11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment.

Slides:



Advertisements
Similar presentations
CAP/POCT 2003 Carol Riley-Hunte, RRT Senior Education Specialist Bayer HealthCare.
Advertisements

MnDOT 2007 Pilots n Mixture Sampling Modification –Increase randomness of sampling. »Sample is split in the field and stored in containers labeled with.
Construction Materials
Materials Presentation March 7, New Materials folder located in Pantry 2013 under the Region Specific Folder QMP Detail Sheet QMP Example 155 MIT.
DIVISION 5 SUBCOMMITTEE OCT 2014 Update. The Washington Chapter is one of 67 local chapters in the US and Canada which make up the American Public Works.
Joe White (608) Wayne Chase (608) WisDOT Materials Management Section 1.
Asphalt Specification Changes July 2005 Contractor Asphalt Training Rich Hewitt, PE District Bituminous Engineer District Five Materials & Research.
Our Vision – Healthier Kansans living in safe and sustainable environments.
Materials Information Tracking System / Producer Lab Analysis and Information Detail (MITS/PLAID) David A. Kaulfers, P.E., PMP Assistant State Materials.
MICHIGAN RIDES ON US 2015 Local Roads Workshop Gaylord March 12, 2015.
1 Quality Control Program. 2 Objectives To know: To know: –How the QC Program is Doing –Effect of Specification Changes on the QC Program –Contractor.
1 Asphalt Quality Assurance Program & Construction Inspection 2015 Asphalt Regional Seminars Rob Crandol, P.E. VDOT – Materials Division Assistant State.
Recordkeeping & Accounting
1 Overview CQC Asphalt Specifications.  Payment based on Contractor’s Quality Control tests.  FDOT runs verification tests at a lesser frequency. 
Asphalt Quality Assurance Program
2002 FDOT/FTBA Construction Conference
03-0F2204 Sly Park Road UC (Replace) Prebid Outreach Meeting: CIP Structural Concrete Materials Specification Overview John Yang, P.E. Office of Structural.
 Quality Management Program (QMP) Review  HTCP Program  IRI News.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
QUALITY CONTROL QUALITY ASSURANCE INDEPENDENT ASSURANCE
1 8/29/2015WisDOT BTS MMS.  MIT – Materials Information Tracking (Field Version) Used by WisDOT/Consultant/& Municipal staff in the field to enter a.
WELCOME TO TRAINING PROGRAMME FOR CONSULTANTS’ SERVICES FOR 3 rd PARTY QUALITY CONTROL AND QUALITY ASSURANCE G. PRABHAKAR.
Florida Department of Transportation 1 Overview of CQC Asphalt Specifications.
WisDOT use of FieldManager ® Suite David Castleberg, PE Wisconsin Department of Transportation Bureau of Project Development Field Management TAG, October.
Overview of the New Hot Mix Specifications Dale A. Rand, P.E. TxDOT Construction Division Flexible Pavements Branch TRB AFK10 Committee Meeting April 20-21,
Developing a Mixture-Based Specification for Flexible Base.
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
FieldManager ® Contractor Read-Only David Castleberg, PE Wisconsin Department of Transportation Bureau of Project Development Contractor/Engineer Conf.,
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Railway Transport Equipment (RTE) Certification Railway Transport Equipment Certification Procedure Application for railway transport equipment certification.
WisDOT Bureau of Technical Sevices Spring 2014 QMP Training Base Compaction SPV’s and Project Design Guidance.
Allen Hughes State Materials Office
 Have an approved mix design before paving.  The department has eliminated the use of PG -22 Asphaltic Material and replaced it with PG -28.  Tack.
2014 NCR Construction Conference Materials Presentation John Brophy Jeff Michalski
 Documentation Requirement  All records should contain sufficient detail to sustain an audit and be clear enough to be read and understood by persons.
OH 5-1 Agenda Chapter 8 – Purchasing Follow-Up Tour of receiving area Physical Receiving Inventory Book Set-Up Unit of Measures Worksheet Project: Standardized.
Materials Coordinators’ Training. Prefix 155 QMP Summary Report, Preparation Guide.
WSDOT Design Build Contracting – an innovative partnership Society of American Military Engineers September 16, 2014 Phil Fordyce, P.E. WSDOT.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
BOS – Structures Maintenance Fabrication Initiative Richard Marz, PE Chief, Structures Maintenance WisDOT – Bureau of Structures.
1. 2  QMP Summary Templates in 2015 Pantry. QC Tester Names included on QMP Summary Reports (155). Quantities need to be included on QMP Summary Reports.
By Terry Treutel Ride Quality Consultant Former WisDOT Ride Spec Coordinator.
Materials. New for 2014  MITSCAN for concrete pavement thickness acceptance  QMP Density for Base  Lean Government Timeline  WDMP HTCP Training 
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
Contractor QC Wesley Glass Kentucky Transportation Cabinet 2007 KAHC/KYTC Meeting Bowling Green/Lexington, Kentucky.
Midwest Geotechnical Conference Indianapolis, Indiana September 22, 2015 Bob Arndorfer.
Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.
Materials Acceptance at VTrans 2016 Contractors Workshop Presented by: Mladen Gagulic, Materials & Certifications Manager Brigitte Codling, Materials Acceptance.
Project Materials Usage and Concerns. Project Materials and Acceptance QC/QA Specifications QC/QA Specifications Quality Control Plans Quality Control.
Best Practices Guide DRAFT Soliciting Comments for 30 Days As lab testing moves forward –Changes in limits may be fine tuned As field work moves forward.
Role & Responsibility for Quality Assurance What is your opinion on this topic heading? Role and Responsibility of: Role and Responsibility of….(Er.) for.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Asphalt Pavement Training Conference “HMA Mix Designs on the QPL”
THURSDAY TARGETED TRAINING: Reporting Regulations and Requirements
Maturity Method Strength Tests As Good As Concrete Cylinders
Independent Contractor Process New and Improved
DTF CONSTRUCTION MONITORING
Acceptance Process for Manufactured Products by Certification:
Construction Management
Chip Seal Quality Assurance Guide
QC Personnel Responsibilities
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
High Value Research Sweet 16 – RAC Region 3
Emulsion Task Force Meeting
Quality Assurance for Emulsified Asphalt Surface Treatments
Prime Factors for Successful Preservation Treatments
Independent Contractor Process New and Improved
Role and Responsibility for Quality Assurance Vishnu P. Shrestha
Fiber Reinforced Polymer Systems
Presentation transcript:

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 1 QMP Specifications QMP base aggregate QMP base aggregate Review and comment on QC plan Review and comment on QC plan Establish and agree on posting/distribution of control charts Establish and agree on posting/distribution of control charts Review control charts and test results daily Review control charts and test results daily Review production tests records Review production tests records

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 2 QMP Specifications QMP base aggregate QMP base aggregate Placement- verify qualified labs and personnel are doing sampling and testing Placement- verify qualified labs and personnel are doing sampling and testing Verify QC placement samples randomly sampled at proper frequency Verify QC placement samples randomly sampled at proper frequency Monitor corrective actions and discuss with contractor as needed Monitor corrective actions and discuss with contractor as needed Sample, test and evaluate verification(QV) samples per defined frequencies Sample, test and evaluate verification(QV) samples per defined frequencies

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 3 QMP Specifications QMP concrete pavement QMP concrete pavement Review and comment on QC plan Review and comment on QC plan Review, comment, sign, and date mix designs Review, comment, sign, and date mix designs Establish and agree on posting/distribution of control charts Establish and agree on posting/distribution of control charts Review control charts and test results daily Review control charts and test results daily Review MRS for timely and correct information (approve quantities and payment) Review MRS for timely and correct information (approve quantities and payment)

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 4 QMP Specifications QMP concrete pavement - cylinders QMP concrete pavement - cylinders QC – contractor 1 set of 3 per each sublot- reports on MRS QC – contractor 1 set of 3 per each sublot- reports on MRS CC- companion cylinders-contractor casts 1 set of 3 per lot CC- companion cylinders-contractor casts 1 set of 3 per lot oDept. takes custody no more than 72 hrs after fabrication oDeliver to lab for cure and testing immediately(same day) oCCs and cylinder cards labeled with lot and sublot- this corresponds to the matching QC lot and sublot oCompare CC results with matching QC set. Best to do this early and not wait until the project is complete

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 5 QMP Specifications QMP concrete pavement - cylinders QMP concrete pavement - cylinders CC- companion cylinders CC- companion cylinders oIf companion cylinders strength results differ by more than 10 % from the matching QC set immediately notify your regional materials unit oThe 10 % is based on comparing the average strength of each set against the average of the QC and CC set of cylinders oIf differences greater than 10 % are found than investigation is needed- contact your region IA specialist

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 6 QMP Specifications QMP concrete pavement - cylinders QMP concrete pavement - cylinders QV- verification cylinders- QV- verification cylinders- oDepartment casts- 1 set of 3 per lot oIndependent sample from QC oResponsible for fabrication, field cure, lab cure, testing and reporting oIdentify and label lot and sublot

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 7 QMP Specifications QMP concrete structures QMP concrete structures Review and comment on QC plan Review and comment on QC plan Review, comment, sign, and date mix designs Review, comment, sign, and date mix designs Establish and agree on posting/distribution of control charts Establish and agree on posting/distribution of control charts Review control charts and test results daily Review control charts and test results daily Review MRS for timely and correct information(approve quantities and payment) Review MRS for timely and correct information(approve quantities and payment)

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 8 QMP Specifications QMP concrete structures- cylinders QMP concrete structures- cylinders QV- verification cylinders- QV- verification cylinders- oDepartment casts- 1 set of 3 per lot oIndependent sample from QC oResponsible for fabrication, field cure, lab cure, testing and reporting oIdentify and label lot and sublot

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 9 QMP Specifications QMP concrete structures - cylinders QMP concrete structures - cylinders CC- companion cylinders CC- companion cylinders oIf companion cylinders strength results differ by more than 10 % from the matching QC set immediately notify your regional materials unit oThe 10 % is based on comparing the average strength of each set against the average of the QC an CC set of cylinders oIf differences greater than 10 % are found than investigation is needed- contact your region IA specialist

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 10 QMP Specifications QMP concrete structures - cylinders QMP concrete structures - cylinders QV- verification cylinders- QV- verification cylinders- oDepartment casts- 1 set of 3 per lot oIndependent sample from QC oResponsible for fabrication, field cure, lab cure, testing and reporting oIdentify and label lot and sublot

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 11 QMP Specifications QMP concrete ancillary QMP concrete ancillary Contractor QC reports on department worksheet- WS 5013 Contractor QC reports on department worksheet- WS 5013 QC casts 1 set of two cylinders per each 200 CY for each mix and placement method QC casts 1 set of two cylinders per each 200 CY for each mix and placement method Companion cylinders are not required Companion cylinders are not required

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 12 QMP Specifications QMP concrete ancillary QMP concrete ancillary QV-verification-department- one set of two cylinders (28 day) QV-verification-department- one set of two cylinders (28 day) oTest at a frequency of 10 % of QC tests(or once per project) oIndependent sample from QC oResponsible for fabrication, field cure, lab cure, and testing oIdentify and label lot and sublot

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 13 QMP Specifications ws5013

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 14 QMP Specifications QMP HMA QMP HMA Mix design submissions- department reviewed Mix design submissions- department reviewed Periodic observation of contractor sampling and testing (verify qualified lab and personnel) Periodic observation of contractor sampling and testing (verify qualified lab and personnel) Monitor control charts and data postings daily- copies to be submitted to the engineer daily Monitor control charts and data postings daily- copies to be submitted to the engineer daily Monitor corrective actions and discuss with contractor as needed Monitor corrective actions and discuss with contractor as needed

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 15 QMP Specifications QMP HMA QMP HMA Design mixture field verification Design mixture field verification o Independent sample o Frequency based on total quantity for a mix design o Not based on contract quantity o Testing by Region labs only

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 16 QMP Specifications QMP HMA nuclear density QMP HMA nuclear density Approved gauges and qualified testers Approved gauges and qualified testers Approved project reference site Approved project reference site QC and QV gauges correlated QC and QV gauges correlated Test site locations based on mathematically random basis Test site locations based on mathematically random basis QC tests documented on correct WisDOT forms- original data sheets submitted within 24 of lot completion QC tests documented on correct WisDOT forms- original data sheets submitted within 24 of lot completion

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 17 QMP Specifications QMP HMA nuclear density QMP HMA nuclear density QC tests documented on correct WisDOT forms- original data sheets submitted within 24 of lot completion QC tests documented on correct WisDOT forms- original data sheets submitted within 24 of lot completion QV tests- one lot per mix design, 1 lot per 10 5 of contractor lots QV tests- one lot per mix design, 1 lot per 10 5 of contractor lots QV tests reported on MITS/MTS prefix 262 report QV tests reported on MITS/MTS prefix 262 report

11/7/2008 Wisconsin Department of Transportation Bureau of Technical Serviices 18 QMP Specifications QMP documentation QMP documentation Summarize on prefix 155 report Summarize on prefix 155 report Keep on-going excel spreadsheet Keep on-going excel spreadsheet Reference diaries and other QMP documents on a prefix 900 report Reference diaries and other QMP documents on a prefix 900 report Examples of reports Examples of reports