NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006.

Slides:



Advertisements
Similar presentations
Project Summary Project Objectives Indicative Activities Outputs Beneficiaries Risk and assumptions Project Management Structure.
Advertisements

Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
URUGUAY’s efforts to address synergies among the Conventions Workshop on synergies and cooperation with other conventions 2-4 July 2003 Espoo, Finland.
THE APRM MONITORING PROCESS MOZAMBIQUE EXPERIENCE Workshop on Harmonizing the Zambian APRM NPoA with the NDP and MTEF Oct. 2014, Lusaka 1.
Monitoring of Capacity Development in GEF Operations UNFCCC Expert Workshop on Monitoring and Evaluating Capacity Building in Developing Countries St.
Implementation of Capacity Development for CDM Project in Viet Nam Nguyen Khac Hieu Climate Change Coordinator Vietnam National Office for Climate Change.
Strengthening the Environment, Forestry and Climate Change Capacities of the Ministry of Environment and Forests and its Agencies (GCP/BDG/053/USA) Introduction.
Mini-Grid Based on Renewable Energy (Biomass) Sources to Augment Rural Electrification Implemented by UNIDO.
Ministry of Environment Tourism Directorate of Environmental Affairs CEGEM Project Overview and Outcomes Strengthening Capacity Enhancement to Implement.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
GEF-6 Strategy for Cross-Cutting Capacity Development GEF Expanded Constituency Workshop Managua, Nicaragua March 3-4, 2015.
EVALUATION IN THE GEF Juha Uitto Director
PRESENTATION The Structured Dialogue. What? A participative process for young people and decision-makers to discuss and elaborate recommendations jointly.
PROJECT BACKGROUND & PROGRESS NIGERIA POLYCHLORINATED BIPHENYLS (PCB S ) MANAGEMENT PROJECT (P )
GEF Expanded Constituency Workshop 5 to 6 November 2012 New Delhi, India Roles and Responsibilities of Council Members and Focal Points.
The Project Preparation Phase Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches.
STRENGTHENING the AFRICA ENVIRONMENT INFORMATION NETWORK An AMCEN initiative A framework to support development planning processes and increase access.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
Climate Change and CDM in Thailand
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
NCSA Project Management Committee Meeting 28 th December, 2006.
1 Capacity Building: Strategy and Action Plan GEF-UNDP Strategic Partnership Capacity Development Initiative.
Cross-cutting areas of Capacity Building and Adaptation UNDP Workshop for NIS Environmental Focal Points June 2004.
GEF Expanded Constituency Workshop Apia, Samoa 15 to 17 October 2013 Cross-Cutting Capacity Development Strategy – GEF 5.
Evaluation in the GEF and Training Module on Terminal Evaluations
Project Overview, Objectives, Components and Targeted Outcomes
The Project Governance Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project “Piloting Integrated Processes and Approaches.
Egyptian Environmental Affairs Agency National Capacity Self Assessment (GEF/UNDP) The Third GEF Assembly Side Event – 30 th August,2006 Cape town Integrating.
Tracking of GEF Portfolio: Monitoring and Evaluation of Results Sub-regional Workshop for GEF Focal Points Aaron Zazueta March 2010 Hanoi, Vietnam.
Financing for National Communications UNFCCC Workshop, Manila Ravi Sharma United Nations Environment Programme – Global Environment Facility.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Development of Management Information System for the Forestry Sector in Viet Nam F O R M I S II Implementation of PSC’s conclusion during the 2 nd meeting.
Ministry of Regional Development and Public works Global Environment Facility United Nations Development Programme Integrating Global Environmental Issues.
Danielius Pivoriunas Sr. Operations officer, Capacity Development, GEF SGP and Relations with countries of Eastern Europe and Central Asia GEF Familiarization.
The GEF/UNDP/UNEP National Communications Programme for Climate Change United Nations Development Programme UNFCCC Workshop on the Preparation of National.
EASTERN AFRICA POWER POOL EAPP 5 th Coordination Meeting Of African Regional Power Pools 6 th – 7 th May 2010 Harare, Zimbabwe.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW Meeting, April – May 2013.
NCSA AS A TOOL FOR INTEGRATED ENVIRONMENTAL MANAGEMENT (ARMENIA EXPERIENCE) Anahit Simonyan June, 2004 Bratislava UNDP ARMENIA.
ENABLING ACTIVITIES FOR THE PREPARATION OF THE KINGDOM OF CAMBODIA’S SECOND NATIONAL COMMUNCIATION TO THE UNFCCC (SNC Project) Presented by Long Rithirak.
M&E in the GEF Carlo Carugi Senior Evaluation Officer Expanded Constituency Workshop Dakar, Senegal - July 2011.
Towards Green ICT strategies: Government paving the way - Ghana Environmental Protection Agency and VODAFONE (Ghana) Collaboration At: Fifth ITU Symposium.
Paul Desanker Financial and Technical Support UNFCCC secretariat Framework for Capacity- building in Developing Countries Expert Workshop.
Sub-regional Workshop for GEF Focal Points Nairobi, Kenya May 2007.
The Project Overview, Objectives, Components and Targeted Outcomes Inception Workshop and the First Steering Committee Meeting of the UNEP/GEF Project.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS presented by Ermath Harrington GEF Regional Focal Point.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Pilar Barrera Operations officer Civil Society/Capacity Development Expanded Constituency Workshop Sarajevo, September 6, 2013 Cross-Cutting Capacity Development.
Tracking national portfolios and assessing results Sub-regional Workshop for GEF Focal Points in West and Central Africa June 2008, Douala, Cameroon.
ReSAKSS-ECA: Progress Report Godfrey Bahiigwa ReSAKSS Coordinator Eastern and Central Africa (COMESA) May 31, 2007.
WHO EURO In Country Coordination and Strengthening National Interagency Coordinating Committees.
Enhancing National GEF Coordination, Communications and Outreach Latvia Anita Drondina.
Piloting Integrated Processes and Approaches To Facilitate National Reporting to Rio Conventions – a GEF/UNEP project CBD SBSTTA 14 May 2010, Nairobi,
BRIEFING SEQUENCE a) MEA FOCAL POINT AGENCIES b) COMMITTEES CREATED FOR THE THREE UN CONVENTIONS c)COMPOSITION OF MEA FOCAL POINT AGENCY COMMITTEE AND.
Implementation of PRTRs as a tool for POPs reporting, dissemination and awareness raising Steering Committee meeting Madrid November 26.
Integrating GEF in Environment and Sustainable development plans and policies North Africa Experience with Focus on Egypt Case study Dr. Mawaheb Aboul.
Developing National GEF Strategies and Setting Priorities Nino Tkhilava GEF Operational Focal Point in Georgia Europe and CIS workshop for GEF Focal Points.
IPCC Key challenges facing communities, and approaches to solutions that enhance resilience: through NAPs Climate and Health Summit 2014 Investing.
Reforms in the Albanian Public Procurement System 7 th Regional Public Procurement Forum Tbilisi, Georgia May 16-19, 2011 PUBLIC PROCUREMENT AGENCY 1.
NCSA Project Management Committee Meeting April 4 th, :00 am EEAA Premises 6 th floor.
Pilar Barrera Operations officer Civil Society/Capacity Development Expanded Constituency Workshop Abuja, Nigeria October 2, 2013 Cross-Cutting Capacity.
Monitoring and Evaluation for UNDP/GEF projects MONITORING AND EVALUATION OF UNDP/GEF PROJECTS Inception Workshop, Baikal Lake Watershed Project,
GEF Familiarization Seminar
Ministry of Water Resources, River Development and Ganga Rejuvenation
Cross-Cutting Capacity Development (CCCD)in the GEF – A REVIEW GEF Expanded Constituency Workshops 2017.
UN Support to SDG implementation in Seychelles.
11/18/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY PORTFOLIO COMMITTEE – 02 MAY 2018.
12/5/2018 ANNUAL performance PLAN (2018/19) NATIONAL DEVELOPMENT AGENCY Select COMMITTEE – 19 June 2018.
Roles and Responsibilities of Council Members and Focal Points
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
GEF Strategic Approach to Capacity Building
Presentation transcript:

NCSA Project Management Committee Meeting Yasmine Abdel Aziz Deputy Project Director 21 st January, 2006

Content of the presentation Progress up todate Progress up todate Main features of the AWP 2006 Main features of the AWP 2006 Discussions and comments Discussions and comments Proposed CB 2 project concept of MEAs Proposed CB 2 project concept of MEAs

Progress up todate POP has identified four main activities:  set up and operationalization of the PMU  stocktaking and gap identification of the three thematic areas  Nationalization of the MDG 7” Ensure Environmental Sustainability”  BEZRA TV Awareness campaign

Achievements per output a) set up and operationalization of the PMU The PMU has been fully functional and operational managing the day to day activities of the NCSA as purchase of equipment, hiring of consultants, follow up on the delivery of reports, production of NCSAs publications, holding the NCSA workshops, preparing project proposal, etc, ….. The PMU has been fully functional and operational managing the day to day activities of the NCSA as purchase of equipment, hiring of consultants, follow up on the delivery of reports, production of NCSAs publications, holding the NCSA workshops, preparing project proposal, etc, …..

Achievements per activity b) Stocktaking and gap identification Three consultants have been hired for development of reports on the three thematic areas in November Three consultants have been hired for development of reports on the three thematic areas in November Internal discussion on the reports have taken place within the PMU and the draft final has been submitted last week for PMU final approval. Internal discussion on the reports have taken place within the PMU and the draft final has been submitted last week for PMU final approval. Stocktaking of the workshop was not delivered in December 2005 due to the time extended for development of the reports. Stocktaking of the workshop was not delivered in December 2005 due to the time extended for development of the reports.

Achievements per output: c) Nationalization of the MDG 7 “Ensure Environmental sustainability” A consultant has been hired in November 2005 for development of a report on country Specific targets and indicators under goal 7 of MDGs A consultant has been hired in November 2005 for development of a report on country Specific targets and indicators under goal 7 of MDGs A working group has been formed from seven line ministries (environment, health, housing, agriculture, water, electricity local development and planning) and have met twice 21/12/ /1/2006 A working group has been formed from seven line ministries (environment, health, housing, agriculture, water, electricity local development and planning) and have met twice 21/12/ /1/2006 The basis for the exercise is the NEAP as well national sectoral plans of other line ministries and their already set indicators. The basis for the exercise is the NEAP as well national sectoral plans of other line ministries and their already set indicators. An interim report has been submitted to the PMU for review. The report contains literature review at the global, regional and national level and records of the meetings. An interim report has been submitted to the PMU for review. The report contains literature review at the global, regional and national level and records of the meetings. Final report expected to be submitted by end of February 2006 Final report expected to be submitted by end of February 2006 A workshop for launching the country specific targets did not take place last year and expected to be conducted in the first quarter of this year due to the late holding of the inception workshop in November 2005 A workshop for launching the country specific targets did not take place last year and expected to be conducted in the first quarter of this year due to the late holding of the inception workshop in November 2005

Achievements per output: d) Awareness raising Production of green belt booklet for EEAA on the celebrations of the World Environment Day Production of green belt booklet for EEAA on the celebrations of the World Environment Day Preparation of BEZRA School Campaign instead of the TV series including the three thematic areas. Preparation of BEZRA School Campaign instead of the TV series including the three thematic areas. The products of the campaign include :posters, look ups, copybooks, tickets for copybooks, ti shirts, wall magazine, CD, and others. The products of the campaign include :posters, look ups, copybooks, tickets for copybooks, ti shirts, wall magazine, CD, and others. Coordination with the Ministry of education has taken place for choosing of schools in Cairo, Giza,Alexandria, Suez and Assuit. Coordination with the Ministry of education has taken place for choosing of schools in Cairo, Giza,Alexandria, Suez and Assuit. Contracting of 2 publications companies in December 2005 Contracting of 2 publications companies in December 2005 Approval of the Minister of State for Environmental Affairs on the materials - pending Approval of the Minister of State for Environmental Affairs on the materials - pending Campaign should start mid February after the mid year vacation in 50 schools. Campaign should start mid February after the mid year vacation in 50 schools.

Main Features of AWP 2006

AWP 2006 includes: Operationalization of the NCSA/ PMU( ongoing ) 2005 remaining activities: holding the consultation workshop for the three thematic stocktaking and gap identification report. holding the consultation workshop for the three thematic stocktaking and gap identification report. Finalization of the MDG 7 report and holding the workshop Finalization of the MDG 7 report and holding the workshop Conduct BEZRA school campaign and produce final evaluation report on the activity. Conduct BEZRA school campaign and produce final evaluation report on the activity original AWP activities: 2006 original AWP activities: Based on the three thematic reports, the prioritization phase should start by hiring one consultant Based on the three thematic reports, the prioritization phase should start by hiring one consultant Workshop for discussion of the prioritization report Workshop for discussion of the prioritization report Support to the GEF National Steering Committee for review of the ongoing GEF activities and proposing new projects for GEF funding Support to the GEF National Steering Committee for review of the ongoing GEF activities and proposing new projects for GEF funding

AWP 2006 includes: Development of indepth studies in 2 or 3 thematic areas upon the prioritization phase Development of indepth studies in 2 or 3 thematic areas upon the prioritization phase Holding workshops for discussion of the indepth studies Holding workshops for discussion of the indepth studies Development of the NCSA Action plan Development of the NCSA Action plan Workshop for discussion of the final NCSA action plan Workshop for discussion of the final NCSA action plan Celebration of one or two thematic areas as desertification 2006 Celebration of one or two thematic areas as desertification 2006 Production of one booklet for NCSA process Production of one booklet for NCSA process

Comments from NCSA/ PMU Most of the NCSAs in other countries have been finalized in 24 months, Most of the NCSAs in other countries have been finalized in 24 months, Egypt Plan is too ambitious as it includes support to policy mainstreaming issues beside the original project activities as MDGs, awareness activities, others. Egypt Plan is too ambitious as it includes support to policy mainstreaming issues beside the original project activities as MDGs, awareness activities, others. Any proposals of activities to be integrated within AWP 2006? Any proposals of activities to be integrated within AWP 2006?

Discussion and Comments from Members

Capacity Building Proposal The PMU/NCSA has developed a concept proposal on mainstreaming MEAs in national development plans by strengthening the reporting and monitoring system in Egypt” The PMU/NCSA has developed a concept proposal on mainstreaming MEAs in national development plans by strengthening the reporting and monitoring system in Egypt” The proposal has been initiated by UNCBD focal point and in line with the other two focal points stocktaking reports. The proposal has been initiated by UNCBD focal point and in line with the other two focal points stocktaking reports. Discussion and comments on the proposal have taken place for the last 2 months between the RCU- UNDP/CO and NCSA/PMU Discussion and comments on the proposal have taken place for the last 2 months between the RCU- UNDP/CO and NCSA/PMU The concept has been reviewed and endorsed by EEAA and the RCU The concept has been reviewed and endorsed by EEAA and the RCU

MEAs overall objective The project overall objective is to mainstream Global Environment in national plans and policies by strengthening the monitoring and reporting system for Multilateral Environmental Agreements in Egypt. The project overall objective is to mainstream Global Environment in national plans and policies by strengthening the monitoring and reporting system for Multilateral Environmental Agreements in Egypt.

MEAs main outputs: Outcome 1. An operational monitoring and information management system for MEAs is enhanced at the policy, institutional and individual level. Outcome 1. An operational monitoring and information management system for MEAs is enhanced at the policy, institutional and individual level. Output 1.1. A database and its management system developed to include all data categories for global environmental management Output 1.1. A database and its management system developed to include all data categories for global environmental management Output 1.2. Necessary legislative and regulatory changes made to streamline the procedures for integrated monitoring for global environmental management. Output 1.2. Necessary legislative and regulatory changes made to streamline the procedures for integrated monitoring for global environmental management. Output 1.3. The capacity of MSEA and other institutions responsible for monitoring are strengthened through provision of necessary technical assistance and targeted training. Output 1.3. The capacity of MSEA and other institutions responsible for monitoring are strengthened through provision of necessary technical assistance and targeted training.

MEAs main outputs: Outcome 2. Coordination mechanism established to comply with the reporting obligations under the global environmental conventions. Outcome 2. Coordination mechanism established to comply with the reporting obligations under the global environmental conventions. Output 2.1. Necessary legislative and regulatory changes made to involve sectoral agencies in national reporting to the MEAs in a consistent manner. Output 2.1. Necessary legislative and regulatory changes made to involve sectoral agencies in national reporting to the MEAs in a consistent manner. Output 2.2. Communication and feed back mechanism established for the reporting process to contribute to the national policy and decision-making. Output 2.2. Communication and feed back mechanism established for the reporting process to contribute to the national policy and decision-making. Outcome 3. The funding procedure installed to achieve monitoring and national reporting practice on a sustainable basis. Outcome 3. The funding procedure installed to achieve monitoring and national reporting practice on a sustainable basis. Output 3.1. Funding scenarios developed for the monitoring and reporting; Output 3.1. Funding scenarios developed for the monitoring and reporting; Output 3.2. Necessary legislative and procedural changes made to operationalise the funding mechanisms for sustainable monitoring and reporting. Output 3.2. Necessary legislative and procedural changes made to operationalise the funding mechanisms for sustainable monitoring and reporting.

Component, cost and completion dates matrix Stakeholders and stocktaking analysis 3,000 May 2006 Feasibility analysis 5,000 May 2006 Consultation process 2,000 May 2006 Stakeholder workshop 2,000 May 2006 Project coordination 10,000 May 2006 Preparation of MSP proposal 10,000 May 2006 International Travel 3,000 May 2006

Procedures for MEAs proposal GEF funding will allow between 25,000 – 35,000 for preparation of full project document by May 2006 GEF funding will allow between 25,000 – 35,000 for preparation of full project document by May 2006 Detailed discussion with all stakeholders will take place between February and May 2006 to cover all stakeholders needs within the overall objective of the project Detailed discussion with all stakeholders will take place between February and May 2006 to cover all stakeholders needs within the overall objective of the project Expected time for start up within 2 months after submission of final project document Expected time for start up within 2 months after submission of final project document The final project document will be submitted for NCSA steering committee for approval The final project document will be submitted for NCSA steering committee for approval

Thank you