SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP 16 WIND PLANT COMMUNICATIONS BILL MONCRIEF, AL HEFNER.

Slides:



Advertisements
Similar presentations
GEOSS Data Sharing Principles. GEOSS 10-Year Implementation Plan 5.4 Data Sharing The societal benefits of Earth observations cannot be achieved without.
Advertisements

NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
“SG-Systems” (Smart Grid – Operational Applications Integration) “Boot Camp” Overview Greg Robinson, Co-Chair, SG-Systems Brent Hodges, Chair, SG-Systems.
09-Dec Toulouse,FR AD-initial - 1 MOIMS AREA: IPR STATUS REPORT, END of Sprint 2006 Meeting Louis Reich IPR WG Chairman Joint IPR/DAI Workshop 20.
IEC PT TC88 meeting March 2010 Jens Carsten Hansen.
UCAIug HAN SRS v2.0 Summary August 12, Scope of HAN SRS in the NIST conceptual model.
SMART GRID INTEROPERABILITY PANEL SUMMER 2012 FACE-TO-FACE PORTLAND, OREGON  JULY 10-12, 2012 WEATHER TASK GROUP SESSIONS AL HEFNER (NIST)
PCWG 9 th Meeting: 12 December Glasgow Introduction, Agenda and Review of Actions.
Presentation Phase I of the Outage Inquiry Board of Commissioners of Public Utilities March 30, 2015.
Report from MT01 Peter Hauge Madsen Convenor MT01.
DEX Publication Project OASIS PLCS TC Telecon 29 April 2008 Trine Hansen.
SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP8/14 Webconference December 4, 2012.
DOMAIN EXPERT WORKING GROUPS (DEWGS). B2G-I2G Joint DEWG Nov-Dec 2013 Quad Chart Activities and Accomplishments 3 meetings held (Nov-2; Dec 1) Ongoing.
D. Peterson, “WWS R&D Panel Project Registry”, ALCPG, Snowmass, 20-August World Wide Study Detector R&D Panel Project Registry Web Site web site:
PCWG meeting Louisville CO USA October 2014 Maintenance team MT12-1 Revision of IEC : Wind Turbines – Part 12-1: Power performance measurements.
1 ISO/RTO Council Wholesale Demand Response Projects & OpenADR David Forfia.
1 Accelerating Standards for the Smart Grid David Wollman National Institute of Standards and Technology
Jerry FitzPatrick, NIST Chair Wednesday, May 26. Introduction - IKB PAP8 PAP14 DEWG Charter What should the T&D DEWG be doing? T&D DEWG or T and D DEWGs?
2011 Regional Meetings – St Louis Updated 2012 Volunteer Recruitment System (VRS) Stan Marshall, Jr. Chair National Operations Committee Miho Kikujo Sr.
NESCC Meeting March 28, Topics Accomplishments Since Last Meeting Program Management for NESCC Support to the NESCC Sponsor Committee Review and.
July 15, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NARUC Summer Session 2007 NAESB Update to NARUC.
SPRING 2014 MEMBERS MEETING MAY 5-8, 2014  DENVER, COLORADO Smart Grid Interoperability Panel (SGIP) Priority Action Plan (PAP) 21: Harmonized Weather.
Al Hefner (NIST Lead) Frances Cleveland (Technical Champion)
Facility Smart Grid Information Model
לירן קציר Connectivity in Computers IEC TC 57 - Power system management and associated information exchange Established in 1964 – with focus.
Leslie Reynolds Executive Director National Association of Secretaries of State The National Association of Secretaries of State NASS Company Formation.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Common Information Model and EPRI Smart Grid Research
NW Resource Adequacy Forum Steering Committee Conference Call November 4, 2010.
Doc.: IEEE /0047r1 Submission SGIP Liaison Report to IEEE Following the SGIP (2.0) Inaugural Conference Nov 5-7, 2013 Date:
Interim Executive Director June  Financial Management Practices Audit Results Fiscal Year Audit Results Fiscal Year Internal.
Margaret Martin Gardiner Assessment Librarian The University of Western Ontario LibQUAL+2007 Canada 25 October 2007.
Ensemble Predictions: Understanding Uncertainties Lars Landberg Wind Energy Department Risø National Laboratory DTU Denmark Gregor Giebel, Jake Badger,
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Christer Eriksson 11 March 2010 JWG1 - Wind Turbine Gearboxes IEC/ISO Design Requirements for Wind Turbine Gearboxes.
INTERNATIONAL ELECTROTECHNICAL COMMISSION “TC57 and the Smart Grid” CIM Users Group, 2011, May 11 th, Prague.
Lead from the front Texas Nodal 1 Registration Market Call Mar 13, 2009.
1 Standards Database: Status of Development NRC/RES/RGDB Tom Boyce Harriet Karagiannis Nuclear Energy Standards Coordination Collaborative (NESCC) July.
Issues for ISO/IEC : Procedure for the Specification of Web Ontology (PSO) ISO/IEC JTC 1/SC 32/WG 2 Interim Meeting London, UK, November 17, 2009.
Smart Grid Interoperability Panel & ISO / RTO Council Smart Grid Projects David Forfia SGIP Governing Board Member – Stakeholder Category 21 ISO/RTO Sponsor.
Revision of IEC PT Power performance measurements on electricity producing wind turbines TC88 meeting March 2010 Troels Friis Pedersen.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
IEC Measurement and assessment of power quality characteristics of grid connected wind turbines Convener John Tande, SINTEF (NO) Presented by.
Interoperability Standards and Next Generation Interconnectivity Pankaj Batra Chief (Engineering) CERC.
IEC TC57 Smart Grid Activities Scott Neumann USNC TA IEC TC57 November 6, 2009.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
IEC TC57 Smart Grid Task Force Ed Dobrowolski for Scott Neumann 16 June 2010.
Progress on the Activities Outlined in the Recommendations of SWG-1 2nd Meeting of the Statistical Working Group June 2009, Ankara, Turkey Dr. Sıdıka.
IEC SMB-SG1 Energy Efficiency and Renewable Resources Update October 11, 2010 IEC TC100 Update on SMB SG1, October 11, 2010 Energy Efficiency and Renewables.
ASTRA Update Sunflower Project Statewide Management, Accounting and Reporting Tool (SMART) February 12, 2009.
Advanced Metering Implementation Team (AMIT) Update to RMS Presented by Christine Wright September 21, 2011
Open Smart Grid (OpenSG) Technical Committee Plenary October 20, 2009.
Joint BPS and ESS/ITS ATC/AFC Subcommittee Update November 2007 – January 2008 February 5, 2008.
Market Operations Standing Committee March 5, 2003.
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
RMS Update to TAC September 4, RMS Update to TAC August 13 RMS Meeting Summary: August 13 RMS Meeting Summary:
NPSTC is a federation of organizations whose mission is to improve public safety communications and interoperability through collaborative leadership.
CIIMS Proposal for TOP-003 Approach Stacen Tyskiewicz WECC CIIMS Chair March 22, 2016.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
CIIMS Proposal for TOP-003 Approach
Grid Code Development Forum – 6 September 2017
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Technical Committee 3 INFORMATION STRUCTURES, DOCUMENTATION AND GRAPHICAL SYMBOLS.
IEC TC57 Smart Grid Activities
IEEE 802 2nd Vice Chair last name at ieee dot org
ETSI Standardization Activities on Smart Grids
Water Directors meeting Warsaw, 8-9 December 2011
Green Document for WG 47 on Fires in Tumble Dryers
Presentation transcript:

SMART GRID INTEROPERABILITY PANEL WINTER 2012 FACE-TO-FACE IRVING, TEXAS  DEC. 3-6, 2012 PAP 16 WIND PLANT COMMUNICATIONS BILL MONCRIEF, AL HEFNER

WINTER 2012 FACE-TO-FACE IRVING, TEXASAgenda PAP 16 History and Status IEC Standard update Related Activities 2

WINTER 2012 FACE-TO-FACE IRVING, TEXAS PAP 16 History We started in January, 2010 with a meeting, a brochure, and the beginning of a plan. There were some papers, some White Papers, and some help from NIST and others. We held an organizing meeting in March and started having bi-weekly meetings. The SGIP was growing at the same time, so we were asked to develop new things and to try new documentation and so forth We developed a list of ISO’s and others that required data from Wind Plants and compiled THE LIST! 3

WINTER 2012 FACE-TO-FACE IRVING, TEXAS PAP 16 History In June, 2010, we started to address the list and said we’d like to have a guidebook. We held interviews with ISO leaders We began to learn more about

WINTER 2012 FACE-TO-FACE IRVING, TEXAS PAP 16 History In July 2010, we addressed the Wind Power Coordinating Committee to tell them what we were doing After the meeting in St. Louis in October 2010, we wrote to IEC TC88, the home of Our quad chart had a RED Flag on it because we were not making progress with the IEC We knew little about the IEC process There was no Maintenance team for ! By January 2011, we were stalled out We started to work on adding a member to the US team 5

WINTER 2012 FACE-TO-FACE IRVING, TEXAS PAP 16 History In April 2011, our member Anders Johnsson was appointed to lead the maintenance team. We nominated Stan Klein to the US TAG Team We addressed the TC 88 committee to explain what we were hoping to do. We agreed to address , the modeling portion of the standard..\sg3_roadmap.pdf..\sg3_roadmap.pdf In July 2011, we developed the formal request to IEC In October 2011, we heard from the IEC that the task of including our recommendations was accepted, but that the descriptions needed work. 6

WINTER 2012 FACE-TO-FACE IRVING, TEXAS PAP 16 History By January 2012, An change was made in the IEC maintenance team A joint maintenance team was formed, including both TC 88 and TC 57 to address both and 61850, the substation communications standard. By February, a disagreement between the and the groups was brewing and meetings were held to smooth out the differences. PAP 16 decided to hold the application guide until the standard was complete. The Joint Maintenance team continues to work. 7

WINTER 2012 FACE-TO-FACE IRVING, TEXASAgenda PAP 16 History and Status IEC Standard update Related Activities 8

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Report on JWG-25 and related efforts Stanley A. Klein Open Secure Energy Control Systems, LLC (301)

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Background PAP-16 goal is to make suitable for supporting US practices - IEC is wind power extension of IEC Surveyed ISO/RTO's for requirements Developed proposed changes to data models in and provided to IEC Maintenance Team 25 was formed within IEC TC 88 MT-25 became JWG-25 between TC 88 and TC 57 10

WINTER 2012 FACE-TO-FACE IRVING, TEXAS JWG-25 activities Efforts broadened beyond PAP-16 submittal include several issues of harmonization with IEC  Meteorological tower  Alarm model  Statistical model  Nested Common Data Classes  Semantic definitions  Interfaces to (availability) and (simulations) 11

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Other activities Web services for Wind power is a requirements domain - IEC Annex A is a potential solution Weather data for production forecasting - Being addressed in PAP21 Weather 12

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Plans Potential approaches Prepare and release CDV of Edition 2 as interim solution Work on harmonization with for Edition 3 Letter prepared for sending to national committees requesting comments on advisability of interim Edition 2 13

WINTER 2012 FACE-TO-FACE IRVING, TEXASAgenda PAP 16 History and Status IEC Standard update Related Activities 14

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Needs for Wind Power Forecasting Forecasting of Wind Power in IEC ed 2 Dr. Gregor Giebel DTU Wind Energy (formerly Risø National Laboratory) Hamburg, 11. January

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Wind Plant Weather Data Use Cases Application of Weather Data by Wind/Solar/CHP Generator Forecasting data may be used autonomously by a single turbine or wind farm in the middle of nowhere.  Wind farm determine its own maintenance schedule, taking next few day low-wind periods into account. (cleverfarm.com) Historical data for Wind/Solar/CHP plant siting. Communication of Weather Data collected by Wind plant individual turbine and met. tower for other applications: Storage charge management and microgrid islanding. Markets, operations, outage/restoration, disturbance 16

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Weather Data Types for Wind Forecasts Types of forecasts required for Wind Power: Basic operation: Point forecasts Operation which takes into account asymmetrical penalties on deviations from the bid: Quantile forecasts Stochastic optimization taking into account start/stop costs, heat storage, and/or ’implicit’ storage by allowing the hydro power production to be changed with wind power production: Scenarios respecting correctly calibrated quantiles and auto correlation. 17 Source: Henrik Aalborg Nielsen, ENFOR

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Possible Gaps in Weather Standards WXXM is very sketchy with regard to representing uncertainty, as it is made to transport observations, not forecasts. Might be helpful to add info from individual turbines such as wind speed/direction at turbine altitudes (to better represent microclimate). Need better way to aggregate data over various time and spatial scales. Time and spatial scales vary widely:  Time scales vary between historical data for siting, market or restoration, rapid data exchange for disturbance analysis  Spatial scales vary between wind/solar generator or farm, building/campus, microgrid or distribution system, ISO/RTO 18

WINTER 2012 FACE-TO-FACE IRVING, TEXASReferences environment-hearing-rd-high-performance-renewable-energy- development environment-hearing-rd-high-performance-renewable-energy- development Forecasting of Wind Power in IEC ed 2, Dr. Gregor Giebel, DTU Wind Energy; AddingForecastsToIEC pdf cleverfarm.com DOE SunShot FOA on forecasting at sub-hourly, hourly, day www1.eere.energy.gov/solar/sunshot/financial_opps_detail.ht ml?sol_id=511 19

WINTER 2012 FACE-TO-FACE IRVING, TEXAS Concern with Wind Plant Use Cases It's important to note that there is a big difference between including wind power forecast data in the standards (such as ) and the discussion around general weather data. It is unclear if general weather observations, other than those that are part of normal wind power plants, should be within the scope of Wind Plant Weather UCs.  Normal wind plant weather data includes: nacelle instruments and the plant's permanent met tower instruments that are connected to the wind plant SCADA system 20