Lahore Electric Supply Company Limited 2 nd Workshop on Power Sector Reforms 11 th & 12 th November | 2010 WAPDA House Auditorium Lahore.

Slides:



Advertisements
Similar presentations
"Financing access to basic utilities for all" December 2006 Ensuring sustainable access for the poor through internal revenue generation – electricity.
Advertisements

Ministry of Electricity and Energy General Authority for Rural Electricity Rural Energy Access Project OFF GRID RURAL ELECTRIFICATION Service Provider.
What we do Larotecs Web2M is an off-the shelf, end-to-end, web-based solution designed to manage multiple widely distributed devices.
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
Implementation of Prepayment System in Mozambique E D M PREPAYMENT SYSTEM.
Eastern Indiana Economic Growth Region 6 Strategic Plan August 2010 Approved Version
Mexico’s initiatives with respect to Renewable Energies World Bank February 2012 Washington D.C. Alejandro Peraza-García Director General of Electricity.
1 INTERNAL CONTROLS A PRACTICAL GUIDE TO HELP ENSURE FINANCIAL INTEGRITY.
Abba A. Ibrahim C.Eng, MIGEM,MNSE, PhD (Commissioner Govt & Consumer Affairs)
Proposed APDRP during 11 th Plan  Continue APDRP during the XI Plan with the revised terms and conditions as a Central Sector Scheme.  The focus of.
Strengthening Public Finance Management Through Computerization of Procurement Management System High Level Forum on Procurement Reforms in Africa Tunisia.
Guido Pier Paolo Bortoni President of Italian Regulatory Authority for Electricity Gas and Water (AEEGSI) UNIVERSAL ENERGY ACCESS A Focus on Universal.
TVA Generates Power and sends it down Transmission Lines to Newport Utilities Distribution Substations TVA Newport Utilities Substations Distributes the.
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
CLICK TO ADD TITLE The 5th Global Health Supply Chain Summit
National Investment in Water and Waste Water Infrastructure, Funding & Pricing Mid-West Regional Authority Annual Conference 2009.
1 PRESIDENTIAL ADDRESS by Shri B K Das Chairperson, OERC
Water Services Trust Fund Social Animators & Field Monitors Training Workshop The Water Services Trust Fund: Functions, Mandate, Urban Window, WSTF Support,
The role of ERE in Costumer Protection Eduard Elezi Albanian Regulatory Authority ERE Conference “Albanian Energy Sector, Challenges and Regulation” Tirana,
1 GEPCO 2 nd WORKSHOP ON POWER SECTOR REFORMS November 11 & 12, 2010.
Cost of Service Indiana Industrial Energy Consumers, Inc. (INDIEC) Indiana Industrial Energy Consumers, Inc. (INDIEC) presented by Nick Phillips Brubaker.
1 United States Agency for International Development (USAID) National Association of Regulatory Utility Commissioners (NARUC) Sponsored.
Power Line Carrier Communication based Automated Meter Reading System
1 Billing, Metering CRM/CIS America 2004 Transition Strategy: Manual Field Data Collection to AMR Implementation Chuck Session Manager, Cinergy Meter Reading.
1 Resurrecting A Load Research Program Susan Romer NSTAR 2006 AEIC Load Research Conference September 2006.
Akshay Prakash Yojana A Voluntary DSM Initiative November 2005 
Energy Management System Industrial Controls & Drives (India) Private Limited Chennai
Samordningsrådet med kunskapsplattform för smarta elnät Smart Grid and Smart Metering - Swedish Experiences Karin Widegren, Director Swedish Coordination.
1 WIND ENRGY STATUS : PAKISTAN ASIAN CLEAN ENERGY FORUM ND ADB Quantum Leap in Wind Conference GOVERNMENT OF PAKISTAN June 20, 2011.
Page No. 1. Page No. 2 PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT KARACHI PRESENTATIONTO PAKISTAN IPO SUMMIT ON 31 ST JANUARY 2014 AT.
Muhammad Afaaq MC MBA(Finance) Finance (FINI-619) Internship report on National Bank of Pakistan.
Ainārs Meņģelsons Public Utilities Commission Latvia 11th Baltic Energy Regional Initiative October 1, 2010 Jūrmala, Latvia ELECTRICITY REGIONAL INITIATIVE.
Introducing Competition in the ESI Naresh Singh Head: Compliance.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
Quarterly Performance Report For the period October – December 2014.
African Regional Director
Secondary legislation on renewable today and tomorrow Nicolae Opris Vicepresident, ANRE ANRE ROMANIAN ENERGY REGULATORY AUTHORITY.
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
Urban water supply The privatization process in Mozambique
1 Belarus CEM Discussions Energy Sector Stable sector structure and governance over the past decade together with recent macro economic performance of.
1. Mirza Hamid Hasan 29 September  Need for Regulation  Historical regulation authority and mechanism  Creation of present regulatory agencies.
11 Prabhakar Tandon Head Business Development Secure Meters Limited Distribution Reform-A different Approach.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
Course 3.6 Regulatory Commissions: Management & Staff Functions, Bangladesh, Mar 31- Apr 4, 2002 SOUTH ASIA REGIONAL INITIATIVE/ENERGY Regulatory Commission.
Purchasing Cards. What is a Purchasing Card? It is a type of commercial credit card, used by organizations for payment of goods and services. This tool.
OFD Fire-Based OFD Fire-Based EMS Transport. OFD Transport Timeline OFD TRANSITION TO FULL ALS & AUTO ACCIDENTS 90 DAY BILLING COLLECTION LAG TIME BEGIN.
MERC (N ET METERING FOR R OOF - TOP S OLAR P HOTO V OLTAIC S YSTEMS ) R EGULATIONS, 2015 Commercial Section.
Smart Grids and Meters Workshop November 2015 بسم الله الرحمن الرحيم Electricity Loss Sudan - Khartoum The Arab Union of Electricity (AUE) The Sudanese.
5 th ERRA Annual Meeting Country News – The Russian Federation Krasnodar Territory Sergei Milovanov Regional Energy Commission – Prices and Tariffs Department.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
RENEWABLE ENERGY REGULATION IN KENYA KENYA-SPAIN MULTILATERAL PARTNERSHIP MEETING HELD AT CROWNE PLAZA Presented by Caroline Kimathi Asst Manager, Licensing.
Renewable energy support schemes in the Republic of Moldova
Treasury of the Republic of Kazakhstan
Luthin Associates Overview
Water Management Initiative (WMI)
Business Briefing Security Service Providers
Danube Water Conference 2017, Vienna
Portugal Cove - St. Philip’s
Electric Power Industry Reform Act (EPIRA)
Danube Water Conference, Vienna, May 2017
CURRENT STATUS - ENERGY TRANSITION
Narragansett Electric Rate Classes
Apua workshop-ABIDJAN, 9 TO 10TH November, 2017
ELECTRICITY AND ENERGY PV METERING/BILLING – NOVEMBER 2017
INGONYAMA TRUST BOARD’S ANNUAL PERFORMANCE PLAN
Operations Management
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
Medium-term estimates
(A unit of Prakash Retail Private Limited)
ACCESS TO SUSTAINABLE ENERGY PROJECT
Presentation transcript:

Lahore Electric Supply Company Limited 2 nd Workshop on Power Sector Reforms 11 th & 12 th November | 2010 WAPDA House Auditorium Lahore

Lahore Electric Supply Company Limited SCHEME OF PRESENTATION Service Territory Consumer Profile Stakeholders Company Level KPIs & Initiatives Stakeholders’ Major Obligations as per Performance Contract Performance Management System Performance Contract & Its Effectiveness Review of KPIs for 1 st Quarter, ending September 2010 AMR Pilot Project – At Consumer End Benefits of AMR Pilot Project AMR Project – Requirements Future AMR Projects: - AMR at CDP, GRID, FEEDER AMR on RF Mesh at Consumer End

Lahore Electric Supply Company Limited SERVICE TERRITORY Sheikhupura Nankana 0.40 M 0.41 M M 0.11 M M FESCO GEPCO MEPCO

Lahore Electric Supply Company Limited Consumers Revenue Category wise Comparison Ending JUN-2010

Lahore Electric Supply Company Limited Category wise Comparison Ending JUN-2010 Revenue Consumption

Lahore Electric Supply Company Limited Stakeholders Customers Employees Suppliers Contractors Regulator Government Lenders Community

Lahore Electric Supply Company Limited Company Level KPIs & Initiatives S#Category Wise KPIs WeightInitiative 1Operational & Commercial Performance 40% AMR, ERP, SBU Line Losses (Transmission & Distribution)15% AMR (CDP, Grid, Feeder) Collection Ratio15% CIBS/Online Banking Transformer Failure Rate2% Oracle MM Line Failure Rate - Below 20 minutes2% AMR, Call Center Line Failure Rate - Above 20 minutes2% AMR, Call Center Defective Meters4% CIBS/AMR (Cons. End) 2Financial Performance 20% Oracle Financials, CIBS,SBU 3Capital Expenditure Project Implementation 15% Oracle Financials & Oracle Projects, MM 4Customer Relations Management 5% CIBS, Call Center 5Human Resource Management 10% Oracle HRMS, BPR, JDs & KPIs 6Employee Safety 10% Safety Stock from Oracle MM, Workshops/Train. Operational & Commercial Performance 40% Line Losses 15% Collection Ration 15% Transformer Failure Rate 2% Line Failure Rate – Below 20 Minutes 2% Line Failure Rate – Above 20 Minutes 2% Defective Meters 4% [ AMR CDP, GRID, FEEDER Oracle ERP (MM) CIBS, AMR (Cons. end) CIBS/Online Banking AMR (CDP,GRID,FEEDER) Call Center SBUSBU Financial Performance 20% Cash – In – Transit 8% Operation & Maintenance12% ERP Oracle Financials CIBS Customer Info & Billing System SBU Strategic Business Unit Capital Expenditure Project Implementation 15% Capitalization (A-90 Form) 5% Capital Expenditure 10% STG 5% DOP 2% ELR 2% RE 1% ERP Oracle Financials ERP Oracle Projects ERP Oracle MM Customer Relations Management 5% New Connection 2% Customer Facilitation 1% Efficiency of Supply Complaints Resolution 1% Efficiency of Billing Complaints Resolution 1% CIBS Customer Info & Billing System Call Center (118) Human Resource Management 10% Officer’ Strength -Occupancy Ratio 2% Staff’ Strength - Occupancy Ratio 2% Resolution of Disciplinary Cases 2% %age of Officers Trained 2% %age of Staff Trained 2% ERP Oracle HRMS Review of Business Processes, JDs, KPIs Employee Safety 10% Safety Policy & Trainings, Awareness Workshops ERP Monitoring of Safety Items Oracle MM

Lahore Electric Supply Company Limited Stakeholders’ Major Obligations- As per Performance Contract Full Corporate Autonomy in their business & commercial operation. No Interference in Companies Operations Support in clearing the outstanding dues relating to GOP & Govt. of Punjab Ensure Timely Implementation of Tariff Adhere to Regulatory Standards & Procedures regarding tariff adjustments Provide Security to Employees where law and order is serious concern Support to obtain soft long term bilateral and multilateral external financial assistance GOP Support & Obligations NEPRA Obligations Timely Determination of Tariff Sustainable Competitive Power Market Monitoring of Companies Performance Ensure Consumers’ Interests Company Obligations Employee Obligations Implement Approved Strategic Business Plan Set Performance Targets Review of Performance Targets by BOD Establish Performance Monitoring & Control Mechanism Align the HR Policies with Performance Contract HR Development w.r.t. Performance Contract Proactive towards Job Efficient use of available resources Act as Custodian of the Assets of the Company

Lahore Electric Supply Company Limited Performance Management System Cascading of Performance Contract Review of Job Descriptions (JDs) Linkage of KPIs with Proposed JDs Signing of Revised / New Contracts Revised HR Polices / Procedures Targets Setting Performance Evaluation Criteria Rewards & Penalties Business Process Re-engineering Operation & Customer Services Financials Human Resource Projects Employee Safety Cascading of Perf. ContractOrganization Development Information System

Lahore Electric Supply Company Limited Performance Contract & Its Effectiveness MW&P Vs CEO CEO Vs Functional Heads Functional Heads Vs SEs SEs Vs DCMDDTXEN XEN Vs SDOs SDOs Vs LSs MaintenanceRecovery Meter Reading Complaint Individual Employee Level Very Good Tool to Align All the Employees to the Company Objectives & Targets For Its Effective Implementation, Job Description of Each Employee Needs to be Reviewed & Related KPI should be embedded in Job Description. USAID/IRG Has Been Requested to Provide Assistance for Development of Performance Measurement System Very Good Tool to Align All the Employees to the Company Objectives & Targets For Its Effective Implementation, Job Description of Each Employee Needs to be Reviewed & Related KPI should be embedded in Job Description. USAID/IRG Has Been Requested to Provide Assistance for Development of Performance Measurement System Signed In Progress

Lahore Electric Supply Company Limited Performance Contract Targets & Results for (1 st Quarter) KPIs Goal 1 st Quarter st Quarter Achievement Score Line Losses (D)13.4%14.9%14.4% 7.5 Collection Ratio93.0%88.5%92.82% 15 Transformer Failure Rate3.75%6.6%3.84% 2 Line Failure Rate < 20 Minutes Line Failure Rate > 20 Minutes Defective Meters (7-12 months as % of total defective) 5.0%26.16%30.52%0 Total Score Operational & Commercial 69%

Lahore Electric Supply Company Limited Financial Performance KPIs Goal 1 st Quarter st Quarter Achievement score Cash In Transit (Monthly Average)9.0%9.21%5.96%8 O & M Expenses (Rs./ kWh) Total20 Performance Contract Targets & Results for (1 st Quarter) 100%

Lahore Electric Supply Company Limited Capital Expenditure Project Implementation KPIs Goal 1 st Quarter Achievement score Capitalization (A-90)80%79%2.5 Capital Expenditure STG90% 3.75 Distribution of Power90% 1.5 Energy Loss Reduction90% 1.5 Rural Electrification90% 0.75 Total1510 Performance Contract Targets & Results for (1 st Quarter) 67%

Lahore Electric Supply Company Limited KPIs Goal 1 st Quarter st Quarter Achievement Score New Connection100.00%99.61%97.79%1.5 Customer Facilitation96.00%95%95.00%1 Efficiency of Supply Compliant Resolution % 1 Efficiency of Billing Complaint Resolution % 1 Total54.5 Customer Relations Management Performance Contract Targets & Results for (1 st Quarter) 90%

Lahore Electric Supply Company Limited Human Resource Management KPIs Goal 1 st Quarter Achievement Score Officers’ Strength – Occupancy Ratio95.33%96.65% 1.5 Staff Strength – Occupancy Ratio79.33%81.97% 1.5 Resolution of Disciplinary Cases80.00%74.88% 0.5 % of Officers Trained24.86%13.38% 2 % of Staff Trained12.28%13.75% 2 Total1077 Employee Safety KPIs Goal 1 st Quarter Achievement Score No. of Accidents – Fatal0 00 No. of Accidents – Non Fatal243 0 Performance Contract Targets & Results for (1 st Quarter) 70%

Internet (DSL) AMR Server Server at America Internet Gateway LESCO Shad Bagh Sub Division Office Delhi Gate-Feeder AMR Pilot Project Lahore Electric Supply Company Limited Single Phase Meter Three Phase Meter MDI Firefly Repeater Mesh

Lahore Electric Supply Company Limited Installation of AMR Meters On 11-KV Delhi Gate-3 Feeder 10 No. General Duty Distribution T/F 48 No. Independent T/F 11 KV Dehli Gate-3 Feeder from 132 KV Badami Bagh G/S 48 No. Domestic 136 No. Industrial B No. Commercial 9 No. Industrial B-2 Note: - All the AMR Meters are functioning properly 1 No. B-3 Connection

Lahore Electric Supply Company Limited Benefit of AMR Pilot Project Months %age Line Losses [Apr-08 to Mar-09] Before Installation of AMR Meters {12-Months} 13.2% [Apr-2009 to Mar-2010] After Installation of AMR Meters{12-Months} 4.4%

AMR Project – Requirements Lahore Electric Supply Company Limited Description Hardware 1.Meter compatible with utility software 2.Modem / Gateway 3.Server Machines Communication NetworkPublic GSM Network / LESCO WAN SoftwareMultivendor compliant Human ResourceTraining & Motivation Project TeamDedicated preferably external hiring

Lahore Electric Supply Company Limited AMR Proposed Project at CDP, GRID, FEEDER Modem LESCO MIS LESCO Grid Station Transmission Lines 132KV Feeders Lines 11KV MIS Server AMR Server GPRS Cloud With VPN TCP/IP Cloud With VPN LESCO Network LESCO USER LESCO User NEPRA

Firefly Repeater Wireless LESCO Sub Division/ Division/RO Office Gateway Router LESCO Network Wi-Fi LESCO MIS AMR Server Billing Server Gateway Router LESCO Sub Division/ Division/RO Office Ethernet Lahore Electric Supply Company Limited AMR Future Strategy on RF Mesh at Consumer End Firefly Single Phase Meter Three Phase Meter MDI Single Phase Meter Three Phase Meter MDI Regulatory Authority MW&P LESCO Office/User

Financial Summary – 1 st Quarter, 2010 Lahore Electric Supply Company Limited

Thanks

RECORDED LOAD OF DIFFERENT CATEGORIES OF 11KV FEEDERS UNDER LESCO FROM DEC-2009 TO JUNE-2010 Lahore Electric Supply Company Limited #FEEDERS CATEGORY Dec-09Jan-10Feb-10Mar-10Apr-10May-10Jun-10 Load in MW 1Dedicated Industrial Load Dominating Industrial Load Commercial Load Sub Total Agricultural Load Domestic Load Exempted Load Grand Total * Tentative load required for Industrial & Commercial Sectors with zero load shedding round the clock.

ADDITIONAL LOAD REQUIRED FOR ZERO LOAD SHEDDING ON DEDICATED & DOMINATED INDUSTRY Lahore Electric Supply Company Limited PEROID MAX. LOAD (MW) DRAWN BY LESCO LOAD MANAGEMENT QUOTA (MW) INERRUPTIONS 1 HOUR EACH TO BE CARRIED OUT Last year Quota * Required Load for Proposed Quota Dec Hrs closure of Market Feeders 04 Hrs closure of Flour Mills Feeders 08 Hrs closure of T/Well Feeders 04 Hrs closure of Urban Domestic Feeders 08 Hrs closure of Rural Domestic Feeders Jan Feb Mar Hrs closure of Market Feeders 09 Hrs closure of Flour Mills Feeders 12 Hrs closure of T/Well Feeders 09 Hrs closure of Urban Domestic Feeders 12 Hrs closure of Rural Domestic Feeders Apr May Hrs closure of Market Feeders 04 Hrs closure of Flour Mills Feeders 08 Hrs closure of T/Well Feeders 04 Hrs closure of Urban Domestic Feeders 08 Hrs closure of Rural Domestic Feeders Jun * For zero load shedding to industrial sector in LESCO areas.

ADDITIONAL LOAD REQUIRED FOR ZERO LOAD SHEDDING ON COMMERCIAL, DEDICATED & DOMINATED INDUSTRY Lahore Electric Supply Company Limited PEROID MAX. LOAD (MW) DRAWN BY LESCO LOAD MANAGEMENT QUOTA (MW) INERRUPTIONS 1 HOUR EACH TO BE CARRIED OUT Last year Quota Required Load for Proposed Quota Dec Hrs closure of Flour Mills Feeders. 08 Hrs closure of T/Well Feeders. 04 Hrs closure of Urban Domestic Feeders. 08 Hrs closure of Rural Domestic Feeders Jan Feb Mar Hrs closure of Flour Mills Feeders. 12 Hrs closure of T/Well Feeders. 09 Hrs closure of Urban Domestic Feeders. 12 Hrs closure of Rural Domestic Feeders Apr May Hrs closure of Flour Mills Feeders. 08 Hrs closure of T/Well Feeders. 04 Hrs closure of Urban Domestic Feeders. 08 Hrs closure of Rural Domestic Feeders Jun * For zero load shedding to commercial, dedicated & dominated industry in LESCO areas.

Lahore Electric Supply Company Limited Remittance To CPPA – Current Procedure Consumers Collection in Bank Branches HBLUBLABLMCBOthers HBL ESCROW Agent Taxes/ Duties SPPsD.M. CPPA

Lahore Electric Supply Company Limited Settlement with CPPA – Proposed Mechanism Purchase of Power From CPPA (100%) Billing Consumer (76%) To GOP Subsidy (24%) Collection in Escrow A/c Daily Basis 100% Payment to CPPA Through L/C Net of Subsidy L/C Arrangement (subsidy) 24% GOP with CPPA L/C Arrangement 76% LESCO with CPPA Credit Line with Banks To meet Seasonal Variations Limitations Individual bank may not be able to have more exposure on power sector Heavy collateral may be required by the bank Additional financing cost Taxes/ Duties SPPsD.M.