NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.

Slides:



Advertisements
Similar presentations
DOE/NSF U.S. CMS Operations Program Review Closeout Report Fermi National Accelerator Laboratory March 10, 2015 Anadi Canepa, TRIUMF Anna Goussiou, University.
Advertisements

NPDgamma Liquid Hydrogen Target Safety Review Project and Safety At LANL November 29-30, 2005.
Hydrogen Delivery System – R&D Activities T W Bradshaw M Courthold M Hills J Rochford Daresbury Controls Group etc…
Interfaces with the SNS Project for the ARCS Instrument Doug Abernathy ARCS Hardware Project Manager ARCS Construction Project Review DOE Germantown Aug.
Helium 3 Neutron Precision Polarimetry CHRISTOPHER CRAWFORD, ROEL FLORES, CHRISTOPHER MENARD*, ELISE MARTIN, University of Kentucky *present address: Washington.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
NPDgamma Liquid Hydrogen Target Safety Review At LANL November 29-30, 2005.
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
The n- 3 He Project Christopher Crawford University of Kentucky for the n- 3 He Collaboration n-3He Technical Review ORNL, TN
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 Overview of the NPDGamma Experiment at the Fundamental Neutron Physics Beamline Geoff Greene UT/ORNL.
The 2nd NPDGamma Experiment Safety Review - Liquid Hydrogen Target Seppo Penttila NPDGamma project manager June 09, 2008 SNS.
Ventilation of the LH2 Target GHS In MPF-35: The target gas handling system (GHS), target cryostat, and part of the vent stack are covered by a tent that.
The NPDGamma Experiment A measurement of the parity violating directional γ -asymmetry in polarized cold neutron capture on hydrogen. Nadia Fomin University.
LIGO-G M Management of the LIGO Project Gary Sanders California Institute of Technology Presented to the Committee on Programs and Plans of the.
NPDGamma: Data Acquisition System October 15th, 2010 NPDGamma Collaboration Meeting ORNL.
Status update of n- 3 He experiment DOE FnPB Review, ORNL D. Bowman, S. Penttila Oak Ridge National Laboratory M. Gericke University of Manitoba.
Measurement of Parity-Violation in Cold Neutron Capture M. Dabaghyan for the NPDGamma Collaboration The n + p → d + γ Experiment at LANL.
Conceptual Design Review of the NPDGamma Experiment in Beam Line 13 Seppo Penttila NPDGamma project manager September 25, 2007 at SNS.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
Normalization of the NPDGamma Experimental Data F. Simmons, C. Crawford University of Kentucky, for the NPDGamma collaboration Background: NPDγ Experiment.
LANSCE Update for BESAC July 23, 2002 Paul W. Lisowski LANSCE Division Leader Los Alamos National Laboratory.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
NPD  and NDT  Experiments Christopher Crawford University of Kentucky NPD  run at LANSCE preparations for SNS run feasibility test of NDT.
To measure the beam intensity a sampling method was used where two cadmium apertures (P1 and P2) are placed to cut the beam down so the neutron counts/sec.
The HYSPEC Polarized Beam Spectrometer Mark Hagen, Barry Winn, Melissa Graves-Brook Neutron Scattering Science Division David Anderson, Xin Tony Tong Neutron.
NPDgamma Liquid Hydrogen Target Safety Review Operating Procedures At LANL November 29-30, 2005.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
RaDIATE March 2015 Admin Meeting P. Hurh Fermilab 20 March 2015.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
October 3, 2008 John Haggerty 1 PHENIX Plan for Run 9 John Haggerty Brookhaven National Laboratory.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
1 Status of FNPB Geoff Greene / Nadia Fomin University of Tennessee.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Collab 5/26/06 #1 EDMEDM Martin Cooper, Los Alamos Co-spokesperson and Contract Project Manager for the EDM Project for presentation to The EDM Collaboration.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Np A  nD A  np  n n  pp A z p  A z f  hr0hr hr1hr h2h
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Hydrogen Pre-Operation Safety Review 4 th October 2011 The Hydrogen Delivery System – An Introduction M Hills.
NPDgamma Liquid Hydrogen Target Safety Review Warning Alarms and Interlocks At LANL November 29-30, 2005.
The NPD  Experiment David Bowman IScientific goals IIStatus.
CM27 – 8 th July 2010 LH2 System Progress and Future Plans M Hills T Bradshaw M Courthold I Mullacrane P Warburton.
PRad Recent Achievements 1)PRad Implementation (“Position”) document developed and submitted to Jlab. 2)Jlab’s Director Office scheduling review passed.
1 How Can We Get More Neutrons? Upgrade Paths for the EDM Geoff Greene University of Tennessee /Oak Ridge National Laboratory Oct 2006.
The LH2 target has to be in the para-hydrogen state. At room temperature H2 is 75% ortho and 25% para. To catalyze the conversion between ortho and para.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
EDM in ER2 at LANSCE Jan Boissevain LANSCE ER-2 Stake Holder Meeting
Status of facility design Activities of the IPNS Nuclear/Particle Physics group Basic information for the working sessions Activities of Nuclear and Particle.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.
Technical Readiness Review of the n-3He Experiment Seppo Penttila ORNL P-div At SNS Jan
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Run Time, Mott-Schwinger, Systematics, Run plan David Bowman NPDGamma Collaboration Meeting 10/15/2010.
The NPDGamma Experiment Christopher Crawford University of Tennessee hadronic PV formalism experimental setup LANSCE ) SNS MadisonSpencer.
Moving the NPDGamma Experiment to the SNS FnPB Christopher Crawford University of Kentucky overview of NPDGamma transition to the SNS expected.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
The NPDGamma Experiment Measurement of Parity-Violating Gamma-ray Asymmetry on Hydrogen with Polarized Cold Neutrons Serpil Kucuker Dogan University of.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
The NPDGamma Experiment at the SNS Motivation Weak Interaction between quarks Radiative capture of polarized cold neutrons in protons NPDGamma experiment.
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
KEK news ( ) S.Tanaka.
The G0 experiment at JLAB
Fundamental Neutron Physics BL-13
The NPDGamma Experiment at the SNS FnPB
The n3He Experiment Michael Gericke for the n3He collaboration
Integrated Safety and Environmental Management
Imaging & Engineering STAP Meeting 12th-13th of April 2018
NSS integrated installation plan workshop Introduction
Test Beamline System Requirements and Charge to PDR Committee
Presentation transcript:

NPDGamma - LH2 Target - Relief/Ventline Systems Seppo Penttila NPDGamma Project Manager Predicted A  =5x10 -8 We are aiming to 10% measurement.

Proposal was written in 1997 Spinka I Committee’ technical review in 1998 Spinka II Committee’s technical review in 2000 Project Management Plan signed in 2001 Spinka III technical review in November Commissioning run - beam line, experiment except of LH2 target are ready The latest DOE review was on Oct-2004 Project background

Organizational Chart Bill Louis Jack Shlachter Doug Fulton TBA Hersman/UNH Gentile/NIST

Organizational chart for the construction of the experiment and the beam line Project Construction (Cont. from Fig. 3.1) S. Penttila / LANL Beam Line Coordinator S. Penttila / LANL Beam Line Coordinator S. Wilburn / LANL Experiment Coordinator S. Wilburn / LANL Experiment Coordinator S. Page / Manitoba Beam Monitors S. Page / Manitoba Beam Monitors S. Wilburn / LANL Cave S. Wilburn / LANL Cave S. Wilburn / LANL Spin Flipper S. Wilburn / LANL Spin Flipper R. Carlini / TJNAF Guide Field R. Carlini / TJNAF Guide Field K. Coulter / Michigan T. Smith / NIST 3 He Polarizer K. Coulter / Michigan T. Smith / NIST 3 He Polarizer S. Wilburn / LANL DAQ S. Wilburn / LANL DAQ M. Snow / Indiana Hydrogen Target M. Snow / Indiana Hydrogen Target M. Snow / Indiana Detector M. Snow / Indiana Detector S. Wilburn / LANL ER-2 Utilities S. Wilburn / LANL ER-2 Utilities J. David Bowman / LANL Test & Commission J. David Bowman / LANL In-Pile J. David Bowman / LANL In-Pile S. Penttila / LANL Guide S. Penttila / LANL Guide S. Wilburn / LANL ER-1 Utilities S. Wilburn / LANL ER-1 Utilities S. Penttila / LANL Shutter S. Penttila / LANL Shutter S. Penttila / LANL Integrated Shielding S. Penttila / LANL Integrated Shielding M. Leuschner / UNH Chopper M. Leuschner / UNH Chopper TBD / LANL (LANSCE) Integrated Beam Line Coordinator

The NPDGamma Collaboration Collaborating institutes; Dayton, Dubna, Hamilton, IU, Jlab, KEK, LANL, NIST, ORNL, TRIUMF, UCB, U. Manitoba, UM, UNH, UT, … Sponsors: DOE, NSF, NSERC, LANL, KEK, Institutes

Flow chart for the shed and ER2 LH2 target effort

Issues for this review but not limited to LH2 target vent stack at ER2. Ventilation line for the GHS enclosure at ER2. LH2 target vent stack in MPF-35, shed. Ventilation duct for the tent in MPF-35.

Working in the “new” Laboratory To have the approved LH2 target at Lab at present times is a great challenge for the NPDGamma collaboration and LANL personnel. We need all available help and support to complete successfully this project. Project schedule: First fully test the target system in MPF-35. Then mount the target to FP12 and test it. Get approvals and be ready for beam in late summer We need about 1-2 mo beam on the target in Vent lines: In and outside ER2 the pipes should be in place prior the beam.

10%-Design Review of the FP-12 Liquid Hydrogen Target Vent Systems Agenda: 9:00Opening words Bowman 9:10Committee ’ s charge Hurd/Knudson 9:20 NPDGamma experiment; status, plans, schedules Penttila 9:35Discussion 9:45LH2 target system and its safety features Snow 10:05 Discussion 10:20Sizing of the vent/relief lines Nann 10:50Discussion 11:15 Sizing of the vent/relief lines from 1 st principles Jankowski 11:25Discussion 11:3510%-design of the relief/vent lines in shed and in ER2 Etuk/Penttila 12:05Discussion 12:30Box lunch followed by touring MPF-35 and ER2 1:30 Results of testing CF joints Snow 1:45 Discussion 2:00 Ventilation of gas handling system in shed and in ER2 Penttila 2:30 Discussion 2:50 Discussion to close open issues Knudson 4:50 Closing