, 2012.
Nutrient Trading Framework in the Coosa Basin April 22, 2015.
Stormwater Infrastructure for Water Quality Management Dr. Larry A. Roesner, P.E. CE 394K.2 Surface Water Hydrology University of Texas, Austin April 8,
AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 Potential Reductions of Street Solids and Phosphorus in Urban Watersheds from Street Cleaning, Cambridge,
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Ann Swanson Executive Director Chesapeake Bay Commission May 2012 Market Solutions and Restoring the Chesapeake The Economics of Nutrient Trading.
Loudoun Watershed Watch “ Restoring Loudoun Streams” LCSA Water Forum Presented by: Darrell Schwalm Loudoun Watershed Watch Loudoun Wildlife Conservancy.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
Item #17: Board Workshop Alamitos Bay and Los Cerritos Channel Watershed Management Area Watershed Management Program Approach October 9, 2014.
Creation of MS4 Regulations Green / Tradewater River Basin Team Henderson, Kentucky Prepared by Henderson Water Utility April 22, 2008.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
DC Draft Phase II Watershed Implementation Plan Stakeholder Meeting March 1, 2012 Metropolitan Washington Council Of Governments Hamid Karimi Deputy Director.
The Watershed Treatment Model Chesapeake Bay Science and Technical Advisory Committee (STAC) Annapolis, MD June 7, 2011 Deb Caraco Center for Watershed.
 Casey Lake, North St. Paul CE 5511 Urban Hydrology and Land Development Instructor: John S. Gulliver Presented by: Joshua Balzer Stephanie Hatten Maria.
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
Stormwater Management For Developed Municipalities What Residents Can Do What Towns Can Do.
MDOT Storm Water Management Plan Module 2: Best Management Practices
State of Connecticut Department of Transportation Stormwater Management Plan CONNECTICUT DEPARTMENT OF TRANSPORTATION Bureau of Policy and Planning Cynthia.
Patapsco and Back River HSPF Watershed Model Part II – Water Quality Maryland Department of the Environment.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Urbanized Stream Source Ratio October 20, 2015 Urban Stormwater Workgroup Reid Christianson, PE, PhD Neely Law, PhD Bill Stack, PE.
Caroline County Pilot Watershed Implementation Plan (WIP) Katheleen Freeman, AICP, Director Caroline County Department of Planning & Codes Leslie Grunden,
Evaluation Measures for Municipal Storm Water Management Programs Daniel Rourke Fresno Metropolitan Flood Control District October 15, 2003 Counting Raindrops.
HAMPTON ROADS REGIONAL WATER RESOURCES MANAGEMENT PROGRAM Presentation John M. Carlock, AICP Deputy Executive Director, Physical Planning Hampton Roads.
JULIE MAWHORTER MID-ATLANTIC URBAN & COMMUNITY FORESTRY COORDINATOR CHESAPEAKE TREE CANOPY STRATEGY & WORKPLAN UPDATE CITIZEN’S ADVISORY.
Caltrans Trash Reduction Workplan. SF Bay Trash Control Requirements Permit Driver  CT Permit Attachment V – SF Bay Region-Specific Requirements Requirements.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
City of Clarksville Storm Water Management Manual Revisions 2014.
Lower Rio Grande Valley Low Impact Development (LID) Implementation and Education by Brianna Saenz,MS, EIT AUGUSTO SÁNCHEZ-GONZÁLEZ, M.S, CFM. Institute.
TMDL Implementation: Now What?
Using RMMS to Track the Implementation of Watershed-based Plans
LOW-IMPACT DEVELOPMENT
Illinois Nutrient Loss Reduction Strategy - NLRS
Chesapeake Bay Program Partnership’s Citizens Advisory Committee
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
City of Forest Lake MS4 Program
GIS Data Management for SHA’s Bay Restoration Program
Anne Arundel County Maryland
Stormwater Retrofit at a Challenging Site
MDE’s Phase III WIP Inventory 2018 Fall Regional WIP Meetings
Watershed Restoration, Chesapeake Bay
SHOAL CREEK WATERSHED ACTION PLAN
Presentation transcript:

Identifying opportunities and evaluating stormwater practices in ultra-urban catchments. Neely L. Law Sally Hoyt October, 2006

About the Center for Watershed Protection Non-profit 501(c)3, non-advocacy organization Work with watershed groups, local, state, and federal governments Provide tools communities need to protect streams, lakes, and rivers 20 staff in Ellicott City, MD

Watershed 263 Location MapWatershed 263 Catchments Catchment O Catchment F Watershed 263

I.Deriving Reliable Pollutant Removal Rates for Street Sweeping and Storm Drain Cleanout Programs in the Chesapeake Bay Basin US EPA Chesapeake Bay Program –Center for Watershed Protection (CWP) –UMBC (Engineering, CUERE) –City of Baltimore, DPW –Baltimore County, DEPRM –USDA Forest Service, Baltimore Ecosystem Study II.Watershed 263 BMP Theme Park Chesapeake Bay Trust Pioneer Grant City of Baltimore, DPW Maryland Department of Environment –Center for Watershed Protection (CWP) –EA Engineering

Stormwater Management Strategy for Catchment O in Watershed 263 Prepared for: Parks and People Foundation Prepared by: Center for Watershed Protection Through a grant from: Chesapeake Bay Trust April 2005

Assessment of Relative Dirtiness of Streets in Catchment O (CWP 2005)

Streets and Storm Drain Inlet Conditions The Bad The Ugly The Good

Storm EMCs for TSS, TN and TP (9/28/05 – 1/31/06) Median pretreatment water quality Parameter (mg/L) Catchment O Stormflow Catchment F stormflow National Storm EMC Suspended Solids Total P Total N Catchment O: Baltimore St; Catchment F: Lanvale St.

Street Sweeping and Storm Drain Cleanout Study Purpose Need more reliable estimates of the potential nutrient and sediment reductions achieved by municipal street sweeping and storm drain cleanouts Municipalities are sweeping and cleaning storm drains – can it make a difference in reducing nutrient loads to Bay?

Project Study Tasks Task 1: Literature Review and Reference Tracking System Task 2: Basin-wide Municipal Practices Survey Field monitoring program Task 3: Paired Street Sweeping Treatment Task 4: Street Source Area Sampling Task 5: Characterization of Stormdrain Sediment

Study Design for Street Sweeping Treatments 2 yr. (10-05 thru 9-07) Paired watershed Catchment F –85% reduction in curb miles swept –1x/week Catchment O –48% increase in curb miles swept –2x/week Vacuum street sweeper Bedload samples CatchmentFO Area38.4 ac38.7 ac Impervious68%77% Pervious32%23%

Task 1: Literature Review Interim Pollutant Removal Rates for Sweeping Discounted for: –Solubility –Washoff & fugitive dust loss –Frequency –Technology –Parked cars –Street conditions –Runon Frequency TP removal Monthly4 % Twice a week8 %

Frequency of cleanout % TN Removal Annual5 Semi-annual10 Task 1: Literature Review Interim Rates for Catchbasin Cleanouts Discounted for –Frequency –Particle size distribution of dirt load –% catch basin or inlet full –Cleanout method

Task 2: CB Municipal Practice Survey 43 questions 4 section –Community condition –Street Sweeping practice –Stormdrain maintenance –Monitoring 73% response rate Distribution of 37 surveys Phase I communities and agencies (23, 16)  11 Maryland  11 Virginia  1 Pennsylvania Phase II permit communities (6, 4)  1 Maryland  3 Virginia  1 West Virginia Greater United States (8, 7)  Pennsylvania, Wisconsin, Minnesota, Florida, Texas, California

Survey Key Findings $13 million/year sweeping and cleanouts 70% of Phase I and II communities sweep at least 1x/year 85% of Phase I and II communities sweep more frequently than annually $14.75 to $75/curb mile Aesthetics and residential demand

Key Findings: Storm drain cleanout Of 20 responses, – 8 regular schedule cleanouts –12 response to complaints or clogging $1.40/linear ft; $55/catchbasin What proportion of all storm drains, inlets or catch basins are cleaned out on an annual basis? (n=16) Proportion 100%75 < 100%50< 75% Up to 50% Response 06.3% (1)31.3% (5)62.5% (10)

Watershed 263 BMP Theme Park City of Baltimore, DPW – Environmental Services Division Center for Watershed Protection – Site and practice selection. Virtual Tour. EA Engineering – Final design and construction drawings.

Design and Construct 5-7 BMP’s to filter rainwater BMPs that are new/seldom used in the Chesapeake Bay region Create a website “tour” so others – citizens and engineers – can learn. BMP Theme Park - What

BMP Theme Park - Timeline COMPLETEStormwater Strategy (2005) – the universe of possible projects COMPLETEField work to find the projects that could work physically Fall 2006Local residents’ input on locations and types of practices Fall 2006Maintenance plans, concept designs Winter 2007Construction drawings Summer 2007Construction 2007Website “Tour”

Retrofit types –Biofiltration in ROW –Biofiltration in vacant lots –Catch basin inserts –Stormwater planters –Sand filters in ROW/underground Treatment of up to 26% of the 39-acre catchment with 7 retrofits.

Biofiltration in ROW- 15 Possible Locations (Drainage areas acres)

BMP Selection Criteria Biofiltration Roadway slope (max 4%) Utility locations Street width (>40 ft.) Downstream inlet with invert minimum 2’ below grade On-street parking Traffic volume

Virtual Tour Website for the constructed and non- structural practices. Resources for citizens and technical audience. Practice descriptions and technical spec downloads. Photos and a printable brochure.

Other CWP Work of Interest Small Watershed Restoration Manual Series Maryland Watershed Users Guide Smart Watershed Benchmarking Tool Urban Watershed Forestry Manuals Wetland and Watersheds Articles

Catchment F (38.43 acres) Monitoring Station

Catchment O (38.7 acres) Monitoring Station