Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013.

Slides:



Advertisements
Similar presentations
Green Impacts of Public Transportation on our Communities Help Florida Turn the Corner with Transit.
Advertisements

Minnesota Passenger Rail Presentation Transportation Finance Advisory Committee presented by: Mn/DOTs Passenger Rail Office May 18, 2012.
2010 Minnesota Comprehensive Statewide Freight and Passenger Rail Plan February 2010 presented by: Minnesota Department of Transportation and Cambridge.
Monterey Branch Line Association of Environmental Professionals and American Planning Association July 28, 2010.
John Barton, P.E. Assistant Executive Director for Engineering Operations Texas Department of Transportation Mid-States Highway-Rail Safety Conference.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
First Statewide Comprehensive Rail Plan for MN Commissioned by 2008 Legislature Compliant with 2008 PRIIA Federal Rules 6 Months to prepare, 10 Months.
OHIO & LAKE ERIE REGIONAL RAIL CLEVELAND HUB STUDY Ohio Rail Development Commission TMACOG Annual Transportation Summit September 29, 2003.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
High-Speed Rail for California
Passenger Rail – Plan & Opportunities Engineer Contractor Conference Middleton, WI January 21, 2010.
1 Passenger Rail Solutions – Balanced Approach 2009 Ark-La-Tex Rail Summit May 9, 2009 – Marshall, TX Joe Adams, Vice President – Public Affairs.
1 SCORT 2010 September 21, 2010 David Valenstein Federal Railroad Administration State Rail Planning.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
A TRANSFORMATIVE INVESTMENT IN CALIFORNIA’S FUTURE Dan Richard, Chair California Passenger Rail Summit April 29, 2015 Sacramento, CA.
ACEforward The new regional initiative to improve our connection between the Central Valley and the Bay Area.
Transportation System Issues and Challenges
Title Slide California High Speed Rail Authority Board Meeting September 28, 2005.
Randy Wade TRB Intercity Passenger Rail Committee Tuesday January 25, 2011 Washington, DC.
California State Rail Plan Overview Presentation Tribal Informational Meeting – March 1,
M IAMI F ORT L AUDERDALE W EST P ALM B EACH O RLANDO Addresses Florida’s demand for express, intercity rail travel. Is designed to serve tourists, business.
November 7, 2012 DUMBARTON RAIL CORRIDOR PROJECT.
Jason Hade, Regional Planner Kern COG Workshop – November 21, 2002 High-Speed Rail for the Kern Region Kern Council of Governments.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Caltrain Modernization Program Update Palo Alto City Council Rail Committee August 10, 2012.
Anaheim – Los Angeles Project EIR/EIS California High-Speed Rail Authority HIGH-SPEED TRAINS IN SOUTHERN CALIFORNIA Orange County Business Council- Infrastructure.
Caltrain Modernization Program CA Passenger Rail Summit April 29, 2015.
Caltrain Modernization CMAA September 18, Caltrain Today.
1 Welcome! West Valley-Taylorsville Transit Corridor Draft Environmental Impact Statement Public Open House/Hearing July 19, 2006.
Southeast Michigan Council of Governments. Ann Arbor –Detroit Regional Rail Project Update April 27, 2010.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
1 CALIFORNIA HIGH-SPEED RAIL Silicon Valley Leadership Group February 5, 2014 eBay, San Jose P R E S E N T E D B Y Ben Tripousis Northern California Regional.
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
Large Starts Issues for the Notice of Proposed Rulemaking New Starts/Small Starts Listening Session and Seminar San Francisco, CA February 15-16, 2006.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting March 28, 2006 Item No. xx Supp. Meeting.
Intercity Rail Background/ Statewide Freight and Passenger Rail Plan Update Met Council TAC Meeting November 5, 2008.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
May 25, 2010 Wisconsin High Speed Intercity Passenger Rail From vision to reality MADISON COMMUNITY MEETING John Oimoen, High Speed Passenger Rail Program.
San Francisco Mayor’s 2030 Transportation Task Force Current & Near Term Transportation Plans April 30, 2013.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
California High-Speed Train Project California High-Speed Rail Metro Bus Operations Subcommittee January 2010.
1 Round One Public Outreach Workshops Fall 2005 DRAFT Bay Area Regional Rail Plan August 2007 Workshops.
1 DESTINATION 2030 Update KRCC TransPol and TransTac Meeting Scoping Results Criteria Alternatives May 22, 2008.
1 High-Speed Rail Evaluation October 12, 2007 Planning Committee.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Policy and Staff Briefing March 14, 2006 Item No. xx Supp.
2014 Program Priorities January 23, Outline Major 2014 Goals 2013 Accomplishments Major 2014 Activities Partnerships 2.
1 Round One Public Outreach Workshops Fall 2005 Presented to: Women’s Transportation Seminar 2007 Annual Conference May 2, 2007 Presented by: Therese McMillan.
Impact of the California High Speed Rail System Lee Ann Eager, Chief Operating Officer Economic Development Corporation serving Fresno County.
CHSRA SMALL AND DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Society of American Military Engineers (SAME) Thursday, November 8, 2012.
Overview Presentation Fall 2015 Gainesville-Haymarket Extension Study.
Regional Transportation Investments: Alaskan Way Viaduct / Seawall Port of Seattle Commission Meeting November 8, 2005?? Item No. xx Supp. Meeting Date:
Nathan Smith Co-Project Manager California State Rail Plan March 7, 2012.
Chicago – St. Louis High Speed Rail Program July 9, 2015
Federal Consistency Certification Sorrento To Miramar Double Track - Phase 1.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
Commuter Rail Studies Summary of MAG High Capacity Transit Study June 2003 Commuter Rail Summary.
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
Intercity Passenger Rail: Legislative Policy Recommendations Astrid Glynn Chair ASC Intercity Passenger Rail Legislative Team AASHTO Standing Committee.
Regional Roads Committee
Willow Meadows Civic Club Meeting September 13, 2011
Michigan Update Michigan Association of Rail Passengers
Metro Railway How it began
Tampa Historic Streetcar, Inc. May 16, 2018
Capital Programming Committee South Coast Rail Phase 1 Service
Central Corridor - Light Rail Transit Metropolitan Council
Chicago to Council Bluffs-Omaha
Project Update July 2018 through January 2019.
Presentation transcript:

Corridor Electrification Environmental Process SVLG Transportation Committee January 9, 2013

Context 2

Peninsula Vision Blended System Concept –Electrify / Upgrade railroad –Maximize use of existing tracks –Caltrain and HSR on shared tracks –Support freight and other passenger services Key Benefits –Minimize community impact –Lower project cost –Advance project delivery 3

Operational Analysis (LTK Engineering) Blended system concept has merit Capacity: Up to 10 trains / hour / direction Speed: Up to 79mph and 110mph # of TrainsWithout Passing Tracks With Passing Tracks Caltrain 66 HSR 24 4

Regional 9 Party Funding MOU Blended System Commitment 1 st Incremental Investment – $1.5 billion for Corridor Electrification – $705 million from HSR State Bond – Remainder from other local, regional, state and federal sources – Caltrain electric service by 2019 Future Incremental Investments – Projects and funding TBD – Blended HSR service by

Environmental Process 6

Project:Advanced Signals (PTC/CBOSS) Environmental DocumentCategorical Exemption/Categorical Exclusion Lead Agencies: Caltrain and FTA Environmental Schedule: Completed Project In-Service Date: 2015 Project:Corridor Electrification (6 Caltrain per peak hour = “6-0”) Environmental DocumentEnvironmental Impact Report,/Environmental Assessment Lead Agencies: Caltrain and FTA Environmental Schedule: Project In-Service Date: 2019 Project:Blended Service (6 Caltrain + Up to 4 High-Speed Rail = “6 + up to 4”) Environmental DocumentEnvironmental Impact Report/Environmental Impact Statement Lead Agencies: CHSRA and FRA Environmental Schedule: TBD Project In-Service Date: 2026/2029 Corridor Improvement Plan: Environmental Process Sequencing 7

Electrification Environmental Clearance Distance: 51 miles (San Francisco to Tamien) Speed: Up to 79 mph Service: 6 trains / ph / pd Infrastructure / Vehicles – Poles and Wires (OCS) – Traction Power Facilities (TPF) – Electric Powered Vehicles (EMU) 8

Cumulative Analysis For future anticipated / related projects Key projects: – MTC Regional Transportation Plan – Blended Service (Up to 2 and 4 HSR trains) – SF Downtown Extension – Local Development Plans 9

Simulation: Main Line 10

Simulation: At Station 11

Simulation: At Station 12

Simulation: Traction Power Station 13

Positive Environmental Impacts Regional congestion Energy consumption Air pollutants Greenhouse gas emissions Noise Vibration 14

Environmental Impact Issues Noise Traffic Visual Aesthetics Land Use Compatibility Other CEQA/NEPA Subjects Cumulative Impacts 15

January/February 2013Public Scoping Fall/Winter 2013Draft EIR/EA Spring/Summer 2014Final EIR/EA Summer/Fall 2014 Project Approval Key Schedule Milestones 16

Q & A 17