Kingsville Campus Facility Felipe Leal Director, Kingsville Campus
History Current location since 1998, enrollment 150. Fall 2012 enrollment 600
Facility 99991493 total building square footage 33335000 CBC square footage 11119 classrooms 6666 computer labs 2222 distance learning centers 1111 nursing lab 1111 cosmetology lab 1111 biology/chemistry lab 1111 pharmacy tech lab/classroom 1111 Cisco systems lab/classroom 1111 student success center 1111 testing lab oAoAoAoAnd a partridge in a pear tree
Programs with grads since AAS in Science 49 Accounting 1 Accounting Certificate 2 Computer Info Tech Web Design 1 AAS Computer Information Technology 1 Cosmetology 42 Criminal Justice 3 Early Development and Ed. 8 Law Enforcement 1 Medical Records Coding 1 Nursing AAS 2 Pharm Tech 3 Prof. Business Tech Med Spec. AAS 3 Admin Specialist 1 Med Admin. Specialist 1 Prof Business Technology AAS 1 Level II 2 Rad Tech 1 VN 45
Success Rates Success (A, B, C grades) by Academic Year COURSE SUCCESS Total NOT SUCCESSFULSUCCESSFUL Total %82.0%100.0% %77.9%100.0% Total %80.0%100.0%
Staffing 15 Full Time Faculty 7 Full Time Faculty (shared with another Campus) 10 Part Time Faculty 12 Full Time Staff 17 Part Time Staff
Expansion?? Add Science lab with Title V Move Cosmetology to street side Add classroom areas for increased relationship with KISD Exploring increased courses for STEM programs with TAMUK (possible annex on our campus) Make CBC a more college type atmosphere with courtyard, study rooms, possible food service. Increased Library area. Community Center
QUESTIONS?
THANK YOU!