Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010.

Slides:



Advertisements
Similar presentations
SPRINGETTSBURY TOWNSHIP.
Advertisements

Advanced Wastewater Treatment Plants.
Newcastle Water Pollution Control Plant
Wastewater Management at an Animal Protein Rendering Facility J.B. Hess, W.A. Dozier, J. Spann and B. Thomas Poultry Science Department, Auburn University.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to American #2 Wastewater Treatment Plant.
Virtual Tour of Municipal Wastewater Treatment Plant (WWTP) Prepared by Dr. Richard O. Mines, Jr., P.E. Mercer University Environmental Engineering Department.
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Located in Exmoor National Park, with nearby bathing beach 3800 population equivalent (summer) 1900 m 3 /d flow to full treatment Sewage feed started 12th.
Biological waste water treatment
The Town of Discovery Bay Community Services District Wastewater Treatment Plant Master Plan NOVEMBER 9, 2011.
Tertiary Treatment: Nutrient Removal, Solids Removal, and Disinfection.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
Innovative Tools for Energy Savings T. Allbaugh, P.E., S. J. Kang, Ph.D., P.E., K. Williams, P.E., W. Kramer, P.E., G. Jones, P.E., K. P. Olmstead, Ph.D.,
Genesee County Drain Commissioner Water and Waste Services Division District #3 Linden WWTP Digester Improvements Project, Phase I Joe Goergen, GCDC -
Upgrade of Sana'a WWTP1 Upgrade of the Sana‘a Wastewater Treatment Plant Presentation of the Design Implementation of the New Preliminary Wastewater.
Nitrification and Denitrification
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates October 14, 2014 West Point Wastewater Treatment Plant, Seattle.
GALENA WASTEWATER TREATMENT UPGRADES Informational Presentation for the Sassafras River Association Presented by Ryan J. Rangel, PE April 23, 2015.
Wastewater Treatment & Collection System Improvements.
Municipal Wastewater Treatment Preliminary Seventh Power Plan Energy Efficiency Estimates November 18, 2014 West Point Wastewater Treatment Plant, Seattle.
ROTATING BIOLOGICAL CONTACTOR (RBC) PROCESS
WASTE WATER TREATMENT FOR RITONAVIR PRODUCTION PLANT Presented by Wang Dong Mei July 8, 2000.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
7.1 Wastewater Treatment Process
Water Purification and Sewage Treatment
Municipal Wastewater Efficiency Improvements Potential Savings for the 6 th Power Plan September 30, 2008 Regional Technical Forum South Treatment Plant.
Wastewater Treatment Plant Overview Adapted from May 2009 presentation UIUC Researchers: Poust, Somers, Poole.
History In 1932 Plymouth constructed its first wastewater treatment plant In 1959 they transferred the sewage utilities over to Plymouth Utilities.
Biology: November 5th, 2008 Objectives: Things to do: Due Dates:
Moving Bed Biofilm Reactor Retrofit for Ammonia and Nitrate Removal
Pennsylvania Water Environment Federation PennTEC Annual Technical Conference June 4, 2013 Altoona Westerly Wastewater Treatment Facility BNR Conversion.
Overview of AIRE-O2 Triton® Technology
March 31st and April 1st, 2009Mile High Industrial and Automation Conference The Challenges in Upgrading Plant Automation for an Existing Wastewater Treatment.
Retro-Fit Denitrification for Small Wastewater Treatment Facilities
Water Waste Treatment.
Water Treatment Chapter 11. Sewage Treatment Rationale More than 500 pathogenic bacteria, viruses, and parasites can travel from human or animal excrement.
Sewage Treatment.
Environmental Engineering (Wastewater treatment) Core Course Laboratory of Environmental Engineering & Planning Department of Civil Engineering Aristotle.
Construction OF AMMONIA REMOVAL UPGRADES FOR FIRST BROAD RIVER WWTP
CEE 426 October :05 PM UW Madison Room 1209 Engineering Hall
LOW D.O. OPERATION: EFFECTS ON BIOLOGICAL PHOSPHORUS REMOVAL, OXYGEN TRANSFER EFFICIENCY, DENITRIFICATION, AND ENERGY SAVINGS.
1 Wastewater Treatment Processes Jae K. Park, Professor University of Wisconsin-Madison.
Presentation by Chelsea Smith March 11, My Background Southern Wells (K-12) Graduated in 2010 Ball State University ( ) BS in Environmental.
COMPARISON OF MBBR AND Suspended growth BNR Performance at the HRWTF
Electricity | Natural Gas | Water | Wastewater Adding Whey for Denitrification Dale Adams, P.E Managing Engineer, Colorado Springs Utilities September.
1 JCI 1 1 Energy can be neither created nor destroyed, but only converted from one form to another. First Law of Thermodynamics Karl Friedrich Mohr In.
© 2014 Evoqua Water Technologies LLC INTRODUCING THE CAPTIVATOR George Smith; Director of Biological Processes.
Tools to Control Energy Use through O&M Practices Wastewater/Water Sustainable Energy Cohort, October 11, 2012 Presentation by Walt Mintkeski, P.E.
OPERATIONAL OPTIMIZATION 2013 KY/TN WEA Management Conference M. Shannon Lambert, P.E. PRESENTED BY:
Aeration System Opportunities Dave Reardon, PE, ENV SP HDR National Director - Water Sustainability WW/W Sustainable Energy Cohort-Session 5 January 31,
Course TEN-702 Industrial waste management unit-2 Lecture -8 & 9.
Membrane Bioreactors for Wastewater Treatment.
2011 WCW Conference. Fort McMurray James Sacker, Director Environmental Hugh Crawford, Wastewater Supervisor Plant Operations staff Alberta Environment.
WATER MANAGEMENT.
Welcome to the Key Largo Wastewater Treatment Plant.
Welcome to American-Bath Wastewater Treatment Plant.
Process & Equipment – ECM’s
Chapter 7 - Fundamentals of Biological Treatment
Modified Ludzack-Ettinger Wastewater Plant
Preliminary Treatment Removing Large Solids Material by Raking & Screening REMOVES 1.
Lecture (8): liquid wastes treatment (primary, vital, advanced).
Wastewater Treatment Dr.Gulve R.M..
Water treatment Potable water…water that is drinkable; safe for consumption Drinking water treatment is widespread in developed countries today However,
Wastewater Facilities Upgrade Project
________________________________________________________________
Nitrogen Removal University of Kansas
Advanced Wastewater Treatment
Presentation transcript:

Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010

Project Background Current treatment plant built in the early 70’s Headworks, manual 1 ½” bar screen, grit removal system has not been operation for 25 years. Freezing at headworks during winter months.

Project Background Aeration basin 2 inoperable due to failed air header, failing air header and extensive weed growth the in grit and sludge in basin. Fine bubble diffuser in aeration basins and underground sludge storage tank added in 1992 Aeration basin 3 and clarifier added in 1995 for addition BOD capacity.

Project Background (3) 150Hp Hoffman blowers for 3 aeration basins. No auto controls on blowers to track D.O. Blowers and motors were in needed new bearings. Aeration basin 3 utilized existing blower designed for basin 1/3 its size. (2) 75hp centrifugal blowers were used on the aerobic digester, no timer or automated controls.

Project Background Centrifugal wasting pumps held together with wooden wedges, pumped 50gpm above rated capacity. Centrifugal sludge transfer pumps were unable to move thickened sludge over 3% solids. Significant Industrial flow from Perrigo Corporation with no pretreatment other than pH adjustment.

Project Goals/Constraints Rehabilitate/replace existing process equipment Modify/improve activated sludge process to improve performance, increase efficiency and add organic treatment capacity for Perrigo Accomplish improvements on existing site which is surrounded by floodplain, old municipal dump and Rockwell Superfund site (utilize existing tankage or build structures primarily above grade).

Aeration Energy Efficiencies 1. Diffusers  Replaced fine bubble diffusers with new, more efficient diffusers in aeration basins 1 and 2.

Aeration Energy Efficiencies Energy Savings from Diffuser Replacement

Aeration Energy Efficiencies Energy Savings from Diffuser Replacement

Aeration Energy Efficiencies Energy Savings from Diffuser Replacement

Aeration Energy Efficiencies 2. Sensors  Dissolved oxygen sensors were installed at the end of aeration tanks 1 and 2 to provide automatic feedback/control of blower inlet valves based on operator set D.O. control point.

Aeration Energy Efficiencies Design Point: 114 HP Operating Point: 70 HP Energy Savings from Automatic Blower Control  Savings of just over $5,000/yr for every 10 HP reduced

Aeration Energy Efficiencies 3. Biological Nitrogen Removal  If nitrification is occurring in the aeration basins, nitrates (NO3) can be returned to the anoxic zone (no or low dissolved oxygen).  Bugs utilize oxygen in nitrates.  Nitrogen (N2) is released as a gas and oxygen needs are reduced in aeration basin.

Aeration Energy Efficiencies Basin configuration made returning nitrates very simple, and anoxic zone was already in place due to new divider wall. External carbon source is sometimes required (in addition to raw sewage) for de-nitrification reaction to be optimal.

Aeration Energy Efficiencies We may not optimize this process, just get some added benefit at a low up- front cost. After system is more fully loaded will test BNR process to determine if further optimization is desired.

Septage/Treatment Energy Efficiency Mix septage in aerated tank with waste-activated sludge. Pump contents to sludge storage tank. Decant from sludge tank back to liquid end of plant is treated in liquid process. Load to the aeration system is reduced due to less flow and lower organic loading.

Septage/Treatment Energy Efficiency Energy Savings from Septage Treatment System  Sludge Decant: 140 mg/l CBOD  Septage: 4,550 mg/l CBOD  Estimated Annual Septage: 3,000,000 gallons

Miscellaneous Efficiencies Biological phosphorus removal system results in less sludge produced (less chemical deliveries). Automatic flow control system for high flows routes flows to either the EQ tank or aeration tank 3 (standby tank) to maintain treatment efficiency of main treatment tanks.

Miscellaneous Efficiencies New Headworks  ¼” automatic fine screen  Self-cleaning wet well  High efficiency grit removal

Miscellaneous Efficiencies New clarifiers with energy dissipating influent well and stamford baffles New RAS pumps with VFDs

Miscellaneous Efficiencies Replaced gaseous chlorine disinfection system with Ultraviolet Disinfection (no more chlorine gas or sodium bisulfite deliveries).

Building Systems Efficiencies New natural gas fed Pulse Boiler Indoor lighting  Replaced all fluorescent bulbs (T12 to T8)  Occupancy sensors installed in new areas of building  Option to control multiple bulbs in each fixture Outdoor lighting  Replace mercury vapor lights with 2 stage induction lighting with motion detector (10 pole mounted fixtures)

Treatment Results Average effluent results:  CBOD: 8 mg/l  SS: 17 mg/l  T. Phos..6 mg/l Septage receiving:  250,000 gallons per month  CBOD: 4,500 mg/l  SS: 20,000 mg/l Decant from aerated sludge storage:  CBOD: 140 mg/l  SS: 218 mg/l

Operational Efficiencies New SCADA system provides full automation of plant  Automatic sludge wasting  Automatic sludge pumping  PD Sludge Blower control  UV control pacing  Automated headworks (fine screen control, grit collection, raw sewage pumps) Personnel requirements  More duties (e.g. septage operation), less personnel  1990’s: total of 5 staff  Present: total of 3 (possibly 4) staff

Original POTW Found The wastewater plant that was built in the 1930’s was located during construction. It was supposed to have been removed and filled.

Increasing Energy Efficiency at the Allegan WWTP MWEA/AWWA Joint Annual Conference August 19, 2010