V-1 TFE: The New Heartbeat of Loran T. P. Celano, Timing Solutions Corporation LT Kevin Carroll, Loran Support Unit.

Slides:



Advertisements
Similar presentations
Express5800/ft series servers Product Information Fault-Tolerant General Purpose Servers.
Advertisements

Intelligent Pressure and DMA Management
SYSTEM-WIDE PROCESS CONTROLS UPGRADE Detroit Water & Sewerage Department.
Agenda Super-Cells Multi-Cells
Long RAnge Navigation version C
Multi Functional Digital Fault Recorder
Chapter 19: Network Management Business Data Communications, 5e.
Digital RF Stabilization System Based on MicroTCA Technology - Libera LLRF Robert Černe May 2010, RT10, Lisboa
Transitioning to Time of Transmission Control in the U.S. Loran System ILA 2003 Boulder, CO Mr. Gene Schlechte CAPT Curtis Dubay, P.E. U. S. Coast Guard.
EUT 1040 Lecture 10: Programmable Logic Controllers.
Chapter 19: Network Management Business Data Communications, 4e.
1 ITC242 – Introduction to Data Communications Week 12 Topic 18 Chapter 19 Network Management.
OHT 3.1 Galin, SQA from theory to implementation © Pearson Education Limited 2004 The need for comprehensive software quality requirements Classification.
RF controls for MICE Andrew Moss Sept 06. What we need A flexible easy to use solution to control the amplitude, phase and timing of the MICE RF amplifiers.
 A system consisting of a number of remote terminal units (or RTUs) collecting field data connected back to a master station via a communications system.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Symmetra ® LX – redundant UPS High performance, redundant.
Loran Integrity Performance Panel Integrity Fault Tree for Loran Sherman Lo Second LORIPP Meeting Portland, OR September 23-24, 2002.
Asis AdvancedTCA Class What is a Backplane? A backplane is an electronic circuit board Sometimes called PCB (Printed Circuit Board) containing circuitry.
Applied Transportation Analysis ITS Application SCATS.
V-1 Common-View LORAN-C for Precision Time and Frequency Recovery Tom Celano, Timing Solutions Corp LT Kevin Carroll, USCG Loran Support Unit Michael Lombardi,
3/7/05A. Semenov Batch-by-Batch Intensity Monitor 1 Two-Channel Batch by Batch Intensity Monitor for Main Injector BBI.
4.0 rtos implementation part II
Page 1 ADAM-6000 Web-enabled Smart I/O Γιάννης Στάβαρης Technical Manager Ιούνιος 26, 2007.
Smart transmitters.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
1 Fault Tolerance in the Nonstop Cyclone System By Scott Chan Robert Jardine Presented by Phuc Nguyen.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
CSE 303 – Software Design and Architecture
Software Defined Radio
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
SMART ANTENNA under the guidance of Mr. G.V.Kiran Kumar EC
October 29, 2002 International Loran Association Design and Test of the First Article Accufix 7500 Transmitter Presented by Mark Danieli.
October 28, 2002 International Loran Association Modernization of Nii Jima Transmitter Control Presented by Michael Weisenbloom.
Repeaters and Hubs Repeaters: simplest type of connectivity devices that regenerate a digital signal Operate in Physical layer Cannot improve or correct.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
File Processing - Database Overview MVNC1 DATABASE SYSTEMS Overview.
GPS based time synchronization of PC hardware Antti Gröhn
SNS Integrated Control System SNS Timing Master LA-UR Eric Bjorklund.
Enhanced LORAN Receiver (ELR) Kirk Montgomery – Symmetricom/Advanced Timing Solutions 2007 Convention and Technical Symposium - ILA-36 Orlando, Florida.
October 28, 2002 International Loran Association Development of a Next Generation Transmitter Control System Presented by: Terry YetskoBCO, Inc. George.
Codan 5700 Series C-Band Transceiver Technical Overview.
Manag ing Software Change CIS 376 Bruce R. Maxim UM-Dearborn.
SNS Integrated Control System Timing Clients at SNS DH Thompson Epics Spring 2003.
Software quality factors
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
Loran Integrity Performance Panel The Loran Integrity Performance Panel (LORIPP) The LORIPP Team Loran Team Meeting McLean, VA July 30, 2002.
Vidya Bharathi Institute of Technology
Redundant AFS TKS with Seamless AFS Switch-over Victor S. Reinhardt & Charles B. Sheckells Hughes Space and Communications Company P. O. Box 92919, Los.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Unit 1 Lecture 4.
LORAN Modernization Loran Data Channel Mr. Raymond Agostini International Loran Association Orlando, FL October 15, 2007.
Modernizing Loran Command and Control U.S. Coast Guard Loran Support Unit Pacific Ave. Wildwood, NJ Raymond Agostini James R. Betz International.
Data Collection Effort Objectives Time of Transmission (TOT) monitors Time of Arrival (TOA) monitors Pulse Analysis Measurements re UTC, & sign of delay.
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
Class A, B, and now N NFPA 72, 2016 Edition Dan Horon President
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
9530 T IMING C ONTROL U NIT Features TCU-1 Key Features 250ps timing resolution with < 50ps jitter 8 independent outputs with full individual programming.
Artificial Intelligence In Power System Author Doshi Pratik H.Darakh Bharat P.
Lecture 10: Programmable Logic Controllers
Chapter 19: Network Management
Communications in Railway Centralized Traffic Control Systems
SCADA for Remote Industrial Plant
FAULT TOLERANCE TECHNIQUE USED IN SEAWOLF SUBMARINE
How SCADA Systems Work?.
The advantages of going wireless
Bluetooth Based Smart Sensor Network
PLC’s Are ... Similar to a Microcontroller: Microprocessor Based
Instrumentation and control
EUT 1040 Lecture 10: Programmable Logic Controllers Unrestricted.
Presentation transcript:

V-1 TFE: The New Heartbeat of Loran T. P. Celano, Timing Solutions Corporation LT Kevin Carroll, Loran Support Unit

V-2 Introduction The USCG is leading an effort to modernize the LORAN-C network of transmitting stations in the U.S. Part of the modernization effort is to replace the time and frequency generation system at transmitting LORAN-C stations —Existing hardware is outdated and requires replacement The new design integrates all of the current LORAN-C timer functionality with new timing technology into a single system —New timing component designed to maximize the benefits of co-located cesium standards System is designed to satisfy the current operational requirements as well as accommodate future requirements with minimum modifications System functions aid in meeting the FAA’s RNP 0.3, Coast Guard’s Harbor Entrance and delivering Stratum I timing performance to LORAN timing users

V-3 Existing System

V-4 Existing System The existing time and frequency equipment is a conglomerate of equipment designed and installed over the last 40+ years Each station has a different list of equipment depending of master/secondary and dual/single rated The system is based primarily on hardware technology that is outdated Communication capability differs depending of component —Different hardware architecture forces communication capability to lowest level System does not capitalize on the three cesium clocks for timing accuracy —Cesiums are independently operated No automatic control of cesiums to USNO-UTC

V-5 Existing System Components The current timing and frequency suite is collection of up to 30 separate components. 1960’s Vintage  Emergency Stop  Distributions Amplifiers  Frequency Patch Panel  Signal Alarm Unit  Time Counter  Electronic Pulse Analysis  Cycle Compensation Circuit 1970’s Vintage  Timer Units  Timer Set Control  Alternating Blanking Unit  Remote Control Interface  Communication Adapter  Waveform Panel  SSX IF  LSM IF 1980’s Vintage  Phase Micro-stepper  Time Counter  Multi-programmer 1990’s Vintage  Time of Transmission Patch Panel *  Timer Counter *  GPS Timing Receiver *  Time Reference Generator *  Automatic Blink System * Master Stations only

V-6 New TFE Design

V-7 TFE System Level TFE consists of two redundant signal paths that generate transmitter drive signals with a known relationship to UTC(USNO) —Each redundant half of the system operates independently to control primary frequency standards, generate transmitter drive signals and measure time differences —Single (non-redundant) unit for distributing frequency signals from clocks for diagnostic use

V-8 Local TFE User Interface

V-9 TFE Functional Diagram Loran Signal Generation PCI/TOC Generation LPA implementation Transmitter Drive Signals Diagnostic Outputs Clock Ensemble/UTC Recovery GPS measurements Inter-clock measurements Timescale algorithm Clock steers TD Measurements UTC Recovery TD Loran Recovery TD TOT TD’s Additional Measurements Closed Loop Control Signal Phase Control ABS Signal Phase Control

V-10 Timescale Computation and Clock Steering System utilizes three cesiums to compute a local timescale that is steered to UTC(USNO) via GPS —15 ns (RMS) UTC time recovery performance Kalman filter models clocks and predicts clock performance when measurement data isn’t available —System can flywheel through GPS system outages Three clock timescale provides real-time clock fault monitoring as well as superior stability —System designed to maximize the benefit of three atomic standards at each LORSTA —Timescale reduces to two or one clock if three clocks are not available

V-11 TFE Functional Diagram Loran Signal Generation PCI/TOC Generation LPA implementation Transmitter Drive Signals Diagnostic Outputs Clock Ensemble/UTC Recovery GPS measurements Inter-clock measurements Timescale algorithm Clock steers TD Measurements UTC Recovery TD Loran Recovery TD TOT TD’s Additional Measurements Closed Loop Control Signal Phase Control ABS Signal Phase Control

V-12 LORAN Signal Generation LORAN signal generation is accomplished in programmable firmware in the Loran Integrated Timer and Signals (LITS) chassis —Unit receives 5 MHz from PFS and generates PCI, TOC, LI, and transmitter drive signals for two independent rates »All LORAN signals originate from a single 5 MHz input (all signals are coherent) —Command and control accomplished via RS-232 —ABS control accomplished using direct digital lines All system outputs on rear of chassis —Transmitter drive signals output on multi-pin connector —Copies of all signals for monitoring/diagnostic purposes —Spare connectors for future use

V-13 LORAN Signal Generation (cont’d) Local phase adjustments (LPAs) inserted via a direct digital synthesizer (DDS) that creates a phase change by changing the frequency of the 5 MHz signal over a fixed time interval —5 MHz in, 5 MHz out tunable synthesizer —Control method results in phase changes without discontinuities in transmitted data »Smooth transition reduces transmitter jitter during LPA —LPAs can be completed over settable time period (time interval for frequency change is a settable parameter)

V-14 TFE Functional Diagram Loran Signal Generation PCI/TOC Generation LPA implementation Transmitter Drive Signals Diagnostic Outputs Clock Ensemble/UTC Recovery GPS measurements Inter-clock measurements Timescale algorithm Clock steers TD Measurements UTC Recovery TD Loran Recovery TD TOT TD’s Additional Measurements Closed Loop Control Signal Phase Control ABS Signal Phase Control

V-15 Signal Measurements Six channel, sub-nanosecond event timer used to time tag the rising edge of the signals of interest —PCI, TOC, 1 PPS, RF Gate, RF Pulse (detected pulse from transmitter) —One timer per rate Timer allows computation of the time differences by subtracting time tags from any pair of inputs —Six simultaneous channels is more efficient than standard two- channel time interval counter —For example TOC is compared to 1 PPS to verify timing and also processed with RF Pulse and RF Gate as time of transmission TDs —Unit allows for future time differences of interest to be added to system output

V-16 TFE Functional Diagram Loran Signal Generation PCI/TOC Generation LPA implementation Transmitter Drive Signals Diagnostic Outputs Clock Ensemble/UTC Recovery GPS measurements Inter-clock measurements Timescale algorithm Clock steers TD Measurements UTC Recovery TD Loran Recovery TD TOT TD’s Additional Measurements Closed Loop Control Signal Phase Control ABS Signal Phase Control

V-17 Closed Loop Transmitter Control Automatic Phase Adjustments (APAs) are inserted based on a proportional control loop closed around the transmitter —RF feedback from transmitter drives a detection circuit  TTL pulse produced based on SZC  pulse measured in timer against TOC or RF Gate Loop parameters control system’s response to transmitter delay changes —Time constant: how quickly the system responds to delay changes —Minimum Steer: APA not inserted unless error is large enough —Steer Interval: how often transmitted phase can be adjusted APAs inserted using identical method as LPAs (DDS freq change) APAs can be computed based on UTC or LORAN data —System can function without GPS using casualty receiver

V-18 Closed Loop Transmitter Control Data System deliberately set off target time to show performance of proportional loop

V-19 Closed Loop Transmitter Control Data APAs required occasionally to compensate for timing events

V-20 TFE Functional Diagram Loran Signal Generation PCI/TOC Generation LPA implementation Transmitter Drive Signals Diagnostic Outputs Clock Ensemble/UTC Recovery GPS measurements Inter-clock measurements Timescale algorithm Clock steers TD Measurements UTC Recovery TD Loran Recovery TD TOT TD’s Additional Measurements Closed Loop Control Signal Phase Control ABS Signal Phase Control

V-21 Integrated Automatic Blink System (ABS) ABS is critical for LORAN’s HMI performance for integrity protection —Monitors the transmitted signal for out-of-tolerance conditions through RF feedback —Three selectable patterns for notifying the user System utilizes direct digital lines to allow fast transition to blink —Blink control not affected by comms or OS latency —System transitions to blink in less than one second after problem detection Blink is initiated in hardware based on programmable rule set —Phase of transmitted signal vs local TOC estimate —Phase error in transmitted pulses —Lack of RF return from transmitter —Time step in cesium standard All of the ABS parameters can be adjusted to suit the performance of the transmitter —As future transmitter jitter improves, the tolerances can be set tighter and/or averaging time in the ABS algorithm can be reduced

V-22 Technical Comparison of Systems FunctionLegacyTFE Local Phase Adjustments (LPA) l Minimum 20 ns l Steps—20 ns l Minimum is settable down to 1 ns l Step < 1 ns Cesium Clock Control l Independent clocks l Manual control to UTC l Clock Ensemble l Automatic cesium control to UTC Parameter flexibility l Not easily changed in hardware l Software/Firmware allows easy adjustment Loran Control l No ability to control to Loran received signals l Control to selected Loran station Time of Transmission Capability l Monitoring only l 20 ns (rms) accuracy l Monitoring and Control l <15 ns (rms) accuracy There are significant performance advantages to the new system

V-23 Support Comparison Improved support aspects of the new system provide some of the greatest benefits Support AspectLegacyTFE Configuration Management l Different equipment at —Master vs. Secondary —Dual vs. Single rate l Same configuration regardless of station Preventative Maintenance l 9 hours per quarter30 minutes per quarter Trouble Shooting l Some components have minimal self-diagnosis l Complete system health monitoring at all times. Causality Repair l Each component requires different procedures l Not all modular design l Same procedure for entire system l Modular design facilitates easy repair.

V-24 Future Requirements TFE has been designed with the forethought that LORAN-C will be evolving over next 10 years —Modular design that isolates timing to the one chassis and LORAN signals in LITS chassis Timing chassis consists of independent modular slots that isolate functionality to specific components LITS chassis has been designed using field programmable hardware to facilitate easy modifications —FPGA implementation for signal generation —Microprocessor for external interface and control LITS design also includes empty expansion slot and spare connectors to facilitate addition of future capability to LORAN signal structure System utilizes an IP socket interface that enables remote control —All command, control and status achieved using standard IP interface with ASCII command set

V-25 Conclusions The new LORAN-C transmitter timing system provides a single integrated system to bridge the gap between the cesium standards and the transmitter —Old functions are replaced with higher performance equipment that is more reliable and flexible —Logistics are simplified with respect to Configuration Management, maintenance, and repair New timing architecture provides system flexibility to address future requirements and performance enhancements —System can support a large range of possible architectures including new rates, data transfer capability and higher HMI responsibility