Design Phase Coordination and the Regional Environmental Coordinator’s Role.

Slides:



Advertisements
Similar presentations
1 FM 2499 From: Spinks Road To: FM 1171 PUBLIC HEARING November 16, 2004.
Advertisements

Implement Wy-Kan-Ush-Mi Wa-Kish- Wit Watershed Assessment and Restoration Plan Now A Regional Support Program Sponsored by the Columbia River Inter-Tribal.
NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT Environmental Impact Statement and Preliminary Engineering Public Scoping Meeting Tuesday, November 15, 2011,
Environmental Scoping Guidance Jerry Vogt Region Environmental Coordinator ODOT – Region 3.
Ecological Survey Reports The level of ESR Report is determined by the type of project and its probable level of impacts.
NEW PROGRAMMATIC CATEGORICAL EXCLUSION AGREEMENT A WORK IN PROGRESS… ODOT—Office of Environmental Services Environmental Update Meeting20 November 2014.
Lesson 3 ODOT Analysis & Assessment. Analysis & Assessment Learning Outcomes As part of a small group, apply the two- part analysis by generating exposure-
NEPA Environmental Procedure Pam Truitt, Grants Management Consultant  September 4, 2014.
HUD Environmental Review Requirements November 30,2010.
NEPA and Property Acquisition May 19, 2014 Elizabeth Patel Environmental Protection Specialist FTA Office of Planning and Environment.
1 Planning and Environment Linkages: Case Studies Michael Culp and John Humeston FHWA November 2, 2006.
Proposed Replacement of the Herbert C. Bonner Bridge (Bridge No. 11) on NC 12 over Oregon Inlet TIP Project No. B-2500 Citizens Informational Workshops.
Environmental Assessment Public Meeting
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Connecticut Department of Transportation Bureau of Policy & Planning.
Most Common Conservation Practices Forestry Illinois.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Programmatic Environmental Impact Statement Experimental Permits COMSTAC Stacey M. Zee October 25, 2006 Federal Aviation Administration.
Our mission ead and execute environmental programs and provide expertise that enables Army training, operations, acquisition and sustainable military communities.
Ecosystem Vulnerability Profile. Ecosystem Resources Vulnerability Profile What values and benefits do natural resources provide? What natural resources.
Page CDBG Recipients' Workshop Community Finance Division NEPA Environmental Procedures.
Highway 169 Phase 2 (Part 2) – Cross Range Expressway April 30, 2014 Public Information Meeting Taconite Community Center.
West Texas Legislative Summit ENVIRONMENTAL ISSUES Environmental Regulations Affecting Transportation Carlos Swonke Director, Environmental Affairs Division.
CE 515 Railroad Engineering Environmental Regulations and Permitting Source: AREMA Ch. 11 “Transportation exists to conquer space and time -”
Christine Krall, SW Region Environmental Winter 2015.
OSU Airport – Overview of Master Plan and Draft Environmental Assessment Purpose of an Airport Environmental Assessment (EA) Identify environmental impacts.
Financing Renewable Energy Projects OVERVIEW OF PROJECT DEVELOPMENT ISSUES 5 June 2014 Tony Colonnese Director of Engineering Services.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Completing the NEPA Process for CatEx Projects: Part 3 to CE Closeout.
Alkali Creek Road Slope Stabilization and Stream Relocation The project scope changed after major rainfall caused slope failure jeopardizing safety and.
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
SL Village Hall June 24, 2002 Village of Freeport, New York Freeport Electric Village of Freeport, New York Freeport Electric.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Construction Report November 17, Projects Site Improvements –In close out Track replacement and turf –Last phase (track) Generators –In close.
Construction Report December 8, Projects Track replacement and turf In Progress Walking tracks: Redesign Water wells January 2010 Bleachers January.
I-90 Snoqualmie Pass East Project Tanya Lamb Urban Geography, GEOG 481 Description 15-mile stretch Hyak (MP 55.1) to Easton (MP 70.3) 2010 scheduled to.
Integrating Other Laws into BLM Planning. Objectives Integrate legal requirements into the planning process. Discuss laws with review and consultation.
Number of Copies Agency Submissions & Comments. Coordination ESRs are reviewed by OES and coordinated with resource agencies as part of the NEPA review.
1 Environmental Planning and Historic Preservation (EHP) Compliance (p ) EHP Compliance.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
May 5, 2007 AASHTO Standing Committee on Highways.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
U.S. Army Corps of Engineers Inter-Agency Coordination BLM PILOT VERNAL & GLENWOOD SPRINGS U.S. Army Corps of Engineers & U.S. Bureau of Land.
CORPS OF ENGINEERS REGULATORY PROGRAM PUBLIC INTEREST REVIEW (33 CFR Part 320) August 12, 2005.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
REMOTE SENSING and the CSX RAIL RELOCATION EIS NCRST-E GICAP 2002 Workshop Session 3.
State Route 109 (Portland Bypass) Robertson & Sumner County, TN NEPA Public Hearing November 12, 2015.
24 August 2007 EDR Effort 1 CF&S Environmental Process for an Americas Regional Effort EDR Planning Jerry Aarons & Rod Walton.
LBNE Environmental Assessment NEPA Informational Meeting May 23, 2013 Rod Walton, LBNE NEPA Manager.
U.S. Section International Boundary and Water Commission Rio Grande and Tijuana River Flood Control Projects Programmatic EIS.
White Hill Middle School Initial Study/Mitigated Negative Declaration Ross Valley School District Community Meeting November 1, 2011.
BROOKS BRIDGE REPLACEMENT STUDY February 18, 2016 Project Briefing for Presenters: April Williams, P.E. (FDOT Project Manager) Steve Schnell, AICP (HDR.
Prepared by: Alex Fisch Planning Services Division.
Economic Development Forum The Georgia Allies GRAD Site Program Randy Cardoza Managing Director, Economic Development, AGL Resources, representing the.
1 Demystifying Environmental and Historic Preservation (EHP) Compliance EHP Compliance.
State Route 28/U.S. Highway Route 127 Improvements Project Fentress County, Tennessee Public Hearing March 15, 2011 South Fentress Elementary School 5018.
S.R. 30A / U.S. 98 / Panama City Beach Parkway Project Development & Environment (PD&E) Study F ROM M ANDY L ANE TO T HOMAS D RIVE I NTERSECTION B AY C.
Nick Hines, CEP Natural Resource Supervisor WYDOT Local Public Agency guide to getting through NEPA.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
CE 360Dr SaMeH1 Environmental Eng. 1 (CE 360) Associate Professor of Environmental Eng. Civil Engineering Department Engineering College Majma’ah University.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
CONSERVATION AND RESOURSE PROTECTION GRANT PROGRAM NEVADA DIVISION OF STATE LANDS Question 1.
Proven Management – Proven Gold Districts – Safe Jurisdictions Symbol:PG Exchange:TSX Hardrock Project Environmental.
U.S. Fish and Wildlife Service Migratory Bird Program Conserving America’s Birds Addressing Migratory Birds in NEPA Migratory Bird Conservation for Federal.
ASH ENV 333 W EEK 5 F INAL P APER Check this A+ tutorial guideline at paper For more classes.
ACA Conference - September 2017
Social impacts and coastal louisiana
Construction Management & Inspection
Wakulla County Airport
Presentation transcript:

Design Phase Coordination and the Regional Environmental Coordinator’s Role

Environmental Document Types Environmental Document Example Project Environmental Impact Statement (EIS)New Alignment/Hwy. Relocation Environmental Assessment (EA)Addition of Lanes Environmental Report (ER)Minor Realignment Programmatic Environmental Report (pER)Mill and Overlay Categorical Exclusion (CE)Painting Centerline The complexity of the project dictates the type of Environmental Document.

INVESTIGATION

Initiate Data Gathering…

…which is incorporated into an environmental document

WHAT Environmental Analyses does WisDOT complete?  Natural Environment  Physical Environment  Socio-Economic  Cultural Environment

WHAT Environmental Analyses does WisDOT complete?  Natural Environment  Physical Environment  Socio-Economic  Cultural Environment

NATURAL ENVIRONMENT Factors WisDOT Considers  Wetlands  Rivers, Streams and Floodplains  Lakes and Other Open Water  Groundwater, Wells and Springs  Upland Wildlife and Habitat  Coastal Zones  Threatened/Endangered Species

WHAT Environmental Analyses does WisDOT complete?  Natural Environment  Physical Environment  Socio-Economic  Cultural Environment

PHYSICAL ENVIRONMENT Factors WisDOT Considers  Air Quality  Construction Stage Sound Quality  Traffic Noise  Hazardous Substances or Contamination  Erosion Control  Storm water Management

WHAT Environmental Analyses does WisDOT complete?  Natural Environment  Physical Environment  Socio-Economic  Cultural Environment

SOCIO-ECONOMIC Factors WisDOT Considers  General Economics  Community and Residential  Economic Development and Business  Agriculture  Environmental Justice  Indirect and Cumulative Effects

WHAT Environmental Analyses does WisDOT complete?  Natural Environment  Physical Environment  Socio-Economic  Cultural Environment

CULTURAL ENVIRONMENT Factors WisDOT Considers  Unique Lands  Aesthetics  Historic Resources  Archaeological Resources  Tribal Issues

4500* CULTURAL ENVIRONMENT WisDOT Considerations * Pertains to only IH, USH, & STH system

CULTURAL ENVIRONMENT WisDOT Policy/Guidance FDM 26

CULTURAL ENVIRONMENT Questions ? Jim Becker

DETERMINATION

FINAL DESIGN

Actions (if applicable) during Final Design:  Purchase Right-of-Way  Reevaluate Traffic Noise Analysis  Prepare Structure Survey Report & Submit Plan to DNR for review  Request 401 Water Quality Certification/Final Concurrence from DNR  Submit 404 Permit application to USACE  Complete Railroad crossing design report  Coordinate for utility adjustment of facilities

PRE-CONTRACT ADMINISTRATION

We need to work together!