CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern.

Slides:



Advertisements
Similar presentations
Critical Reading Strategies: Overview of Research Process
Advertisements

SITE INVESTIGATION.
RESEARCH PROPOSAL DR.URJA MANKAD.
IX- CONSTRUCTION PLANNING
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review OTEC Cold Water Pipe-Platform Sub-System Dynamic Interaction Validation Lockheed.
Design Parameters.
International Energy Agency Hydrogen Implementing Agreement Proposed Task on Hydrogen Safety.
Tony Leach (Itasca Africa)
Large Excavations in the US Lee Petersen, CNA Consulting Engineers Presented by Chang Kee Jung, SUNY Stony Brook NNN05 Conference.
Chapter 2.
Henderson DUSEL Physics & Geoscience Workshops Lee Petersen, CNA Consulting Engineers Greg Hulne, Miller Dunwiddie Dale Holland, Dunham Associates.
1 Software Testing and Quality Assurance Lecture 15 - Planning for Testing (Chapter 3, A Practical Guide to Testing Object- Oriented Software)
PPA 501 – Analytical Methods in Administration Lecture 2c – The Research Proposal.
Overview of Advanced Design White Paper Farrokh Najmabadi Virtual Laboratory for Technology Meeting June 23, 1998 OFES Headquarters, Germantown.
Listening to the Learner - Week 1- Program for Educational Transformation Through Technology.
Research Proposal Development of research question
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Systems Engineering Management
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
A Comparison of Numerical Methods and Analytical Methods in Determination of Tunnel Walls Displacement Behdeen Oraee-Mirzamani Imperial College London,
Advanced Manufacturing Laboratory Department of Industrial Engineering Sharif University of Technology Session #19.
Proposal Writing.
Chapter 5 Initiating and Planning Systems Development Projects
MATHEMATICS KLA Years 1 to 10 Understanding the syllabus MATHEMATICS.
ARCH 330- Materials/Methods The course will cover the systems associated with construction materials methods and sequencing primarily in building construction.
Prof. A. Taleb-Bendiab Room 605 A. Taleb-Bendiab, Module: Research Methods,
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
S/W Project Management
Industrial Engineering Roles IIE-IAB, November 2006.
Architect By: Chia-Jade Lee & Chloe Horgan By: Chia-Jade Lee & Chloe Horgan.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Literature Review and Parts of Proposal
Industrial Engineering Roles In Industry
Laughton 7/04 Long Baseline Neutrino Program Tunneling Chris Laughton, Fermilab.
Chapter 6 : Software Metrics
Capital Project Process
UNO Cavity Liner System: Status Report and R&D Proposal D. Warner Colorado State University October 16, 2004.
“PROPOSAL” FINAL YEAR PROJECT (FYP) ERT 423 SESSION 2010/2011
Evaluating a Research Report
Inquiry and Investigation. What was the TOPIC? PROBLEM? CIVIC INQUIRY?
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Chapter 3 Dr. Bahaa Al-Sheikh & Eng. Mohammed Al-Sumady Intoduction to Engineering Introduction to Engineering Design 1.
DUSEL Experiment Development and Coordination (DEDC) Internal Design Review July 16-18, 2008 Steve Elliott, Derek Elsworth, Daniela Leitner, Larry Murdoch,
Rock Mechanics/Geophysics Larry Costin, Sandia National Labs Paul Young, University of Toronto Discussion Points November 12, 2004 DUSEL Workshop.
By Cao Hao Thi - Fredric W. Swierczek
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
1 Naruki Wakabayashi Shimizu Corporation Tokyo Japan Study on the Jointed Rock Mass for the Excavation of Hyper-KAMIOKANDE Cavern at Kamioka Mine NNN07.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
DESIGN AND CONSTRUCTION OF A MODULAR MASSIVE DETECTOR AT THE HOMESTAKE LAB Modular Mass – 100 Kilotons Modular Shape –Cylinder –50m dia x 50m high Depth.
10/2010 IWLC2010 Global Design Effort 1 Brief Overview of Interaction Region Conventional Facilities in RDR Times Presenter Tom Lackowski.
The Research Process Chapter 4. The Process Explore Propose Prepare Execute Analyse Publish.
The Research Process.  There are 8 stages to the research process.  Each stage is important, but some hold more significance than others.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Cognitive Science and Biomedical Informatics Department of Computer Sciences ALMAAREFA COLLEGES.
Chapter 12 Auditing Projects.
ANALYSIS PHASE OF BUSINESS SYSTEM DEVELOPMENT METHODOLOGY.
IAEA International Atomic Energy Agency Presenter Name School of Drafting Regulations for Borehole Disposal of DSRS 2016 Vienna, Austria Siting Strategies.
Software Engineering (CSI 321) Software Process: A Generic View 1.
DUSEL Development Process: The Roadmap from Science & Engineering Plan to the Facility Description Lee Petersen CNA Consulting Engineers.
 All civil engineering projects like dams, reservoirs etc. constructed on earth crust and constructed by material obtained from the crust.  So it is.
SITE INVESTIGATION ARUN MUCHHALA ENGINEERING COLLEGE-DHARI
Sergio Cristiá Abad, Espoo, Rock mechanical modelling and analysis CAVERN DESIGN AND OPTIMAL LOCATIONS Sergio Cristiá Abad Laguna-LBNO extended.
Systems Analysis & Design 7 th Edition Chapter 2.
ANT11 Presentation, October, 10-13, 2011 David Vardiman Project Engineer Geotechnical Design and Excavation 1 Sanford Lab at Homestake, Lead, SD 4850L.
In the name of God. Common Technical Document On Biotech.
Prof. Shrikant M. Harle.  The Project Life Cycle refers to a logical sequence of activities to accomplish the project’s goals or objectives.  Regardless.
SAL INSTITUTE OF TECHNOLOGY AND ENGEENIRING RESEARCH Ahmedabad B.E (3rd Semester)-Civil-Shift 2 December-2014 Shah Disha R.( ) Gosai Beran.( )
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
N4/5 Design & manufacture
Presentation transcript:

CSM/CNA UNO R&D Proposal Lee Petersen –CNA Consulting Engineers Mark Kuchta –Colorado School of Mines Requested budget: $200k/year for two years Cavern Design and Construction R&D

CSM/CNA UNO R&D Proposal With dimensions of 60m wide, 60m high, and 180m long, the proposed UNO excavation would be the largest underground civil structure ever constructed anywhere in the world. Before attempting such an ambitious project, it is imperative that a comprehensive research program be conducted regarding the design parameters, excavation procedure, support system, rock mass property requirements, and long-term stability issues that will be critical to the success of the UNO project.

Objective 1—Utilize Global Experience in Large Cavern Design and Construction at Great Depth 1. Conduct a comprehensive literature survey to include cavern size, cavern shape, site investigation, design methodology, construction methods, rock support and reinforcement, construction schedule, construction cost, and end use for similar large underground excavations that have been successfully completed (or attempted) throughout the world.

2. Convene a two-day workshop of academics, designers and constructors from around the world having fundamental knowledge or experience in the construction of large underground excavations. The purpose of the workshop will be primarily be to further develop the ideas discussed in task 1 as they relate to UNO construction. 3. Prepare a comprehensive technical report summarizing the results of the literature survey, design workshop, and identifying any critical topics requiring further research.

Objective 2—Define Rock Mass Characterization Issues for UNO 1.Investigate an document rock mass characterization and investigation methods that will be required for the proper design of the UNO cavern such a drilling, down-the-hole testing, remote sensing, horizontal and vertical stress determinations, etc. 2.Identify and investigate rock mass scale issues involved in scaling up from existing cavern sizes to the dimensions required for UNO. 3.Investigate the requirements for initial pilot excavations.

Objective 3—Identify Design Methodologies for UNO 1.Extend empirical design methods developed in objective 1 to UNO size and depth. 2.Investigate limitations (if any) of analytical methods for large cavern design using numerical modeling software such as the Universal Distinct Element Code (UDEC) and the Fast Lagrangian Analyses of Continua (FLAC) numerical codes.

Objective 4—Investigate Design and Construction Issues for UNO 1.Using analytical methods, analyze the stress concentrations and excavation stability as a function of the shape of the final excavation. It is possible that a large elliptical shaped excavation would be more stable at depth that a shoebox shaped cavern.

2. Develop three different strategies for the excavation of the UNO cavern. Using numerical methods, analyze the stress concentrations and excavation stability at various stages of the excavations in order to identify a preferred excavation sequence that will maximize overall stability during excavation, and minimize the potential undesired stability problems such as rock bursts. 3. Identify any significant limitations of materials, equipment, methods and personnel for each of the three excavation strategies.

Rock burst at the Gotthard Tunnel

Objective 5—Prepare Conceptual Design for UNO 1.Prepare Generic Site Description, including Rock Mass Characteristics, and Reasonable Ranges for Key Parameters 2.Prepare Conceptual Design Based on Empirical Design Methods 3.Prepare Conceptual Design Based on Modeling Methods 4.Investigate Influence of Depth, In Situ Stresses, Rock Mass Strength, Discontinuity Spacing, Cavern Shape 5.Investigate Outfitting Issues, Including Water Containment, Bulkheads

Objective 6—In-Service Performance 1.Interaction between Internal Structures, Water Containment Membranes and Ongoing Rock Movement 2.Design and Operation Requirements for Filling and Emptying the Cavern 3.Service Life Issues (Materials, Corrosion, Long-Term Rock Behavior)

Objective 7—Risk Management Strategies 1.Site Investigation, Site Selection, Design, Procurement, Construction, Operation

Results 1.The results of these investigations will be made available through a series of technical reports, and 2.through various documents to be made available through a dedicated UNO web page.