Mine Warfare C4ISR 25 July ‘01. Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose –

Slides:



Advertisements
Similar presentations
UJTL Ontology Effort TMCM Nelson And Marti Hall. Overview Vision for the UJTL and METLs Scenario Mapping Findings Proposed POA&M outline.
Advertisements

© GEO Secretariat Agenda Item 3. GEO UPDATE. © GEO Secretariat Membership 67 members and 43 Participating Organisations – New Members:Latvia, Moldova,
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
NATO UNCLASSIFIED NIAG/SG-76: C2 Interoperability Slide 1HWP May 03 Battlespace Objects Hans Polzer 19 May 2003.
13 th Command & Control Research & Technology Symposium Bellevue WA June, 2008 Briefing Managing the Life Cycle of Net- Centric Architectures This document.
The Open Group Architecture Framework (TOGAF) Version 7.
© 2005 by Prentice Hall Appendix 2 Automated Tools for Systems Development Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
DoD Architecture Framework Overview
Systems Engineering in a System of Systems Context
1 COPC Shared-Network Infrastructure Brief Prepared for: COPC Working Group for Cooperative Support and Backup (WG/CSAB) October 21 and 22, 2008 Meetings.
CYBERSAFE Overview AFCEA C4ISR Symposium 28 April 2015
IT Strategic Planning Project – Hamilton Campus FY2005.
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Lecture 13 Revision IMS Systems Analysis and Design.
UNCLASSIFIED 1 Presented by: Dr. Richard A. Russel SCNC Chief Architect Northrop Grumman Mission Systems ISCN Top Down and Bottom.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
Technical Integrity Assurance For Product Development W. Henson Graves Lockheed Martin Aeronautics Company Russ Campbell.
Copyright Course Technology 1999
9/11/ SUPPORT THE WARFIGHTER DoD CIO 1 Sample Template Community of Interest (COI) Steering Committee Kick-off Date: POC: V1.0.
Agenda Teams Responsibilities Timeline Homework and next steps.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
NIST Special Publication Revision 1
High Level Architecture Overview and Rules Thanks to: Dr. Judith Dahmann, and others from: Defense Modeling and Simulation Office phone: (703)
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Adoption of Commercial EDI Standards for DoD Logistics Business Transactions Integrated Product Team (EDI IPT) – Expanded DEFENSE LOGISTICS AGENCY Report.
Mine Warfare Databases RDML Thomas J. Wilson, III Oceanographer of the Navy.
Chapter 9 Moving to Design
DEVELOPMENTAL TEST & EVALUATION DT&E – From Concept to Combat Integrated Test Process Darlene Mosser-Kerner Developmental Test & Evaluation OUSD(AT&L)/Systems.
Navy Warfare Development Command
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
DCIPS Implementation Project Plan Update Army G2 Intelligence Personnel Management Office (IPMO) April 6, 2009.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
Enterprise Architecture [Product Name] [Enterprise Architect] [Discipline and Names] To-Be Powerpoint Presentation v
Current and Future Applications of the Generic Statistical Business Process Model at Statistics Canada Laurie Reedman and Claude Julien May 5, 2010.
Sea Mine Warfare: An Assessment Update July 2001 RDML M. A. Sharp, Program Executive Officer.
The Fleet Engagement Strategy: Introduction of Organic MCM MGen Bill Whitlow.
Draft GEO Framework, Chapter 6 “Architecture” Architecture Subgroup / Group on Earth Observations Presented by Ivan DeLoatch (US) Subgroup Co-Chair Earth.
Software Product Line Material based on slides and chapter by Linda M. Northrop, SEI.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
1 Interim Implementation Guidance for Net- Centric Data Strategy in the C2 Capability Portfolio COL Carl Porter OASD NII/DoD CIO C2 Programs and Policy.
Commander Mine Warfare Command May 6, 2003 ISSUES.
CNA Mainstreaming mine warfare: Fleet initiatives 26 July 2001 MINWARA conference CNA Sabrina R. Edlow CNA.
Contract Year 1 Review IMT Tilt Thompkins MOS - NCSA 15 May 2002.
Mine Warfare - A Total Force Approach for the Future
Shared Operational Context: A Needed Transformation
JNTC Joint Management Office
BEA Orientation November 13, 2007
LOG 101 Curriculum Review 28 Jun 02 Richard A. Andrews, CPL Course Manager.
LOG204 (DL) Configuration Management Bruce Hatlem Logistics Functional IPT June 26, 2007.
Next VVSG Training Security: Testing Requirements October 15-17, 2007 Nelson Hastings Alicia Clay Jones National Institute of Standards and Technology.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
Discussion Topics for Exploring OMG UPDM Way-ahead
Appendix 2 Automated Tools for Systems Development
Oct 22 Group Leaders Planning meeting
Physical Data Model – step-by-step instructions and template
DARS Update DoDAF 2.0 Plenary Tool Vendor Session 22 July 2008.
NDIA Architecture Analysis for System-of-System (SoS) Interoperability Assessment Karen L. Lauro, Ph.D Oct 21, 2003.
POC Procedures Working Group (POC-pWG)
DoD EA Dip Cse - NV2 Diagram
Agenda All-Monday 15 Sep 0800 Welcome - Opening remarks
Strategic Enrolment Management Planning OVERVIEW
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Strategy Framework Directive (MSFD)
DoD Architecture Framework Overview
Marine Strategy Framework Directive (MSFD)
Systems Architecture & Design Lecture 3 Architecture Frameworks
Agenda Purpose for Project Goals & Objectives Project Process & Status Common Themes Outcomes & Deliverables Next steps.
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
CHAPTER 14 SETTING A DIRECTION FOR INFORMATION RESOURCES
Presentation transcript:

Mine Warfare C4ISR 25 July ‘01

Outline “TRANSFORMATION” M/MHC C4I Modernization Architecture for C4ISR in a Mine Environment – Background – Purpose – Products – POA&Ms, short and long term – Related Efforts

C4I Ship Modernization (IT-21) and D-30 Process IT-21 install for MCM includes: –ADNS (Automated Digital Network System) –CFCP (COTS Fleet Communications Package) –GCCS-M (NT) –INMARSAT B HSD MCM Schedule: –8 MCMs by ‘01 (2 Japan, 2 Bahrain, 4 CONUS) –4 MCMs in ‘02 per D-30 process –2 MCMs in ‘03 per D-30 process

C4I Modernization (IT-21) and D-30 Process IT-21 install for MHC includes: –ADNS “F” Variant (smaller, less expensive) –CFCP –GCCS-M (NT) –INMARSAT B HSD MHC Schedule: –10 of 12 MHCs get INMARSAT B HSD in ‘01 –Other components begin in ‘02 subject to CLF prioritization/funding –CMWC position supports D-30 process

Architecture for C4ISR in a Mine Environment

Architecture Background Numerous MIW C4I-related Initiatives and Programs: – D-30 Process and C4I Modernization (IT-21) – MCM/MHC LAN IPT – MIW Network Centric IPT – ICWS/GCCS-M Integration – GCCS-M/MEDAL Interface Issues – Organic MIW System C4I Integration – Others

Architecture Background MIW C4ISR Master Plan, SEP 97 – Information needs updating ICWS IT-21 installs for MCM/MHC Siprnet MEDAL MCM/MHC LAN – Does not adequately address organic systems – “Top 10” requirements list out of date – SPAWAR no longer uses “Master Plan” format

Architecture Background Architecture for C4ISR in a Mine Environment –DoD Architecture Framework Version 2.0, DEC ‘97 Establishes requirements for DoD C4ISR architectures DASN RDA CHENG using as master reference for C4ISR –CSS tasked to complete MIW C4ISR Architecture IAW Framework document in FY01 Includes “Essential” products required for an Architecture “Supporting” products will follow as necessary –MIW Network Centric IPT PMS 490 and N752 Co-Chair Evolved into “Architecture working group”

Architecture Background MIW Architecture Working Group Core Group: Requirements: N752, N62, CMWC, NAVOCEANO Systems: PEO MUW (490/210), PEO A, SPAWAR 051 Fleet: UMCM, SMCM, AMCM IPT reps, OMCM IPT rep Other Participants: DASN MUW PEO MUW - EOD, 403, 411 SPAWAR - 04F, 155, 157, 158, 182 CNO - 096, N2, N76, N77 SWDG ONR, NAWC AD, NAVAIR, JHU/APL, ARL/UT

Purpose of the Architecture Focused, Fleet-based reference for C4ISR systems requirements –exposes shortfalls in C4ISR –drives acquisition resource priorities –driven by (common) TACTICS Basis for C4I Support Plans, required for all Operational Rqmts Documents (ORDs) Master reference for: –systems integration requirements –interoperability in combined/joint environment Forcing function for integration of CVBG/ARG and supporting MCM assets

Architecture “Essential” Products “All” Views –AV-1: Overview and Summary Information –AV-2: Integrated Dictionary “Operational” Views –OV-1: High-Level Operational Concept Graphic –OV-2: Operational Node Connectivity Description –OV-3: Information Exchange Requirements “Systems” Views : –SV-1: Systems Interface Descriptions “Technical” Views : –TV-1: Data/Systems Implementation Standards

Architecture Context Includes dedicated and organic MIW systems expected to be in the fleet in ‘05 - ‘07 Addresses three operational MIW environments: –Peacetime: Battlespace Preparation –SLOC Scenario (MCM and Mining) –Amphibious Landing Scenario (MCM and Mining)

“OV-1” for Peacetime Battlespace Preparation Side Scan Sonar Side Scan Sonar Amana Minelike Contacts

“OV-1” for Amphibious Assault Scenario

OV-3 Information Exchange Requirements Sample

Do we have the systems to do this? OV-3 Information Exchange Requirements

Architecture for C4ISR in a Mine Environment Info Exchange Requirements AV-1 AV-2 OV-1 OV-2 TV-1 SV-1 OV-3 Organic MIW C4I Interface ICWS/ GCCS-M Interface MEDAL MCM/MHC LAN IT-21 Systems Others... FLEET INPUT

C4ISR Short Term POA & M ‘01 FEB: Distribute MIW C4ISR Master Plan & Draft Architecture Document MAR: Next NCW IPT meeting –2-day “chop” session on Draft Architecture –Determine & Formalize SPAWAR role in MIW C4ISR  MAR: Send Draft to Fleet (MCMRONs, Organic Team) APR: Interim IPT meeting MAY: Next NCW IPT meeting –Final “DC” Chop on Architecture –Long Term POA&M JUN: Send Draft to Fleet (MCMRONs, Organic Team) JUL/AUG: Architecture Briefs to the Fleet SEP: Prepare Fleet-generated POM 04 C4ISR Issue Papers

Initial brief to senior fleet –Background: Requirement for Architecture –Our (top down) process and the shortfalls exposed in Version 1 –Our connection to Fleet Engagement Strategy and Mainsteaming Mine Warfare –Long Term Plan for Architecture Connect top down to bottom up in IERs C4I Support Plan POM-04 Issue paper reviews Take aways: – Reconciled POM-04 Issues – MIWC “Turnover Package” elements – Fleet Architecture POC’s Architecture Briefs to Fleet

MIWC “Turnover Package” Elements that make up the MIWC’s continuous SA –Battlespace preparation Priorities/Tasking for Environmental Data Collection - Q-routes and CVOAs Threat (Mines and Tactics) –Offensive MCM plan (C5F Countermining CONOPs ‘98) Targeting priorities I & W ROE –Status of MCM assets (dedicated & organic) IDTC inputs –MIW-related training requirements –Pre-deployment mine scenarios (JTFEX, BG/ARG IT)

Next Step when Architecture is “Done” MIW C4I Support Plan -C4ISP already a CJCS requirement for individual systems -SPAWAR (051) C4ISP experts available to draft & maintain -Can tailor C4ISP to include useful parts of ‘97 Master Plan - Prioritized C4ISR shortfalls - Tables and figures Establish MIDIS

MIW Information Exchange Requirements Definition Information System (MIDIS) Access Database that stores C4ISR info as a “dynamic” representation of OV-3 Single location for information about activities, information exchange mechanisms and shortfalls Long term: Repository for actual data collected during ops/exercises in order to establish OV-3 that continuously reflects reality

C4ISR Long Term POA & M OCT ‘01: POM-04 C4ISR inputs ‘02: MIW C4I Support Plan Begin adding ASW Considerations ‘03 - ’07: Update Architecture and C4ISP regularly (periodicity TBD) to: - Stay ahead of OMCM systems introduction - Incorporate technology upgrades - Identify shortfalls

Related Efforts CVBG/ARG MIW CONOPS, CLF/CPF End-to-End OMCM Assessment, PEO MUW Mine Warfare Fleet Engagement Strategy, N752 Mainstreaming Mine Warfare, N752 Common Undersea Picture (CUP), ASTO/N74/PEO MUW Horizontal Integration, SPAWAR 051 Naval Integrated Information Network IPT, SPAWAR 051/NAVSEA 05J