Impact of Feed in Tariff (FiT) on RE Power Generation 22 April 2014 Residence Hotel Uniten Ir Dr Ali Askar Sher Mohamad COO SEDA Malaysia.

Slides:



Advertisements
Similar presentations
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
Advertisements

Financing Renewable Energy: an introduction to FITs and RHI Andrej Miller Renewable Financial Incentives Office of Renewable Energy Deployment
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
Energy. oil and natural gas  supply 62% all energy consumed worldwide  how to transition to new sources?  use until mc of further use exceeds mc of.
October 16, 2013 Feed In Tariff (FIT) and Renewables Procurement in Ontario Dirk van de Waal – Business Analyst, Renewables Procurement.
Renewable Energy Development and Related Promotion and Pricing Mechanism in the Philippines APEC WORKSHOP Chinese Taipei, September 2013 ELVIRA TORRES-GELINDON.
Renewable Energy in Islamic Republic Of Iran
RENEWABLE ENERGY FEED – IN TARIFF REGULATORY GUIDELINES Waste-to-Energy Seminar 17 July 2009 Cape Town By Bianka Belinska.
STRATEGIC VALUE OF GEOTHERMAL ELECTRICITY AND THE IMPACT OF ITS PRICING Anang Yahmadi PT PLN (Persero) – Directorate of Construction and New/Renewable.
Solar Thermal Community Action. Agenda Introduction & Solar Thermal Basics Solar Thermal in Canada Solar Resource Assessment Community Power & Ownership.
Renewable Energy Program Arab Union for Electricity
RENEWABLE ENERGY SOURCES STATISTICS DATA COLLECTION AND COMPILATION ISSUES NOOR AIZAH A.KARIM Head, Energy Information Energy Commission Of Malaysia
Dr. Yüksel MALKOÇ TWEA Vice President. Turkey’s current financial outlook, Demand growth and supply development, Wind potential and capacity development,
Marketing of MicroCHP MicroCHeaP meeting Copenhagen 29 September 2005.
Connecticut’s Energy Future Removing Barriers to Promote Energy Sustainability: Public Policy and Financing December 2, 2004 Legislative Office Building.
MIDA BIOMASS CONFERENCE JUNE 2015
Alternative Energy Development Plan (2008 – 2022), Medium - and Long – term Investment Plan and the Role of the Private Sector Mr. Rangsan Sarochawikasit.
Financing new electricity supply in the UK market with carbon abatement constraints Keith Palmer 08 March 2006 AFG.
Energy Renewable Energy in Germany Uta Zähringer - RENAC, Athens - September 15, 2009 placeholder partner logo Renewables Academy (RENAC) AG Schönhauser.
1 Renewable Energy Options for the Indian Railways Amit Kumar TERI, New Delhi December 21, 2011.
Republic of Armenia Scaling Up Renewable Energy Program (SREP) Investment Plan June 2014.
Green Energy London Co-operative Inc. (GEL) May 9, 2013 What is GEL?
Conservation & Demand Management July 2004 – September 2007 Joyce McLean Director, Strategic Issues Toronto Hydro
Renewable Energy Support Schemes & Capacity Building Needs Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda.
SUSTAINABLE ENERGY REGULATION AND POLICY-MAKING FOR AFRICA Module 13 Energy Efficiency Module 13: SUPPLY-SIDE MANAGEMENT.
Optimizing Greening Schools for a Carbon Constrained Future Presented to: The Association of California Construction Managers Presented by: Stephanie R.
Slayton Solar Project RDF Grant Award EP3-10 Presentation of the Project Results to the RDF Advisory Board January 8, Project funding provided by.
Creating A Cleaner Energy Future For the Commonwealth Focusing on Solar PV: Technology, Siting Considerations, Incentives Natalie Andrews Renewable Energy.
THIS IS WHAT HAPPENS WHEN YOU DON’T …  Renewable Energy target of generating 3725MW by year i.e.10% current generation  Target is realistic in.
PRACTICAL ISSUES FOR CDM PROJECTS IMPLEMENTATION IN MALAYSIA EU – Malaysia Biomass Stakeholders Knowledge Exchange Session Kuala Lumpur, Malaysia 28 April.
National Seminar Role of DER in the EU and Current Status in the Baltic States 6 March 2007 Current Status of Energy Policy on Development of Distributed.
PV Policy Group KOM Catania, 6-7 October About PV in Portugal Luís Silva Pedro Paes Hybrid PV-Wind power plant.
Renewables Portfolio Standard: Progress and Perspectives Aaron J. Johnson Director, Renewable Energy Policy & Strategy February 1, 2011.
P ÁZMÁNY U NIVERSITY On the Policy and Politics of Climate Change Session VIII David Ellison Institute for World Economics (Budapest) Comments Welcome.
Ir. Ahmad Hadri Haris Malaysia Energy Centre (PTM) APEC Workshop
USES OF SOLAR ENERGY Dimitar Dimitrov Associate Professor Faculty of Electrical Engineering and Information Technologies.
Dr. Sombat Teekasap The Chairman of Renewable Energy Industry Club The Federation of Thai Industries Website:
Renewable Energy Policies: China’s Scale-Up Story Dr. Xiaodong Wang Senior Energy Specialist EASIN, the World Bank SDN Week, Energy Day February 23, 2012.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Techno-economic Analysis of an Off-grid Micro- Hydrokinetic River System for Remote Rural Electrification Central University of Technology Energy Postgraduate.
Privatization and Liberalization of the Electric Power Industry in Taiwan Energy Commission Ministry of Economic Affairs October 5, 2001.
Net Metering and Embedded Generation NB Climate Action Change Hub Advisory Committee Meeting – October 1, 2008 Saint John, NB Linda Berthelot.
Submission on the cogeneration of electricity 25 July 2013.
Presentation on the Green Energy Act for South Simcoe Municipalities Susan Lloyd Swail M.E.S. Planning Candidate Intern at Nottawasaga Futures Green Economy.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Thailand’s VSPP Program 15 March 2010 Energy Policy and Planning Office Presented to representatives from Tanzania.
Promoting Renewable Energies – in Germany and worldwide Dr. Karsten Sach at Eco Cities of the Mediterranean Forum 2008 October 20, 2008.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
08/12/2015 Developing renewable energy cost effectively EUROPEAN COMMISSION Tom Howes European Commission.
INVOLAR Microinverters Evaluation of ROI of a 3 kW PV system.
INVOLAR Microinverters Evaluation of ROI of a 3 kW PV system.
Mafalu Lotolua PEAG Meeting, SPC, Suva, Fiji 16 th - 18 th November 2015 Tuvalu’s Progress on it’s Energy Master Plan Target
Philippine Feed-In Tariff System Implementation 1.
Renewable Energy Act of 2008
Quantification of the CDM effect: PT.NOEI Integrated Solid Waste Management Project in Bali Mitsubishi Securities Clean Energy Finance Committee Workshop.
Connecting Low Carbon Generation Clive Goodman Primary System Design Engineer.
Eng Salma Hussien Egyptian Electric Regulatory and Consumer Protection Agency Renewable Energy Strategy Plan.
RENEWABLE ENERGY MALDIVES THE FUTURE IS NOW. Mission and Approach Mission Reduce Maldives’ over reliance on fossil fuel for its energy needs. Approach.
1 9. BUSINESS STRATEGIES IN ELECTRICITY MARKETS Asko Vuorinen.
Renewable Heat Incentive Andrej Miller RHI team Department of Energy and Climate Change.
Distributed Generation Chau Nguyen, Pricing & Sales Support
ROK-PH Partneship: Exploring Cooperation in Renewable Energy Mr. Ariel D. Fronda Division Chief, Geothermal Energy Management Division Renewable Energy.
Beyond the Death Spiral
Jon Sibley Director, Energy and Waste Policy
A Roadmap for Photovoltaic Auctions in Israel Targets and vision Honi Kabalo - Head of Renewable Energy, Electricity Regulatory Authority.
Distributed Generation Chau Nguyen, Pricing & Sales Support
The Austrian promotion scheme for green electricity Günter Pauritsch Workshop on renewable energy sources Sofia, 21 December 2011 Austrian Energy Agency.
Advancing Solar PV at Lower Cost: Performance Based Incentives, Price Certainty, and Equitable Rate Treatment Ronald Gerwatowski – Senior VP, National.
NS4960 Spring Term, 2018 China: Expanded Renewables
March, 30 – April 3, 2009, Honolulu, Hawaii
Presentation transcript:

Impact of Feed in Tariff (FiT) on RE Power Generation 22 April 2014 Residence Hotel Uniten Ir Dr Ali Askar Sher Mohamad COO SEDA Malaysia

Contents History of RE in Malaysia The FiT Status today Blockers and enablers of RE

Renewable Energy Development in Malaysia 3 8 TH Malaysia Plan ( ) RE as the 5th Fuel Implied 5% RE in energy mix 9 th Malaysia Plan (2006 – 2010) Targeted RE capacity to be connected to power utility grid: 300 MW – Peninsular Malaysia; 50 MW - Sabah Targeted power generation mix: 54.2% natural gas, 40.2% coal, 5.2% hydro, 0.2% oil, 0.2% Renewable Energy Carbon intensity reduction target: 40% lower than 2005 levels by 2020 RE as of 31 st December 2010 Connected to the utility grid: 61.2 MW (17.5% from 9 th MP target) Off-grid: >1GW (private palm oil millers and solar hybrid)

Malaysian RE Plan National Renewable Energy Policy & Action Plan Original National Renewable Energy Policy & Action Plan YearCumulative RE Capacity RE Power Mix (vs Peak Demand) MW5.5%-6% 20202,080 MW11% 20304,000 MW17%

 A mechanism that allows electricity that is produced from indigenous RE resources to be sold to power utilities at a fixed premium price and for specific duration.  FiT is guaranteed via the RE Act, whereby:  Access to the grid is guaranteed  utilities legally obliged to accept all electricity generated by RE private producers  FiT rates  high enough to produce ROI + reasonable profit (not excessive) to act as an incentive  fixed for a period (typically 16 or 21 years) to give certainty & provide businesses with clear investment environment  Adequate FiT rate "degression" to promote cost reduction and achieve “grid parity”  Adequate fund is created to pay for the FiT rates & guarantee the payment for the whole FiT contract period  Provides a conducive and secured investment environment  Provides fixed revenue stream for installed system  Only pays for electricity produced: promotes system owner to install good quality and maintain the system 5 The Feed-in Tariff (FiT) Mechanism

STATUS BIOGASBIOMASSSMALL HYDROSOLAR PVAll No of Application PENDING REFUSED REVOKED WITHDRAWAL APPROVED FiTCD All Status Today (31 March 2014)

Status Today With 1 % contribution to RE Fund, at 31 March 2014 Total approved capacity = 477 MW Commissioned capacity = 185 MW STATUS BIOGASBIOMASSSMALL HYDROSOLAR PVAll Total Installed Capacity PENDING REFUSED REVOKED WITHDRAWN APPROVED COMMISSIONED TOTAL

Lessons learned from FiT implementation Lesson 1 RE Fund contribution of 1 % (about RM 300M annually) is not enough! Very limited quota Government finally increased the contribution to 1.6 % from 1 st Jan 2014 This translates to about RM 600 M annually (due to increased tariffs) With this increase, and also revision of displaced cost (dc), tentative new quota release from is about another 1100 MW, which includes approximately: 170 MW biogas 240 MW biomass 60 MW MSW 400 MW small hydro 200 MW PV 30 MW geothermal

LESSON 2 FiT rates need to be carefully studied and balanced Obviously high rates for solar PV Rates in 2012: (i) up to and including 4kW (ii) above 4kW and up to and including 24kW (iii) above 24kW and up to and including 72kW (iv) above 72kW and up to and including 1MW (v) above 1MW and up to and including 10MW (vi) above 10MW and up to and including 30MW (i) use as installation in buildings or building structures (ii) use as building materials (iii) use of locally manufactured or assembled solar PV modules (iv) use of locally manufactured or assembled solar inverters

Compare with biogas and biomass (i) up to and including 4MW (ii) above 4MW and up to and including 10MW (iii) above 10MW and up to and including 30MW (i) use of gas engine technology with electrical efficiency of above 40% (ii) use of locally manufactured or assembled gas engine technology (i) up to and including 10MW (ii) above 10MW and up to and including 20MW (iii) above 20MW and up to and including 30MW (i) use of gasification technology (ii) use of steam-based electricity generating systems with overall efficiency of above 14% (iii) use of locally manufactured or assembled boiler or gasifier

Action from Lesson 2 PV Rates In 2013, PV rates were degressed by 20 % for commercial plants while rates for individual applications were degressed by 8 % In 2014, PV rates for all categories have been degressed by another 10 % In 2015, PV rates will probably be degressed by an additional 10 % Biogas and biomass rates FiT rates and bonuses of biogas and biomass plants were subject to degression of 0.5 % and 1.5 % in 2013 Degression rates for these plants have been set to 0 % starting from 2014 Agri and animal waste (including POME) biogas plants are now qualified to get the landfill gas bonus (now 7.7 sen/kWh) Bonus for local manufacture or local assembly of boilers and gas engines has been raised to 5 sen/kWh from 1 sen/kWh From Industry feedback, and PSS applications submitted to TNB/SESB, there is a huge interest in biogas and biomass today

LESSON 3 Even with better FiT rates, development of RE plants can be affected by Grid connection problems PV plants are normally on factory/warehouse rooftop where grid connection is simple due to onsite substation and sufficient load Most biomass, biogas, and especially small hydro plants are located in remote areas where the Grid (i.e. medium voltage network) is either non existent, weak, or does not have sufficient local load to accept the RE generator Although RE Act guarantees grid connection, but the interconnection facilities are the responsibility of the RE generator If point of connection is too far, the costs and unit losses are too high to be economically viable

Action from Lesson 3 Negotiate with utility to allow: Connection of a cluster of RE plants to the Transmission network Each individual plant may be too small to warrant connection to Transmission voltage but in a cluster, they can add up to 30 MW or more Already agreed, and can proceed Suitable for small hydro plants, and some remote biomass plants Flow of power from Distribution network to Transmission network when there is not enough local load Still in negotiations with utilities May require all RE generators connected to medium voltage to provide SCADA facilities to convince the utilities Set up Grid Interconnection Committee (GIC) chaired by SEDA, with the Energy Commission (EC) as Secretariat, and members comprising TNB, SESB, and NUR GIC to discuss all issues relating to Grid connection and bring the proposal to Distribution Code Committee (DCC) or Grid Code Committee (GCC) under EC for approval and implementation

The Way Forward FiT is not meant to be permanent but only to kick start the RE Industry New applications for FiT are proposed to end 2017 for solar PV 2020 for small hydro 2025 for biogas and biomass Last FiT payment in 2041 As fossil fuel power generation costs rise, and RE technology matures, Grid Parity will be achieved one by one for each technology Small hydro already at grid parity (23 sen/kWh or 24 sen /kWh compared to dc of 23.8sen/kWh) Non PV technologies can afford to sell to the utility at dc, especially if the real dc is determined Small PV can be installed under Net Energy Metering (NEM) while utility scale plants can be built through existing power plant bidding exercises An alternative Legal Instrument is needed to ensure the utilities buy from the RE generators at dc and accept NEM because the existing RE Act only implements the FiT.

Conclusion Malaysia went into the FiT after studying its implementation in other countries Although we have weaknesses, but we managed to avoid many of the pitfalls experienced by others Some countries almost went bankrupt and had to cancel the FiT since there was no quota system Within 2 years we managed to increase the grid-connected RE from 61 MW to 185 MW By 2020, we’ll have a minimum of 1000 MW or more under the FiT The FiT can only go so far New Legal Instruments are needed as we approach grid parity