Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.

Slides:



Advertisements
Similar presentations
NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Advertisements

First Executive Session Fermilab Director’s/DOE Fermi Site Office's Performance Management System Review of the NOvA Project June 19-20, 2007 Frank Gines.
LIGO-G P LIGO Project Accounting Presentation June 27, 2000.
OFFICE OF SCIENCE Review of Critical Decision 2 for the Large Liquid Argon Detector for Neutron Physics (MicroBooNE) at Fermi National Accelerator Laboratory.
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
GLAST LAT Offline SoftwareWorkshop - SLAC, Jan , 2001 R.Dubois Lehman Review Feb Joint NASA/DoE review My understanding: –“The purpose of the.
1 Red Light Camera Update Presented by Ruby Rozier, Manager, Traffic Engineering Division Board of County Commissioners June 29, 2010.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM January.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
TRAINING SESSION 3 Tuesday, October 16 Basecamp – Cal Workback Schedules - Odona.
Collab 4/15/04 #1 EDMEDM Funding the Project Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Raleigh, NC March 3, 2006.
CONSTRUCTION MANAGEMENT CONSTRUCTION ENGINEERING & MANAGEMENT DEPT
Project management Dr. Khaled Bubshait 1 Dr. Khaled A. Bubshait Project Management.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
AGS RSVP Weekly Meeting P. Pile 16 September 2004 AGS RSVP Weekly Meeting, 16 Sep 2004 AGS Project Office - status of funding, comments on RSVP
Executive Session Director’s CD-1 Review of the LBNE Project September 25, 2012 Jim Yeck.
Hosted by: Institute for Software Integrated Systems (ISIS) Vanderbilt University Software Reliability for FCS May 18-19, 2004 ARO Workshop.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
Request for Proposals: Workforce Solutions System
EDMEDM EDM Fast Start, May 23, 2006He3S, Steven Williamson EDM Fast Start Helium-3 Services (He3S) Steven Williamson May 23, 2006.
Philip Burrows SiD meeting, Chicago 15/11/081 Progress on the LoI Philip Burrows John Adams Institute Oxford University Thanks to: Hiro Aihara, Mark Oreglia.
EDMEDM EDM Collaboration Meeting Project Management Fast Start Summary Prepared by: John P. Tapia May 25, 2006.
Collab Store 6/6/07 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June.
AGS RSVP Weekly Meeting P. Pile 2 December 2004 AGS RSVP Weekly Meeting 2 Dec 2004 Useful Links: RSVP Project : C-AD AGS Project: Office.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
P25 Business 11/1/07 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration MIT-Bates, Middleton,
P25 Interface 5/19/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Subsystem Managers Duke University,
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain for Walter Sondheim, P-25, Los Alamos February 11, 2005, at Los Alamos National Laboratory Conventional.
Office of Nuclear Physics Response 12/14/06 #1 Response to the CD-1 Review Report Martin Cooper Los Alamos.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
PHENIX Decadal R&D Workshops To begin exploring the most promising technologies to support the PHENIX upgrades plans for the next decade, as outlined in.
September 10, 2004 Experimental Facilities Division SING Project Status HYSPEC IDT Meeting John Haines SING Project Manager September 10, 2004.
Office of Nuclear Physics Collaboration Meeting 5/19/08 #1 nEDM Reworked Schedule Kim Selvage Project Controls Analyst.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Slow controls R and D Chris Gould North Carolina State University and TUNL.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
Engineering Approach EDM Collaboration Meeting 2-07 Jan Boissevain.
EDMEDM LANL Review of EDM Cost and Schedule Jan Boissevain, P-25 February 11, 2005, Los Alamos National Laboratory EDM Reference Design Tour of the Reference.
FNAL PM kick-off Meeting June 17, 2010 E. do Couto e Silva 1/11 SuperCMDS at SNOLAB Ge Towers System Requirements Eduardo do Couto e Silva
P25 Business 5/20/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration Duke University, Durham,
EDMEDM C&S Review 2/11/05 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to LANL Cost and Schedule Review Committee.
3 He R&D Plan at Los Alamos Takeyasu Ito Los Alamos National Laboratory EDM Collaboration Meeting May 26, 2006 Oak Ridge, TN.
EDM Assembly and Commissioning – or – How to Cut Two Years from the Project P. Huffman and V. Cianciolo.
Presented to: By: Date: Federal Aviation Administration Runway Safety Nextgen Initiatives Capstone 3 Industry Day Paul S. Erway, AJS-4SW, Runway Safety.
EDM Fast Start Presentation WBS 11 – Assembly and Commissioning Vince Cianciolo, Paul Huffman May 23, 2006.
EDMEDM EDM Collaboration Meeting 6-05 Jan Boissevain, P-25 June 20, 2005, Los Alamos National Laboratory EDM Reference Design.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
P25 Business 2/8/08 #1 Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The nEDM Collaboration ASU, Tempe, AZ February.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Collab 6/20/05 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to The EDM Collaboration Los Alamos, NM June 20,
Fernanda G. Garcia, Steve Dixon, Andy Stefanik, Justin Tillman, John Voirin SBN Far Detector Installation & Integration.
Office of Nuclear Physics R&D 12/14/06 #1 Risk Based R&D Plan Martin Cooper Los Alamos.
Collab_NSAC 4/2/03 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson for the EDM Project for presentation to EDM Collaboration Meeting Los Alamos, NM.
Specifications for the Integrated Tests II Paul Huffman.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Camera PDR/CD1 Planning 19 September 2008
Collaboration Business
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
Crab Cavities Contribution from the U.S.
Oct 22 Group Leaders Planning meeting
SPONSORED PROGRAM SERVICES OVERVIEW
CONVENTIONAL FACILITIES LCLS Office Space
CONVENTIONAL FACILITIES LCLS Office Space Procurement
Project Management Considerations
Preliminary Project Execution Plan
ThomX – Commissioning Meeting – 25/01/2018
Presentation transcript:

Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration Oak Ridge, TN May 26, 2006 Collaboration Business

Collab 5/26/06 #2 EDMEDM Outline Election of New Collaborating Institutions Revised Funding Plan NSF Funding Schedule for Obtaining CD-1 CD-1 Rehearsal Agenda CD-1 Review The Other CDs Internal Reviews Institutional Commitments The Next Collaboration Meeting

Collab 5/26/06 #3 EDMEDM Election of New Collaborating Institutions Indiana University MIT

Collab 5/26/06 #4 EDMEDM Funding Profile

Collab 5/26/06 #5 EDMEDM NSF Funding I yield to the honorable Doug Beck

Collab 5/26/06 #6 EDMEDM Schedule for Obtaining CD-1 Dates Fast Start –May Subsystems turn in all documents –June 9 Documents to LANL reviewers– July 3 Documents to DOE –July 10 LANL review –July DOE Feedback –July 24 Documents to DOE reviewers –July 31 DOE review –August 7-9 Documents finalized –August 23 DOE approval –October 15

Collab 5/26/06 #7 EDMEDM CD-1 Reviewers LANLDOE Ed TempleJehanne Simon-Gillo Dean HofferWlodek Guryn Greg BockGene Henry Brad Keister Mike RomalisJohn Wilkerson Gordon Cates (unconfirmed)Roy Holt Chris KeithGeorge Seidel John Haines Barry Holstein Stephen Tkaczyk

Collab 5/26/06 #8 EDMEDM CD-1 Review Agenda Monday, August 07, :45 AMIntroduction / Institutional Perspective [10]S. Seestrom 9:00 AMPhysics Division Commitment [10]J. Shlachter 9:15 AMScience, Technique, & Alternatives [30]S. Lamoreau 10:15 AM Project Overview [40]M. Cooper 11:15 AMProject Management [20]J. Tapia 11:45 AMEngineering Approach [10]J. Boissevain 1:00 PMResearch and Development [30]M. Cooper 1:45 PMPolarized Neutron Beam Line & Shielding [20]W. Korsch 2:15 PMCryostats, Refrigerators & Related Equipment [20]D. Haase 3:30 PM3He Systems [30] S. Williamson 6:00 PMAdjourn – Homework Assignments (if necessary) 6:30 PMDinner with Collaboration

Collab 5/26/06 #9 EDMEDM CD-1 Review Agenda Tuesday, August 08, :15 AMHomework Responses (if necessary)M. Cooper 8:30 AMMagnets & Magnetic Shielding [30]B. Filippone 9:15 AMCentral Detector Systems [30]T. Ito 10:15 AMElectronics, Computers, & Data Analysis [15]C. Gould 10:40 AMInfrastructure [12]W. Sondheim 11:00 AM Assembly and Commissioning [30]P. Huffman 12:30 PM Breakout Sessions: See Breakout Chart 6:00 PMHomework Assignments (if necessary) 6:30 PMDinner with Collaboration Wednesday, August 09, :30 AMQ & A with PL (if necessary)M. Cooper 12:30 PMCloseout with EDM Team and LANL ManagementCommittee

Collab 5/26/06 #10 EDMEDM CD-1 Review Agenda Breakout Session 1 R&D Cryostats Refrigerators & Related Equipment 3He Systems Magnets & Magnetic Shielding Central Detector Systems Breakout Session 2 Polarized Neutron Beam Line & Shielding Electronics, Computers, Simulations & Data Analysis Infrastructure Assembly and Commissioning Breakout Session 3 Project Controls Risk Management Cost Estimates Schedule Estimates Procurement Quality Assurance Project Safety

Collab 5/26/06 #11 EDMEDM CD Schedule Dates CD0 –Q4, 2005 CD1 –Q1, 2007 CD2a –Q2, 2007 CD3a –Q3, 2007 CD2b –Q2, 2008 CD3b –Q1, 2009 CD4 > Q4, 2012

Collab 5/26/06 #12 EDMEDM Internal Reviews Purpose:To promote quality assurance and collaboration teamwork Schedule:Set by the Contract Project Manager (Martin). Under normal circumstances, adjacent or part of collaboration meetings. Under urgent circumstances, as needed at the principal site of the reviewed work package. Reviewers:Selected by Martin from the collaboration Scope:R&D Funding Proposal Preliminary engineering Final engineering Acceptance testing Discretionary

Collab 5/26/06 #13 EDMEDM Institutional Commitments

Collab 5/26/06 #14 EDMEDM The Next Collaboration Meeting Adjacent or separate from the DOE Review? When?

Collab 5/26/06 #15 EDMEDM Coffee Break Enjoy!