Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.

Slides:



Advertisements
Similar presentations
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
Advertisements

ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
WinDS-H2 MODEL Wind Deployment Systems Hydrogen Model Workshop on Electrolysis Production of Hydrogen from Wind and Hydropower Walter Short Nate Blair.
Concentrating Solar Deployment Systems (CSDS) A New Model for Estimating U.S. Concentrating Solar Power Market Potential Nate Blair, Walter Short, Mark.
GPA Renewable Energy Resource for Guam Power Authority
ENERGY EFFICIENT STORAGE By Er.V.Vallivel, M.E Assistant Executive Engineer/ MRT/ TNEB/ Muppanda l RENEWABLE ENERGY SOURCES-TAMIL NADU/ INDIA.
11 Presentation for ERCOT ETWG FERC Notice of Proposed Rulemaking: Frequency Regulation Compensation in the Organized Wholesale Power Markets (RM )
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Technical Conference Avoided Cost Modeling January 6, 2015.
Coordinated Competitive Regional Renewable Power Procurement New England States Committee on Electricity May 16, 2013 Massachusetts Wind Working Group.
Capacity Valuation.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
Unlocking value from existing utility assets NARUC Meeting – February 2012
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
Potential Impacts of an Advanced Energy Portfolio Standard in Pennsylvania Ryan Pletka, P.E. Black & Veatch April 12, 2004 Supported by: Heinz Endowments.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
ENERGY ONLY RESOURCES & THE RPS CALCULATOR. Deliverability Overview Most resources procured to date have been procured to be fully deliverable – CAISO.
INTEGRATION COST. Integration Cost in RPS Calculator While “Integration Cost” is included in NMV formulation, the Commission stated that the Integration.
ERCOT PUBLIC 4/22/2014 Updates for 2014 LTSA Scenario and Data Assumptions 4/22/2014.
ERCOT PUBLIC 7/10/ LTSA Scenario Development.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
The Role of Energy Storage in Renewable Power Integration Emily Fertig Sharon Wagner Carnegie Mellon University.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Joint OSPE – PEO Chapter Energy Policy Presentation Prepared by OSPE’s Energy Task Force 1.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Northwest Power and Conservation Council 6 th Plan Conservation Resource Supply Curve Workshop on Data & Assumption Overview of Council Resource Analysis.
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  Summary of first LTSA Workshop  Topics and Speakers.
RPG Meeting Five Year Plan Extension Brad Schwarz.
Smart Capacity Markets: Can they be Smart Enough? Tim Mount Department of Applied Economics and Management Cornell University Smart Capacity.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
Generation Adequacy Task Force Update to WMS September 14, 2011.
Proposed Generation Expansion Process For Review and Discussion March 1, 2011.
Renewables and System Services Ann Scully.
Kevin Hanson Doug Murray Jenell Katheiser Long Term Study Scenarios and Generation Expansion Update April, 2012.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
Long Term Study Task Force Update ERCOT Long-Term Study Scenarios January 13, 2012.
On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid On/Off Operation of Carbon Capture Systems in the Dynamic Electric Grid Rochelle.
Long Term Study Transmission Results May 21 st, 2013.
Long Term Study Task Force Update Modeling Emerging Resources Through 2030 January 13, 2012 LTSTF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
ERCOT PUBLIC LTSA Introduction. ERCOT PUBLIC 2 Outline  Background  2016 LTSA Process  2016 Scenario Development Process  2016 LTSA Schedule.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Compressed Air Energy Storage (CAES) Wind Integration Study Team September 10, 2009.
The amount of electricity produced must always be on the same level as demanded!  Base Load  Intermediate Load  Peak Load Source : http ://
Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
1 RETI 2.0 Plenary Group Meeting 3/18/2016 DRAFT 2016 RPS Portfolios.
POWER SYSTEMS CONFERENCE POWER SYSTEMS CONFERENCE Analysis of a Residential 5kW Grid-tied Photovoltaic System Presented by: Yacouba Moumouni Co-authors:
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
CSP Grid Value of Energy Storage and LCOE Implications 26 August 2013
Sandip Sharma ERCOT Manager, Operations Planning
Presentation transcript:

Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012

Introduction The Long Term Study Task Force (LTSTF) needs your assistance in developing scenarios –We would like to focus on scenarios that are likely to display different transmission system needs The LTSTF is issuing an RFP to have a new tool developed to assist us evaluating different system needs –We would like your assistance in identifying all the details that this tool needs to analyze The LTSTF has been working with vendors to get better understanding of their technology characteristics –We need your assistance in reviewing these assumptions January 13,

Current Scenarios and Status Business as Usual (BAU) Scenario –Resource Expansion (based on economic analysis) – DONE –Analysis of transmission needs for system reliability – DONE –Analysis of economic transmission projects – In Progress BAU with Production Tax Credit (PTC) –Resource Expansion (based on economic analysis) – First Cut completed –We will not pursue further until we have new operational reliability tools available (discussed later) January 13,

Extreme Drought Scenario January 13, 2012 ERCOT is working with Sandia National Labs to develop a scenario that reflects the impact of a prolonged drought Sandia is anticipating having a final list of potential resources at risk by June 2012 We are also working with Sandia to reflect impacts to system load from drought conditions in this scenario 4

Renewable Resources Scenario To bound the analysis of potential grid impacts from future resources, we would like to include a scenario with a significant build-out of renewable resources. Expansion of renewable resources would likely result from: –Continuation of Production Tax Credit –Higher natural gas prices –National CO 2 tax –Renewable Portfolio Standards (RPS) (state or national) –or a combination of these or other factors. ERCOT staff will incorporate stakeholder input, develop a proposal for this scenario and send to the LTSTF list for comments. ERCOT has posted an RFP to obtain site specific, load correlated wind generation forecasts for existing and hypothetical sites (currently in contract negotiation) –It is expected we will use this data in wind modelling January 13,

Additional Scenarios ERCOT is working with the Demand-Side Working Group (DSWG) and the Emerging Technologies Working Group (ETWG) to develop one or two scenarios with a significant build-out of other system resources, including: –Demand response –Energy efficiency –Distributed generation –Energy storage (Compressed Air Energy Storage, pumped storage, batteries, etc.) In addition to these scenarios, ERCOT will continue to work with stakeholders to develop sensitivities (changing one input assumption in any given scenario) for further analysis. ERCOT will work with transmission owners to develop sensitivities that will indicate potential costs and benefits of using emerging transmission technologies to meet system needs. January 13,

Need for Ancillary Services Study Background LTS Certain scenarios studied as part of the LTS suggest the potential for dramatic changes to the future ERCOT resource mix. A complete evaluation of increasing proportions of non- traditional resources must consider the operational needs of the system to maintain adequate reliability. ERCOT is finalizing a Request for Proposal to procure one or more tools to determine the adequacy of a potential future resource mix to meet operational reliability requirements.

Divergent Resource Mixes by Scenario Future scenarios will include different mixes of resources –Some with specific availability profiles –With unique ramping capabilities –Each scenario must provide sufficient operator control to maintain adequate grid reliability LTS

Proposal Requirements ERCOT is seeking new tools to ensure that potential sets of resources can provide sufficient flexibility to meet the operational requirements to maintain grid reliability. ERCOT is open to considering a variety of potential solutions. However, the tool(s) must: –Allow the user to test scenarios with resource portfolios composed of increasing amounts of variable generation, energy storage devices, and demand side resources –Quantify the overall capability of the resources in each scenario to meet the reliability needs of grid operations –Quantify system needs and resource capabilities independent of the current set of ancillary service products LTSNovember 18 th, 2011

Schedule for Ancillary Services RFP Present concept to LTSF, DSWG, ETWG, and other stakeholders Finalize RFP document with stakeholder feedback by end of January, 2012 Post RFP on ERCOT.com Review proposals / select proposals LTSNovember 18 th, 2011

Emerging Resources ERCOT is compiling modeling data for: Demand Response resources Solar Wind Resources (including coastal wind) Storage Technologies (CAES, Battery, etc.) Energy Efficiency resources LTSTFJanuary 13, 2012

Modeling of Resources ERCOT has met with developers of various generation and storage technologies to discuss operational and financial characteristics –Wartsila (Spark Ignited Gas Engine) Currently operational in ERCOT at Pearall (STEC) and Steam (GEUS) –Compressed Air Energy Storage –Gravity Power (Underground Pump Storage) –Wind –Batteries –Solar We have yet to hear from solar generation developers Next slide contains a matrix of the modeling assumptions for these resources LTSTFJanuary 13, 2012

Matrix of Resources 13 January 13, 2012 ResourceWartsila 18.7 MW CAESGravity PowerWindSmall Solar PV Large Solar PV Capital Cost ($/kW in 2011$) $900 (vendor) $1,000 (vendor) $2,000 (EERE) $4,000 (2007$) (Austin Energy IRP Assumptions) $3,270 (2007$) (Austin Energy IRP Assumptions) PTC EligibleNo Yes Max Capacity (MW) Residential Varies Min Capacity (% of Max) 3.3%10%0% Heat Rate (btu/kWh) 8,0004,500N/A Variable O&M ($/MWh in 2011$) 6$4.00$0 Fixed O&M ($/kW- year in 2011$) 5$20.00$13.03$28.07$6.02 (2007$) OperationsQuickstart (5 minute to full load) Output for 16 hours and refill for 8 hours on a daily basis 4 hours of operation and then 5 hours to refill Intermittent Water UsageMinimal900 gallons per minute 26 million gallons for initial fill None

QUESTIONS? QUESTIONS/COMMENTS? January 13,

Reference Materials U.S. Department of Energy Energy Efficiency and Renewable Energy (EERE) – Austin Energy IRP Assumptions – askForce/docAssumptionsDocument pdfhttp:// askForce/docAssumptionsDocument pdf 15 January 13, 2012