KM3NeT ESFRI/PSE-WG meeting, 3 December 2013, Brussels Maarten de Jong & Paschal Coyle on behalf of KM3NeT 1 The next generation neutrino telescope in.

Slides:



Advertisements
Similar presentations
May 2009KM3NeT1 What is KM3NeT ? Future cubic-kilometre scale neutrino telescope in the Mediterranean Sea Exceeds Northern- hemisphere telescopes by factor.
Advertisements

Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
Governing Board for the Inkomati CMA Inaugural Meeting Planning 22 nd September 2005.
The KM3NeT Project  Objectives  Current membership and funding  Preparatory Phase  The EMSO connection  Structural funds ESFRI Meeting, Brussels,
Neutrino Astronomy with KM3NeT  The KM3NeT physics case  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards.
A. BELIAS, NESTOR Institute, Pylos, Greece TeVPA 2009, July 13-17, SLAC1 KM3NeT, a deep sea neutrino telescope in the Mediterranean Sea KM3NeT objectives.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
P. Sapienza, NOW 2010 The KM3NeT project  Introduction & Main objectives  The KM3NeT Technical Design Report  Telescope physics performance  New developments.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
Deep-sea neutrino telescopes Prof. dr. Maarten de Jong Nikhef / Leiden University.
KM3NeT IDM/TeVPA conference 23  28 June 2014, Amsterdam, the Netherlands Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
CHIPP Workshop on Detector R&D June - University of Geneva Common R&D for astroparticle physics: Activities of ApPEC and ASPERA Bernard Revaz and.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
KM3NeT The Birth of a Giant V. Popa, KM3NeT Collaboration Institute for Space Sciences, Magurele-Bucharest, Romania.
Hanoi, Aug. 6-12, 2006 Pascal Vernin 1 Antares Status report P.Vernin CEA Saclay, Dapnia On behalf of the Antares collaboration P.Vernin
Research Infrastructures in FP7 On behalf of : Anna Maria Johansson, Hervé Péro European Commission, DG RTD/B3 MarineERA workshop Feb
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Status of KM3NeT (Detector Design Optimisations) Christopher Naumann, CEA Saclay – IRFU / SPP for the KM3NeT consortium 44 th Reconcontres de Moriond,
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
The KM3NeT Preparatory Phase Project  Objectives  Current membership and funding  The Preparatory Phase project KM3NeT Meeting, Pylos, April 16, 2007.
The HEAP-MM proposal P. Piattelli VLVnT The call  INFRA Research Infrastructures for astroparticle physics: High energy cosmic rays,
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
Draft Collaboration Model for HLLHC-DS HLLHC-DS Meeting 20th July 2010.
Notur: - Grant f.o.m is 16.5 Mkr (was 21.7 Mkr) - No guarantees that funding will increase in Same level of operations maintained.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
KM3NeT International Solvay Institutes 27  29 May 2015, Brussels, Belgium. Maarten de Jong Astro-particle and Oscillations Research with Cosmics in the.
1 ASTRONET Coordinating strategic planning for European Astronomy.
Alexander Kappes Erlangen Centre for Astroparticle Physics for the ANTARES collaboration IAU GA, SpS 10, Rio de Janeiro, Aug Status of Neutrino.
Science Advisory Committee March 30, 2006 Jim Yeck IceCube Project Director IceCube Construction Progress.
EPOS where we are, where we go ! Massimo Cocco INGV Rome September EPOS Meeting.
Time over Threshold electronics for an underwater neutrino telescope G. Bourlis, A.G.Tsirigotis, S.E.Tzamarias Physics Laboratory, School of Science and.
The Square Kilometre Array Dr. Minh Huynh (International Centre for Radio Astronomy Research and SKA Program Development Office) Deputy International SKA.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
KM 3 Neutrino Telescope European deep-sea research infrastructure DANS – symposium Maarten de Jong.
WPC Status Report KM3NeT General Assembly, Catania, 22/2/2011 Paschal Coyle, CPPMarseille legal, governance, financial engineering and site issues of the.
Astroparticle Physics European Consortium What can large Astroparticle Physics projects like LAGUNA-LBNO expect from the new APPEC, the Astroparticle Physics.
STATUS AND PHYSICS GOALS OF KM3NET Paolo Piattelli P. Piattelli, ICHEP14 Valencia INFN – LNS, Catania (Italy)
Community Actions for Research Infrastructures Oslo, October 2010 Anna Maria Johansson, DG RTD Research Infrastructures.
Neutrino telescopes: ANTARES and KM3NeT Maarten de Jong Programme: Group composition (current): 6+2 staff, 4 post-doc, 4 PhD. Vidi 1, Veni 1+1.
Reply to SSC recommendations M. de Jong KM3NeT meeting Bologna, 5 October 2012.
Report to the ASC on project organization and critical issues E. Migneco ASC meeting, Amsterdam, march
Report from the Erlangen Meeting Uli Katz ECAP, Univ. Erlangen ANTARES collaboration meeting - KM3NeT day Bologna, 5. October 2012.
Antares/KM3NeT M. de Jong. Antares  2000NL joined collaboration (3.3 M€)  2006 ‒ 2008construction  2006 ‒ todaydata taking 24h/day  2012MoU signed.
Status report Els de Wolf Annual Meeting 2011, Nikhef.
Alexander Kappes ECAP, Universität Erlangen-Nürnberg for the KM3NeT Consortium 2009 EPS HEP, Krakow, 16. July 2009 The KM3NeT project: Towards a km 3 -scale.
KM3NeT Neutrino conference 2-7 June 2014, Boston, U.S.A. Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino telescope in.
2012 a year of transition Paschal Coyle, Mauro Taiuti, E. de Wolf IB-meeting, 29 January 2013, CPPM.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
KM3NeT P.Kooijman Universities of Amsterdam & Utrecht for the consortium.
KM3NeT multi-km3 neutrino telescope: perspectives
P.Kooijman, UVA-GRAPPA, UU, Nikhef
Concluding remarks E. Migneco
ACTRIS on the ESFRI Roadmap
Pasquale Migliozzi INFN Napoli
Marine and Environmental Agencies
Introduction WP 2 Legal Entity
Progress WP 2 Legal Entity
Widening the European Infrastructure for Social Science Data Archives
The KM3NeT Phase-1 Memorandum of Understanding
KM3NeT institute board meeting
KM3NeT: where are we and where do we go
Setting up an ERIC 11 May 2012 Richard Derksen
ASTRONET Coordinating strategic planning for European Astronomy
ACTRIS – EMEP, THE WAY FORWARD
Job de Kleuver NWO-I/APPEC
CONSTITUENT BODY REFORM (CBR)
Presentation transcript:

KM3NeT ESFRI/PSE-WG meeting, 3 December 2013, Brussels Maarten de Jong & Paschal Coyle on behalf of KM3NeT 1 The next generation neutrino telescope in the Mediterranean

Introduction Discovery and subsequent observation of high-energy neutrino sources in Universe – interface between astrophysics and particle physics pillar of multi-messenger approach – synergy with Earth & Sea sciences 2 KM3NeT is a new Research Infrastructure – cabled network of neutrino telescopes – located in deep waters of Mediterranean Sea

Multi-messenger astronomy 3 p, He,..  ? cosmic rays gamma rays neutrinos – Supernova Remnants – Active Galactic Nuclei – Gamma-Ray Bursts –... !

KM3NeT Architecture 4 neutrino telescope shore station remote access to data remote operation onoff computer center

Technology (I) 5 ~ 600 m Optical module Launcher vehicle ‒31 x 3” PMTs ‒low-power HV ‒LED & piezo inside ‒FPGA readout ‒DWDM ‒rapid deployment ‒autonomous unfurling ‒recoverable

Technology (II) 6 Multiplicity Rate [Hz] PMT orientation [deg.] Atmospheric muons + data (M ≥ 7) Atmospheric muons K40 random coincidences + data Rate [a.u.] photon counting directionality

Costs (I)  Total investment 220–250 M€ – stable since ESFRI roadmap (2006) and conform with TDR – includes contingency of 10%, provided no VAT – actual prices conform with cost model  Operational costs << 5% of total investment per year – conform with ESFRI roadmap update and TDR  Personnel – conform with TDR  Operation – ≥ 10 years 7

Costs (II) € KM3NeT string ~ ¼ of € Antares string 8

Site Before:One large Research Infrastructure interest from France, Italy and Greece to host complete infrastructure Now:Strong case for distributed Research Infrastructure agreement that France, Italy and Greece host part of infrastructure 9 “Advantage of additional funds and human resources resulting from using the three available sites significantly outweighs any financial or scientific advantage from using one of the sites.”

Organisation (I)  EU funded Design Study 2006–2009 – Conceptual Design Report – Technical Design Report  EU funded Preparatory Phase 2008–2012 – Administrative Standing Committee endorsed technology decision supported phase-1 – Scientific Standing Committee review science & technology 10 Technology Governance Site decision

Organisation (II)  KM3NeT phase-1January2013 established collaboration – 40 institutes, more than 220 persons elected central management set up project organisation – prototyping, cost review, planning, QA/QC drafted Memorandum of Understanding – investments, facilities, human resources, access policy set up Resources Review Board set up Scientific & Technical Advisory Committee December

12 Spending profile phase-1 (I) spent/committed ≤ 2013 itemcosts [M€] R&D3,750 Infrastructure-Fr4,850 Infrastructure-It8,805 Deployments1,950 Total19,355

Spending profile phase-1 (II) 13  expenditures [M€] months prototyping string1 string2–25 string26–31 total

Construction schedule phase-1 14 months strings ¶ in string-equivalent units integrated modules ¶ integrated strings installed strings

Phased implementation 15 Phase Total costs [M€] Primary deliverable 131 Proof of feasibility of network of distributed neutrino telescopes 1.580–90 Measurement of neutrino signal reported by IceCube 2220–250Neutrino astronomy

ERIC establishes KM3NeT as a legal entity – streamline procurement and financial management – avoid VAT for total investment collaboration agreed to host ERIC in the Netherlands – Amsterdam Science Park is ideal Resources Review Board supports ERIC for phase 1.5 – start process when phase-1 is positively reviewed (i.e. before it is completed) 16

Funding requests (I) France – 25 M€ (ERDF + national + local) to be matched with 25 M€ from other countries Greece – 54.7 M€ (ERDF) construction of neutrino telescope at Pylos site Italy – 10 M€/year between 2015–2019 (national) part of upgrade program of existing Research Infrastructures in less favoured regions 17

Funding requests (II) the Netherlands – announced future request for 4.3 M€ (national) construction, real-time computing, T-sensor array Romania – ? M€ (national) intention to set up production line for optical modules (negotiations on-going) Interest from groups in Germany, Spain and UK – no requests in near future 18

Global Neutrino Network MoU signed by KM3NeT 19

20

Replies (I) 1.Engage with funding agencies and governments; Likelihood and timetable for funding versus phase-1; VAT. – MoU phase-1 submitted to Resources Review Board – preparation of funding request on-going – invited to submit Letter of Intent for phase-1.5 – VAT exempt for hardware deployed in deep-sea 2.Governance structure; Earth & Sea sciences. – preferred governance structure compliant with ASPERA guidelines and successfully applied in Antares – Earth & Sea sciences membership (full or observer) MoU foreseen with ESS institutes and/or EMSO 21

Replies (II) 3.Management; Cooperation between groups; Consensus-building path. – established single collaboration with central management – major decisions taken (sites, technology, governance, etc.) 4.Three sites versus management plan; ERIC & Procurement. – evaluated merits of single versus multi-site three sites solution is favoured by funding and human resources – management plan phase-1 exist site managers are member of central management team – ERIC will be pursued for next phases facilitates procurement avoid VAT for total investment 22

Replies (III) 5.Ethics Board; Impact marine environment. – role and implementation defined in MoU Annex 4 – environmental impact studies made conclusions: no significant impact – decommissioning costs worked out financed through common fund 6.Cost review; Structural funds versus project management. – costs reviewed actual prices conform cost estimates – significant fraction of available budget spent or committed and various tenders on-going 23

Replies (IV) 7.Resources Review Board; Scientific and Technical Advisory Committee. – RRB and STAC are in place first meetings on 18 and 19 November 2013, respectively precursor of RRB existed since Preparatory Phase (ASC) 8.Activity plans; Budgets; KPI; Earth & Sea sciences. – viable long-term plan with KPIs exists for neutrino astronomy budgets committed – recent observation by IceCube consolidates field of research – synergy with Earth & Sea sciences have exploratory nature 24

Replies (V) 9.KM3NeT – EMSO. – formalisation of already active collaboration started memberships defined MoU prepared 25