FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar 2009- Feb 2012.

Slides:



Advertisements
Similar presentations
Legal issues on shale gas activities raised in petitions received by the European Parliament Committee on Petitions.
Advertisements

Training Workshop for Financial Intermediaries and Implementing Agencies Kiev, May 2011 Ruxandra Floroiu Senior Environmental Engineer, ECA Region, World.
Environmental Assessment in Nova Scotia
PROPONENT INVOLVEMENT IN CONSULTATION Presentation to the Geology Matters Community Engagement Workshop October 30, 2012 Consultation with the Mi’kmaq.
Environmental Legislation in Pakistan – Compliance Perspectives Ibad ur Rehman Deputy Director (Projects) Cleaner Production Institute.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
SUPPORTED BY THE EUROPEAN UNION’S OBNOVA AND PHARE PROGRAMMES EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE Scoping.
Environmental Impact Assessment
Scoping in the EIA process Proposal Identification Screening
Planning Permission Process and Procedures
HEADQUARTERS Strategic Environmental Assessment ”SEA is a systematic process for evaluating the environmental consequences of proposed policy, plan or.
Environmental Impact Assessment Myriam Raiche November 8, 2007.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Fermilab Environmental Management System (EMS)
EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.
ENVIRONMENTAL MANAGEMENT PLAN
Overview of Environmental and Social Safeguards Environmental Management Plan Checklist for Simple Civil Works Zagreb, May 6-8, 2009 Presenter: Natasa.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Environmental Assessment in Newfoundland & Labrador Environmental Assessment in Federations: Current Dynamics and Emerging Issues Conference Current Dynamics.
What If I Must Go Beyond a Preliminary Assessment? (the example of a USAID EA under Reg. 216) [DATE][SPEAKERS NAMES]
HABITAT CONSERVATION PLANNING Charles J. Randel, 1 III, Howard O. Clark, Jr., 2 Darren P. Newman, 2 and Thomas P. Dixon 3 1 Randel Wildlife Consulting,
Environmental Impact Assessment (EIA): Overview
Environmental Impact Assessment University of Santo Tomas College of Architecture SP2 Ecological Construction Environmental Architecture.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
DECISION-MAKING, FOLLOW-UP AND ENFORCEMENT OCTOBER 15, 2012.
What is Necessary to Ensure Natural Justice in EIA Decision-making? Angus Morrison-Saunders Senior Lecturer in Environmental Assessment School of Environmental.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
Energy, Environmental Impacts, and Sustainable Development Presented by Cat Shrier, Ph.D., P.G. Water Resources Planner (403)
Environmental Management System Definitions
EIA in Pakistan Brief background and History of the National EIA system. It started with the promulgation of Pakistan Environmental Protection Ordinance.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
Lecture(9) Instructor : Dr. Abed Al-Majed Nassar
USAID Environmental Procedures. EA Training Course Tellus Institute 2 USAID Procedures Overview  USAID environmental review requirements are:  A specific.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Infrastructure Development Bill [B ] Submission by the Centre for Environmental Rights to Portfolio Committee on Economic Development 14 January.
Environmental Impact Assessment in the Slovak republic.
THE SPECIES AT RISK ACT (SARA) CBA/Justice National Section Meeting National Environmental Energy Resources Law Group Ottawa – October 24, 2004.
Consultation seminar on the preparation of full Application Form for LSP 6 December 2011, Tartu Consultation seminar on the preparation of full Application.
The European SEA Directive Simon Marsden School of International Business, University of South Australia Module 1: Basics of SEA.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
1 Completing the CEQA Checklist Terry Rivasplata.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
Presentation to Association Municipalities of Ontario Implementation of Management of Excess Soil - A Guide for Best Management Practices Ministry of the.
HEALTH IMPACT ASSESSMENT: WHAT WE SHOULD DO IN MEXICO JULIETA PISANTY-LEVY.
INTERNATIONAL AND TRANSBOUNDARY ENVIRONMENTAL ASSESSMENT LAW OCTOBER 29, 2012.
Public Consultation Session: Consultation and Transparency Requirements for Offshore Petroleum Activities Francesca Astolfi A/g General Manager, Offshore.
Implementation of FAO Environmental Impact Assessment Guidelines in the new FAO project cycle Alemneh Dejene Climate Impact, Adaptation and Environmental.
Canadian Environmental Legislative David Hunter B.A., LL.B., LL.M. Bennett Jones LLP Presentation to: Fachbereich 1 Architektur, Bauingenieurwesen, Geomatik.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
EIA (Environmental Impact Assessment)
Lecture-18: EIA (Environmental Impact Assessment) Course Instructor: Md Asif Rahman (ASR) Lecturer, Department of Mathematics and Natural Sciences (MNS)
Municipal Class Environmental Assessment
EIA approval process, Management plan and Monitoring
ENVIRONMENTAL MANAGEMENT & SUSTAINABILITY ISSUES
Infrastructure planning and management
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
National Environmental Policy Act (NEPA)
Relationship between World Bank and Romanian EA requirements
EIA- Concept and Practice
Environment Safeguards
Environment Safeguards
10th Air Quality Governance Lekgotla Session: 7.3
Environmental Impact Assessment EIA
Presentation transcript:

FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012

WHAT IS ENVIRONMENTAL ASSESSMENT Environmental Assessment is a planning tool and its main purpose is to give the environment its due place in the decision making process by evaluating the environmental consequences of the proposed activity. WHY NEED EIA?  Mandatory legal requirement  Requirement of the buyers  Social Responsibility  Influence of the donor agencies Environmental Assessment for development projects EIA or IEE in accordance with the EIA/IEE Regulations

BENEFITS OF ENVIRONMENTAL ASSESSMENT  Protection of Environmental and Human Health  Opportunity for Public participation  Sustainable use of resources  Minimize the risk of disasters

POLICY AND LEGAL FRAMEWORK IN PAKISTAN  Enacted on 31 December 1983  provides for the control of pollution and preservation of living environment  Section-8 of PEPO requires the submission of detailed EIS at the time of planning the project. Pakistan Environmental Protection Ordinance 1983 Pakistan Environmental Protection Act 1997  Enacted on 6 th December 1997 by repealing PEPO-1983  Provides framework for protection, conservation, rehabilitation and improvement of the environment, for the prevention and control f pollution and promotion of sustainable development.  Section-12 of PEPA-1997 requires the submission of EA Report prior to the start of construction.  Section-17 defines the penalties in case of failure to comply with the provisions of the Act.  Four Environmental Tribunals, one in each province have been constituted to hear the cases relating to PEPA-97.

PEPA (Review of IEE and EIA Regulations,2000 POLICY AND LEGAL FRAMEWORK IN PAKISTAN  Projects requiring an IEE or EIA are listed in schedule I and II respectively on the basis of anticipated degree of adverse environmental impacts  Provides necessary details on preparation, submission, review and approval Guidelines by Federal EPA for conducting Environmental Assessments and Management of different types of development projects. Guidelines include: General Guidelines Policy and procedures for filing, review and approval of Environmental Assessment Preparation and review of Environmental Reports Public Participation Pakistan Environmental Assessment Procedures, 1997

Guidelines for Sensitive and Critical Areas National Environmental Quality Standards (NEQS): Promulgated in 1993 and revised in 2000 for municipal and industrial effluents, industrial gaseous and vehicular emissions Sectoral Guidelines Major thermal power stations Major chemical and manufacturing plant Municipal waste disposal New Township development Oil and gas exploration and production Major roads Water supply projects Sewerage schemes Industrial Estates

POLICY AND LEGAL FRAMEWORK IN PAKISTAN NEQS (Self Monitoring and SMART Rules, 2001)  Classification of Industrial Units into A,B and C depending upon the pollution level  Environmental priority parameters and frequency of monitoring Other Environmental Laws  Long list that falls in the category of Environmental LawsEnvironmental Laws  Other laws applicable to the development projects are following;

ADMINISTRATIVE SETUP FOR EIA PAK-EPA (Responsible for implementing the PEPA-1997 ) PAK-EPA (Responsible for implementing the PEPA-1997 )  Federal EPA have overall jurisdiction over EIA/IEE Provincial Agencies Punjab EPD NWFP EPA Balochistan EPA Sindh EPA Environmental Assessment for Development Projects

INTERNATIONAL OBLIGATIONS  Signatory to various international environmental treaties and conventions onconventions wildlife protection and conservation of environment  Fulfill the commitments of treaties

EIA PROCESS IN PAKISTAN Project Proposal Screening IEE NO EIA Identification of Impacts & Appropriate Mitigation Measures Scoping Draft Report Final Report Review of Report by Regulatory Authority and Public Decision Making Approved Not Approved Implementation & Follow-up Redesign & Resubmit Public, Scientific Community and Decision Makers Participate Public Informed & Consulted

EIA Process/Preparation “Process of judgment to decide, whether or not to conduct Environmental Impact Assessment for the proposed activity”. “ Determination of most critical issues to be studied”. Process of interaction between interested public, government agencies and the proponent  Early step to identify the important issues and eliminate the those that are not  Time and money saved activity Use of Activity  Reasonable and practical alternatives  Inform potentially affected people  Identify possible effects on the environment and alternatives  Define the boundaries for further assessment Screening Scoping

 Analytical methods and consultation procedures  Decision making Roles of Stakeholders  Proponent  The responsible authority  Other departments and agencies  Environmental experts Report Preparation and Steps Introduction Project Description Baseline Environmental Profile (Description of existing environment both biotic and abiotic) Identification and assessment of impacts Appropriate mitigation measures Environmental management and monitoring plan

Introduction Covering purpose of the report including identification of the project & proponent, description of size, nature and location of the project, objective & scope of the study Project Description Type and category of the project, objective of the project, alternatives considered, Maps and drawings, size and magnitude of operation, restoration plan, Government approvals. Description of Environment Sufficient information on existing environmental resources including physical resources, ecological resources and socioeconomic conditions of the area.

Identification and Prediction of Potential Environmental Impacts Identification and prediction of environmental impacts during design, construction and operational phase of the project. Checklist and Matrix are commonly employed techniques. Characteristics of the impacts: Nature, magnitude, duration, reversibility Mitigation Measures Suggest appropriate measures to minimize or eliminate the impacts Environmental Management Plan  Ensure effective implementation of mitigation measures  Responsibilities are assigned to staff

 Monitoring of environmental quality parameters to obtain the information on current levels potentially harmful parameters of water, air and soil quality.  SMART provides the details and frequency of environmental priority parameters (both liquid and gaseous) to be measured Environmental Monitoring Plan TOC of an EIA Report is attachedattached

Agency Federal EPA EPD-Punjab EPA-Sindh EPA-NWFP EPA-Baluchistan Total EPA PERFORMANCE STATISTICS IEE and EIA Applications Received by Federal and Provincial EPAs