Truck set-up scheduling for the Elgin, IL facility Vijay Viswanathan, Graduate Student Dr. Jaejin Jang, Associate Professor Department of Industrial Engineering.

Slides:



Advertisements
Similar presentations
Group 1 Ray Quintero, Lei Tian, Jiayin Liu, Morvarid Amirfathi, Rabeeh Sahranavard, Max Tubbs Production Control & Queuing.
Advertisements

Operations Scheduling
Scheduling.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
© The McGraw-Hill Companies, Inc., 1998 Irwin/McGraw-Hill Module 11 Operations Scheduling Chapter 16 (pp ) Work Center and definitions  Objectives.
Operations Management For Competitive Advantage 1 Operations Scheduling Operations Management For Competitive Advantage Chapter 15.
Operations Scheduling
ISE480 Sequencing and Scheduling Izmir University of Economics ISE Fall Semestre.
Scheduling.
Operations Scheduling
1-1 McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved 1 Chapter 19 Operations Scheduling.
Scheduling. Production Planning Process Process Planning Strategic Capacity Planning Aggregate Planning Master Production Scheduling Material Requirements.
DOM 102: Principles of Operations Management Operations Scheduling
Scheduling Chapter 19.
Operations Management
Chapter 2: Model of scheduling problem Components of any model: Decision variables –What we can change to optimize the system, i.e., model output Parameters.
MODELING AND ANALYSIS OF MANUFACTURING SYSTEMS Session 6 SCHEDULING E
presented by Zümbül Bulut
The Learning and Forgetting Effects of Dynamic Workers on the Performance of Dispatching Rules in Flow Shops Horng-Chyi HORNG and Shu-Pei HU Department.
1 By: Prof. Y. Peter Chiu Scheduling ~ HOMEWORK SOLUTION ~
An overview of design and operational issues of kanban systems M. S. AKTÜRK and F. ERHUN Presented by: Y. Levent KOÇAĞA.
Scheduling.
Lab 01 Fundamentals SE 405 Discrete Event Simulation
Using Simulated Annealing and Evolution Strategy scheduling capital products with complex product structure By: Dongping SONG Supervisors: Dr. Chris Hicks.
Inventory Management for Independent Demand
1 Chapter 15 Scheduling. 2 Scheduling: Establishing the timing of the use of equipment, facilities and human activities in an organization Answering “when”
CHAPTER 19 Scheduling Operations Management, Eighth Edition, by William J. Stevenson Copyright © 2005 by The McGraw-Hill Companies, Inc. All rights reserved.
JIT and Lean Operations
Scheduling Master - Slave Multiprocessor Systems Professor: Dr. G S Young Speaker:Darvesh Singh.
Production schedule for a automotive motor head manufacturing plant Anirudh Jagannathan aj2560 Jorge Ortiz jeo2130 Yanira Pichardo yp2323.
The MRP II Hierarchy. Long-Range Planning At the top of the hierarchy we have long-range planning. This involves three functions: resource planning,
Lecture 8: Dispatch Rules
1. Facility size 2. Equipment procurement Long-term
Scheduling.
Modeling Detailed Operations, Part II
Announcement-exam rules
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 16 Scheduling.
Minimizing Peak Wait time at the Union Taco Bell IE 475 – Simulation Term Project Vijayendra Viswanathan Industrial and Manufacturing Engineering UW-Milwaukee.
Topics To Be Covered 1. Tasks of a Shop Control Manager.
Chapter 2 – Fundamental Simulation ConceptsSlide 1 of 46 Chapter 2 Fundamental Simulation Concepts.
“Make to order - Make to Stock Production Systems By: ÖNCÜ HAZIR.
Scheduling for Low-volume Operations Chapter 15 Operations Management by R. Dan Reid & Nada R. Sanders 2nd Edition © Wiley 2005 PowerPoint Presentation.
Chapter 17 Scheduling. Management 3620Chapter 17 Schedule17-2 Overview of Production Planning Hierarchy Capacity Planning 1. Facility size 2. Equipment.
1 Manufacturing Operations Scheduling B2 [ ] B2 [ ] E5 [ E5 [ P9 [---] P9 [---] D1 [ D1 [
Chapter 10 Verification and Validation of Simulation Models
Scheduling. Definition of scheduling Establishing the timing of the use of equipment, facilities and human activities in an organization In the decision-making.
Scheduling. Scheduling: The allocation of resources over time to accomplish specific tasks. Demand scheduling: A type of scheduling whereby customers.
Scheduling for Low-volume Operations
CHAPTER SEVENTEEN SCHEDULING Chapter 17 Scheduling.
1 Forecasting, Planning and Scheduling
Scheduling Operations IDS 605 Spring Data Collection for Scheduling l Jobs l Activities l Employees l Equipment l Facilities Transparency 18.1.
Activity Scheduling and Control
Dr. Anis Koubâa CS433 Modeling and Simulation
Scheduling.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
14 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Operations Planning and Scheduling 14 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
16 Scheduling (focus on sequencing; FCFS, SPT, EDD pages , and Johnson’s rule pages ) Homework; 6, 7, 11.
Manufacturing Simulation Case Studies
PRODUCTION ACTIVITY CONTROL (PAC)
CHAPTER 8 Operations Scheduling
Kyle Erwin Manager, Development Engineering
Chapter 10 Verification and Validation of Simulation Models
Production Activity Control
PRODUCTION ACTIVITY CONTROL (PAC)
Modeling Scheduling Problems
Chap 11 Learning Objectives
Introduction to Scheduling Chapter 1
8 Job Sequencing & Operations Scheduling CHAPTER Arranged by
Sequencing Sequencing: Determine the order in which jobs at a work center will be processed. Workstation: An area where one person works, usually with.
Incorporating lot sizing into MRP
Presentation transcript:

Truck set-up scheduling for the Elgin, IL facility Vijay Viswanathan, Graduate Student Dr. Jaejin Jang, Associate Professor Department of Industrial Engineering

Overview of Presentation Introduction Detailed Problem Description Objective of Project Assumptions The Scheduling Algorithm Simulation Input Summary of Results Conclusion

Introduction Wisconsin Lift Truck corporation sells, rents, services trucking equipment like … –Aerial lift and construction equipment –Cranes –Lift Trucks –Industrial Cleaning Equipment –Loaders –Pallet Trucks –Personnel Carriers

Introduction They have seven locations in Wisconsin and two locations in Illinois Our contact for this project is –Kristine Rauch Industrial Engineer, WLT, Brookfield, WI

Receive Truck StockSold to Customer Inventory WIP Schedule for Set-Up Stage Delivery (Corp run or Branch truck) Set-Up (Bay Area)

Problem Description Bay has maximum capacity of 25 –5 stations with capacity of 5 trucks each 4 are considered WIP 1 truck is being worked on 5 techs available for scheduling –one tech assigned to each of the 5 bays

Problem Description Cont’d 4 set-up types 19-Used Truck Setup –3 types of New Truck Setups 20-N.T SET-UP 36-NEW RTL SET-UP 76-I/C NT SETUP

Tech 1 Tech 2 Tech 3 Tech 4 Tech 5 Schematic of the Truck Set-up Bays

Scheduling Objective Minimize the time it takes for stock and new customer truck set ups to get from WIP to the delivery area Minimize tardiness to ensure timely delivery of trucks to customers as much as possible

Assumptions There will be no preemption during setup, once a job is started, it is completed –If we cannot finish a truck without stopping in the middle of processing, we do not start the truck Once a tech has completed a setup they will start the next set up right after Both stock and customer trucks are taken together as number of stock trucks is negligible 6 hour work day Receive Truck Schedule for Set-Up Truck set for delivery Set-Up (Bay Area)

Scope for scheduling 2 areas where scheduling can be done –When picking trucks from the infinite arrival area into one of the 5 WIPs –When selecting one truck for set-up in each bay station

Raw Data Analysis Data From: Jan 2005 – May 2006 i.e.; 16 months –Job Type 76 – 515 jobs –Job Type 36 – 43 jobs –Job Type 19 – 97 jobs –Job Type 20 – 449 jobs –Total Significant Jobs: 1104 % of Job Type 76 – 46.65% % of Job Type 43 – 3.89% % of Job Type 19 – 8.79% % of Job Type 20 – 40.67% Total No. of Trucks No. of Stock Trucks [IMH RENTAL] - 89 [4.5%] No. of Sold Trucks – 1885 (95.5%)

Simulation Input Data –Setup times for each job type Total labor $$ billed on each truck available Tech billed at $97 per hour –Distributions for inter-arrival times, by job type Used ARENA Input Analyzer module to fit each of these into standard probability distributions

More Simulation Inputs.. Due dates were assigned as an attribute to every job arriving –Due date distribution also determined from invoice data Results were used to design an ARENA simulation so that different scheduling algorithms could be implemented and their performance evaluated.

Scheduling LOGIC Experimented with 4 different hybrid scheduling algorithms. Scheduling Algorithms used are a simple combination of standard algorithms with modifications made to suit this problem. –LST and SPT Process trucks in both WIP and bay queues in order of lowest value of the sum of Slack time and Processing time. In doing so, we anticipate minimizing flowtime as also reducing slack. –LST OR SPT A modification of the above algorithm where incoming trucks are processed as per the least slack time, if (slack >0), else SPT is used to select trucks from the queues.

Scheduling Logic –EDD With Priority Modification of the EDD algorithm to incorporate a priority mechanism for new truck types over old truck types Selection rule is – least value of (due date/priority), where priority is “50” for a new truck type and “10” for a used truck type (type 19) –Shortest Processing Time Plain ol’ SPT in least order of processing time

Simulation run Parameters Replication Length – 180 Days Hours/day – 6 hrs Warm up period – 10 Days Number of Replications -4

Simulation Results [ALL UNITS DAYS] JOB TYPE 20 RULE Combination Avg. FlowtimeMax. FlowtimeAvg. LatenessMax. Lateness LST_SPT LST_OR_SPT EDD_PRIO SPT JOB TYPE 19 [USED TRUCK] RULE Combination Avg. FlowtimeMax. FlowtimeAvg. LatenessMax. Lateness LST_SPT LST_OR_SPT EDD_PRIO SPT

Conclusion The combination of LST and SPT works best to minimize overall flow time (but not tardiness). If either LST/SPT is used depending on whether the job is slack or not, this leads to a significant reduction in max. lateness, compared to using LST + SPT in all cases. SPT scheduling yields the least max. lateness. A priority based scheme predictably decreases the avg. lateness for new truck set-ups. Future Work Idea –An Intelligent scheduler that can decide on the right scheduling algorithm based on a reasonable guess of whether incoming jobs will be late or not.

Thank you! Questions/Comments?