DSS applications for Water Resources Management in Kerala state

Slides:



Advertisements
Similar presentations
LOGO Bangkok, May 2009 Water Resources Management in Ba River Basin under Future Development and Climate Scenarios Presented by: Nguyen Thi Thu Ha Examination.
Advertisements

Getahun Wendmkun Adane March 13,2014 Groundwater Modeling and Optimization of Irrigation Water Use Efficiency to sustain Irrigation in Kobo Valley, Ethiopia.
INTEGRATED RIVER BASIN MANAGEMENT IN WESTERN GHAT REGION THROUGH A CASE STUDY Dr A B Anitha Scientist F & Head Surface Water Division Centre for Water.
Use of a hydrodynamic model to
ADRICOSM-EXT PROJECT (ADRIatic sea integrated COastal areaS and river basin Management system pilot project - EXTension) WP2 – INTEGRATED CATCHMENT SIMULATOR.
Antamina Mine Water Management Model Alan Keizur Golder Associates Roberto Manrique Arce Compañia Minera Antamina User Conference 2006 Background The Antamina.
Engineering Hydrology (ECIV 4323)
………Solving Every Water Problem. Proficiency Ground Water Targeting & Development Watershed plans for sustainable ground water development and management.
WATER RESOURCES SIMULATION
Ch  Know what design frequency means  Know how to delineate a drainage area on a topographic map 2.
Engineering Hydrology (ECIV 4323)
WATER- “ The Source of Life”  All the water that will ever be is, right now. -National Geographic  Water has become a highly precious resource. There.
Water Resources State Mission guided by the National Water Mission
Colorado River Compact Administration Program Steve Wolff Colorado River Coordinator Interstate Streams Division Wyoming State Engineer’s Office.
Eduardo Mondlane UniversityInstitute for Water Resource, Rhodes University PhD Proposal-Progress Agostinho Vilanculos Supervisors: - Prof. Denis Hughes.
WATER ISSUES IN THE EASTERN EUROPE:
Subtitle, Date, Presenter Optimizing intensified Runoff from Roads for Supplemental Irrigation, Tigray Region,Ethiopia March,13/ 2014 By:Meseret Dawit.
FNR 402 – Forest Watershed Management
The Application of a Real-Time Operational Water Resources Decision Support System (DSS) for the Orange-Fish-Sundays Water Transfer Scheme 18 th October.
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
National Policy Dialogue in Ukraine on Integrated Water Resources Management First meeting of the Steering Group (Kiev, 25 April 2008)‏ Nataliia Zakorchevna.
Hydrological Monitoring– Status June 2012 Mikaela Kruskopf, TBIWRDP WME, BoARD.
Deksyos Tarekegn National DSS Specialist - Ethiopia
RAVINDRA THOSAR RATE AGREEMENT TEAM.  Floods and drought have become a recurring problem in India and the project is aimed at improving the situation.
WATER SECURITY PLAN FOR ENSURING SUSTAINABILITY OF SOURCES – INSTITUTIONAL ROLES AND RESPONSIBILITIES JALANIDHI.
Luxor, Egypt, April 2013 Utilization of ICT for Enhanced Water Resources Management &Monitoring Networks at MWRI Ayman Ibrahim, General Director.
Flood Risk Management in Hat Yai, Thailand
WUP-FIN training, 3-4 May, 2005, Bangkok Hydrological modelling of the Nam Songkhram watershed.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Diversion of Flood Water from Ganga at Kanpur.  Introduction  Study Area  Flow Pattern of Ganga at Kanpur  Quantification of Divertible Flood  Downstream.
DONG DONG-A UNIVERSITY Historical Flood in in. 2 DONG-A UNIVERSITY Online Collaboration Web Platform Web Platform was used as part of the communication.
Engineering Hydrology (ECIV 4323)
HYDROLOGY PROJECT I HYDROLOGY PROJECT II HYDROLOGY PROJECT Project Period 1996 to 2004 Total Outlay 12.5 Crores Project Period 2006 June to May 2014 Total.
Multiple Purpose Dam & Reservoir
Urban Flood Risk Management in a Changing Climate : Sustainable and Adaptation Challenges August, , 2009 Urban Flood Risk Management in a Changing.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
National Hydrology Project The Way Forward Dr. Amit Prasad 15 th September, 2015, New Delhi.
19 June 2003, Athens, Greece INTEGRATED MANAGEMENT THE RIVER BASIN PERSPECTIVE The Jucar River Basin - First results Teodoro Estrela Júcar PRB Coordinator.
LOCATION OF THE DAM ON KOSI RIVER USING GIS TECHNIQUES By Anil Kumar Hemant Singh Himanshu kashyap.
On 20 th & 21 st Nov, 2015 at Hyderabad SLNA, KERALA.
NID Data Model based on HUC CE394K.3 Term Project by Seungwon Won December 7, 2000.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Water Management Options Analysis Sonoma Valley Model Results Sonoma Valley Technical Work Group October 8, /08/2007.
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
DIRECT RUNOFF HYDROGRAPH FOR UNGAUGED BASINS USING A CELL BASED MODEL P. B. Hunukumbura & S. B. Weerakoon Department of Civil Engineering, University of.
Hydrology and application of the RIBASIM model SYMP: Su Yönetimi Modelleme Platformu RBE River Basin Explorer: A modeling tool for river basin planning.
Modeling with WEAP University of Utah Hydroinformatics - Fall 2015.
Sanitary Engineering Lecture 4
Institutionalizing People’s Participation in Water Planning and Management M. Dinesh Kumar Presentation in the Brainstorming Session for the 4 th India.
WATER RESOURCES DEPARTMENT
AIRPORT SURVEYS.
Water Availability 1996 Texas drought –Governor Bush asks “how much water do we have? How much are we using? How much do we need?” -- Ooops. No good answers!
National Hydrology Project Dr
GOVERNMENT OF TELANGANA Irrigation & CAD Department
National Hydrology Project
Visit for more Learning Resources
DROUGHT AND FLOOD Prepared by M. U. Kale Assistant professor Deptt
Dams in Jordan, a fresh resource to think about!
National Hydrology Project
Integrated Water Resources Planning for optimal benefits to the society Panel Discussion-3 India Water Week 2017.
Engineering Hydrology (ECIV 4323)
Modeling tools Training Module
Hydrology CIVL341.
Hydrology CIVL341 Introduction
Preciptation.
CLIMATE CHANGE IMPACTS ON THE WATER RESOURCES OF GHANA
Hydrology CIVL341 Introduction
Engineering Hydrology (ECIV 4323)
Hydrology CIVL341 Introduction
Engineering Hydrology (ECIV 4323)
Presentation transcript:

DSS applications for Water Resources Management in Kerala state 17 Jan 2015 Water Informatics Session India Water Week New Delhi

Model of Bharathapuzha River Basin in DSS Software Hydrological parameters (including groundwater parameters in accordance with the latest GEC) in the basin was fine tuned using NAM & Mike Basin

Benefits from DSS More than 20 applications were developed using DSS tools, which assisted the Higher authorities to make informed decisions in the water resources sector Improvements in the quality of hydrological data. The DSS tools were used to validate the discharge and reservoir data and errors in data acquisition procedures were identified. Trainings on DSS at the state was attended by Hydrology Engineers and presently around 25 engineers can handle the DSS tools The Server installed under DSS can be accessed by the users of the data and has enabled the integration of Ground water and Surface water data. Government had decided to apply DSS to all River basins of Kerala for improved water resources planning.

New technological practices in water resources sector adopted by the team for the development of applications during the DSS periods The Rainfall-Runoff modeling tool NAM was used to obtain runoff of un- gauged stations, to ascertain water availability at select locations in river, to extend the available time series etc. MIKE Basin was used to model the allocation of available water to different users, to model reservoir operation, to determine the optimum reservoir capacity by varying the dam height etc. The Digital Elevation Models were used to trace the river, to delineate catchments for selected river locations, to prepare contour lines, to find depression in terrain for developing into a reservoir, to find reservoir volume, to find area of submergence etc. Proficiency in GIS software. The major & minor rivers of Kerala were digitized during HP I. Preparation of 3D maps. The use of GPS was improved by loading custom made shape-files to transfer locations of proposed dams and inundation area to ground at site.

Application I - Kuriarkuty Karapara Irrigation Project THE PROJECT The aim of the project was to provide water to the rain shadow regions of Kanjikode & Kozhinjapara area in Palakkad district HISTORY The project was conceived 3 decades ago but did not materialize due to submergence of forest area & Uneconomical hydroelectric power potential The project was analysed using the DSS tools and an alternative proposal was made without forest submergence and also an increased peak hour power

As per the DSS proposal, locations and height of the dams were changed Reservoir was shifted to non forest area. Approx. Cost of the project would be 1500 Crores Benefits Water availability at rain shadow region increases by 90Mm3 during summer. Peak hour production of power of 200 MW. Only diversions dams and No forest submergence Savings of huge preliminary investigation cost and man hours The Government is convinced about the new proposal and as per order No. IDRB/ISW/AD1/433/2012 dated 15.12.14 a technical committee has been constituted to conduct further detailed investigation for the preparation of DPR

Application II - Artificial Recharge Viability Analysis Total ground water recharge from all the structures – 1.919 MCM/Year A project proposal amounting to 7.5 crores was submitted to the Government and the scheme is expected to be included in the State Budget for the year 2015-16

Application III - Managing Drinking water supply to Trivandrum city The monsoon of 2012 was very weak and the reservoir level of Peppara dam which supplies drinking water to Trivandrum city was alarmingly low by the end of south west monsoon period in September 2012. The problem was analysed with DSS tools and DSS team was able to provide suggestions on optimal reservoir operation like curtailing the power production, which was implemented and uninterrupted drinking water supply was ensured. Moreover the viability of construction of 3 check dams proposed at a cost of 15 crores was analysed using DSS tools and was found to be ineffective and hence dropped.

Application IV - Alternate source for drinking water to Kollam City The drinking water supply of Kollam city is from Sasthankotta fresh water lake, which has only 12 km2 of catchment area. During the drought of 2012-13, the lake started drying up and reached the lowest recorded level. An alternate source (Kotakayal lake with catchment area of 160 Km2) was proposed by the DSS team. On analysis it was found that this saline lake could be converted to fresh water lake by constructing a 50 m bund at the exit in down stream direction thereby preventing the saline water intrusion. The fresh water availability on construction of bund was analysed with DSS tools and yielded fruitful results.

Application IV - Augmenting drinking water supply to Trivandrum The drought of 2012-13 called for the revival of Vamanapuram Irrigation Project, which was once abandoned because it could cause forest submergence and also there was opposition from the local people. The revival of the project will improve the drinking water availability of Trivandrum city and irrigation requirement of Vamanapuram Basin. DSS team made an alternate proposal of construction of two small dams to divert water from Vamanapuram basin with minor reservoir to existing Peppara reservoir. The proposal was analysed using DSS tools and the integrated operation of 3 reservoirs were modeled in DSS software and was found feasible.

Application V - Analysis of river linking The Meenachil River dries up during the dry weather causing water scarcity in the Kottayam city and other towns on its bank. The adjacent Muvattupuzha River is having steady flow through out the year, being in the downstream of large hydroelectric scheme at Idukki. The possibility of diverting some of the tail water from Muvattupuzha to Meenachil was analysed in Mike Basin.

Other Important DSS applications 1. Conjunctive Use The acute water shortage at the tail end of Chittur irrigation project ayacut area was analysed and a plan for conjunctive use of ground water and canal water was proposed . 2. Check dam locations in Bharathapuzha, Chalakkudy, Meenachil and Pambar Basins The check dam locations were identified in the 4rd and 5th order streams and in the main rivers to improve the ground water recharge and to improve the dry weather flow in the main river. The locations were identified using ASTER DEM and Google earth. Field verification was done by the field officers for ascertaining the suitability of sites. The recharge values were calculated from DSS software. 3. Water Quality module The pilot basin Bharathapuzha, does not pose much water quality issues, but the application was developed to explore the capabilities of DSS Water quality tool in other River basins. The BOD parameters were taken up for studies and the data of WQ stations of CWC were used.

Water yield of the basin Integrated Reservoir Data 4. Irrigation module An attempt application on Irrigation module was carried out for Chittur area in Bharathapuzha basin. The application was successfully run for a canal network. 5. Water yield of the basin The water availability of the Bharthapuzha basin was computed as part of the preparation of Water Atlas for the state. Simulated discharge of the sub basins for the last 30 years had been obtained from the available rainfall data and was tabulated. The water availability for various Lift irrigation schemes were also analyzed. 6. Integrated Reservoir Data Simulated data of seven reservoirs in the Basin was integrated using DSS (P) Software spread sheet module. Inflow, Water level, Demands etc. can be viewed and exported to MS Excel. This will help Officers involved in Reservoir planning to take decisions on Water allocation.

Study on transfer from Silent Valley to Malampuzha reservoir 7. Study on transfer from Silent Valley to Malampuzha reservoir Feasibility of water transfer from abandoned silent valley project was taken up using DSS tools. 8. Flood mitigation studies- Kuttanad Flooding studies were conducted using DSS tools in Kuttanad wetland area where 5 major rivers empty to Vembanad lake. Alternate diversion channel to sea without entering the area were identified and reported. 9. Flood mitigation studies- Thampanoor, Trivandrum Thampanoor at the heart of the Trivandrum city experiences frequent flooding. The problem was analyzed with DSS tools to ascertain the quantity of flood water and time of concentration to propose diversionary Channel. 10. Viability analysis of Dams at Murinjapuzha, Pattissery… Proposal of a storage dam in Manimala river by a local expert was reported in the newspapers. The area was surveyed with Digital Elevation Models and operation of reservoir was modeled in DSS. The terrain is steep in nature and hence the reservoir storage for even high dam is low. The proposal was dropped after the DSS analysis.

11. 12. 13. 14. Hydro-electric potential of Pazhukkakanam dam site A hilltop with 4.5km2 catchment area in Meenachil Basin was having a waterfall of 200m in the rainy season. There was a proposal to install a mini hydropower station for taping the power potential. Hydropower module of the DSS software was used to model the Power availability. The proposal was uneconomical as per DSS analysis and hence dropped. 12. Leachate intrusion study of Vilappilsala solid waste disposal site The solid waste disposal site of the Trivandrum city was polluting the nearby Karamana river and the City Corporation wanted solution to mitigate it. The area was studied for ascertaining the ground water & surface water flow and remedial measures were suggested 13. Data rectification using DSS tools The rainfall runoff model - NAM was used to model catchment areas of the gauging stations to verify the observed discharge. The simulated discharge from NAM using measured rainfall was used to validate the data collected by the field stations. Some discrepancies were identified in the collected data and the data acquisition procedures were changed. 14. Developing IWRM for Basin The Integrated Water Resources Management were introduced in the Basin report prepared by the Hydrology wing. The role of various stake holders of the basin was redefined and a comprehensive study of Shiriya basin was undertaken.

Thank You