© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management.

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

Configuration Management in NRCs Reactor Inspection Program Rebecca Nease, Region II/DRS/EB1.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
The Economics of Development by the Alliance for Building a Better Ottawa 1 By Cal Kirkpatrick | President | Colonnade Development Jack Stirling | Vice.
10 CFR Part 26, Subpart I Managing Fatigue 10 CFR Part 26, Subpart I Managing Fatigue Kamishan O. Martin, Human Factors Engineer Office of Nuclear Reactor.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
Loss of Configuration Management at Millstone Millstone Refueling Floor Arrangement.
MODULE “PROJECT MANAGEMENT AND CONTROL” EMERGENCY PLANNING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo.
INSAG DEVELOPMENT OF A DOCUMENT ON HIGH LEVEL SAFETY RECOMMENDATIONS FOR NUCLEAR POWER Milestone Issues: Group C. Nuclear Safety. A. Alonso (INSAG Member)
Energy Retreat Institute for Sustainability, Energy, and Environment May 8, 2014.
NRC Decommissioning Activities for the San Onofre Nuclear Generating Station Bruce A. Watson, CHP Chief, Reactor Decommissioning Branch Division of Decommissioning,
Managed by UT-Battelle for the Department of Energy Weatherization Assistant: What’s New in Versions 8.4 and 8.5 Mark Ternes Mike Gettings Oak Ridge National.
Federal Emergency Management Agency Radiological Emergency Preparedness Program Region I, Boston September 10, 2012.
Rate and Revenue Considerations When Starting an Energy Efficiency Program APPA’s National Conference June 13 th, 2009 Salt Lake City, Utah Mark Beauchamp,
Nuclear Power Plant/Electric Grid Regulatory Coordination and Cooperation - ERO Perspective David R. Nevius and Michael J. Assante 2009 NRC Regulatory.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
Configuration Management Benchmarking Group Conference June 6 – 9, 2004 Kansas City, MO © 2004 CMBG Configuration Management Fundamentals including Margin.
VERMONT YANKEE Transitioning into SAFSTOR ​SEPTEMBER 2, 2015 Paul Paradis Director Decommissioning.
School for drafting regulations Nuclear Safety Operation Vienna, 26 November -7 December 2012 Tea Bilic Zabric.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
1 WPL Regulatory Update Scott R. Smith Director, Regulatory Affairs.
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
ANSI/NIRMA Standard CM 1.0 Status Update
Margin Management. PAGE 2 Margin Management Plant Shutdowns 1.Late 1990’s – numerous “surprise” long-term plant shutdowns 2.Shutdowns resulted when a.
1 History in the Making – York’s Pension Plan Winter 2013.
EPA Cooling System Regulations Hall of States Briefing February 22, 2011.
GHG BACT Analysis Case Study Russell City Energy Center May 2010 Donald Neal Vice President, EHS.
Overview of a Water Action Plan: California Public Utilities Commission Paul G. Townsley, President Arizona American Water January 18, 2011.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
MPSC Licensing Issues Energy Regulatory Partnership Program Abuja, Nigeria July 14-18, 2008 Presented by Robert W. Kehres.
NRC Region I Lessons Learned Steve Barr Senior Emergency Preparedness Inspector Region I US Nuclear Regulatory Commission 2010 NRC Region I Joint Exercise.
Configuration Management Fundamentals including Margin Management Bill Kline FirstEnergy Nuclear Operating Company (FENOC) June 2, 2008 Shell Beach, CA.
Vogtle Nuclear Plant Update Moderator: Honorable Greg White, Michigan Panelists: Honorable Lauren “Bubba” McDonald, Georgia Public Service Commission Buzz.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
Technical summary of DPRK nuclear program Siegfried S. Hecker Stanford University Center for International Security and Cooperation 2005 Carnegie International.
Status of Ongoing Rulemakings OAS Annual Meeting August 29, 2012 Deborah Jackson, Deputy Director Division of Intergovernmental Liaison and Rulemaking.
November 12,  As of September 30, 2015, the ENVY NDT Balance was $595,733,175 ◦ Changes in the NDT are due to market losses/gains, reimbursement.
Calder Hall Sellafield Decommissioning Martin Adam Heriot-Watt Edinburgh 2008.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
1 Basic Concepts on Power Supply Agreement (PSA) Francis Saturnino C. Juan Executive Director Energy Regulatory Commission.
Defaults on Municipal Bonds
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM DEVELOPMENT OF THE NATIONAL INFRASTRUCTURE FOR NUCLEAR POWER IN VIETNAM Vuong Huu.
CMBG Conference 2013 Atlanta GA June 3, 2013 ANSI/NIRMA Standard CM Year History.
Nuclear Energy 2016: Status and Outlook
Vermont Yankee- The Last Yankee Standing Bev Good Entergy Nuclear- Sr. Project Manager Boston, MA July 29,
ANSI/NIRMA Standard CM 1.0 Status Update CMBG Conference 2016 West Palm Beach Gardens FL June 6, 2016.
DATA COLLECTION William McCarty Chairman Indiana Utility Regulatory Commission September 9-10 Riga, Latvia.
Japanese Nuclear Accident And U.S. Response April 20, 2011.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
“Status of the ReACTOR Decommissioning Program” October 7, 2016 LLW Forum Ted Smith, Project Manager Reactor Decommissioning Branch Division of Decommissioning,
János Krutzler Hungarian Atomic Energy Authority
Vermont Yankee Decommissioning Update
Flooding Walkdown Guidance
NRC’s LLW Regulatory Program: Update of Emerging Issues
CR3 and Crystal River Energy Complex
Plant Vogtle Units 3 and 4 Alex Thirkell.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
NRC’s Low-Level Radioactive Waste Program
Regulatory Oversight of HOF in Finland
SNC/SCANA – New Build Configuration Management
Overview of NRC Low-Level Radioactive Waste Activities and Initiatives
Decommissioning Rulemaking
TRTR Briefing September 2013
PWR Sump Performance (GSI-191) Industry Workshop
Japanese Nuclear Accident And U.S. Response
Operational Update 1.
Presentation transcript:

© 2014 Institute of Nuclear Power Operations Institute of Nuclear Power Operations Industry Shaping Event 1996 Millstone Loss of Configuration Management Robert Gambrill Manager Engineering & Configuration Management Robert Gambrill Manager Engineering & Configuration Management

© 2014 Institute of Nuclear Power Operations Objectives 2 1. Identify how latent Configuration Management weaknesses from original plant construction were identified at Millstone. 2. Understand the causes for loss of Configuration Management. 3. State industry actions required to assure Configuration Management. 1. Identify how latent Configuration Management weaknesses from original plant construction were identified at Millstone. 2. Understand the causes for loss of Configuration Management. 3. State industry actions required to assure Configuration Management.

© 2014 Institute of Nuclear Power Operations

© 2014 Institute of Nuclear Power Operations Tidbits of 1992 Interest Rates: 6.00% Gallon of Gas: $1.05 Famous Movie Quote: "You can't handle the truth!"- Jack Nicholson, in 'A Few Good Men‘ Cost of a Superbowl ad in 1992: $850,000 Interest Rates: 6.00% Gallon of Gas: $1.05 Famous Movie Quote: "You can't handle the truth!"- Jack Nicholson, in 'A Few Good Men‘ Cost of a Superbowl ad in 1992: $850,000 4

© 2014 Institute of Nuclear Power Operations Who Is This Person? 5

© 2014 Institute of Nuclear Power Operations Loss of Configuration Management 6

© 2014 Institute of Nuclear Power Operations Who Is This Person? – He Identified a Nuclear Safety Concern On Spent Fuel Capability to Handle a Full Core Offload?

© 2014 Institute of Nuclear Power Operations TIME © Magazine, March 4, 1996 Millstone Unit 1 Safety Concerns: Full Core off loads performed contrary to licensing requirements Fuel moves did not wait required 150 hours Spent Fuel Pool not analyzed for Full Core heat load 8

© 2014 Institute of Nuclear Power Operations Millstone Unit 1 BWR Mark I Containment 660 MW electric Commercial Operation - December 28, 1970 Last Operated November 5, 1995 Permanently Shutdown July 17, 1998 Not Financially Viable to Recover CM BWR Mark I Containment 660 MW electric Commercial Operation - December 28, 1970 Last Operated November 5, 1995 Permanently Shutdown July 17, 1998 Not Financially Viable to Recover CM 9

© 2014 Institute of Nuclear Power Operations All Three Millstone Units Were Shutdown Due to Loss of CM Unit 1 – November 1995 (never restarted) Unit 2 – February 1996 to March 1999 Unit 3 – March 1996 to July 1998 NRC Watch List in January 1996 NRC approval to restart was required Unit 1 – November 1995 (never restarted) Unit 2 – February 1996 to March 1999 Unit 3 – March 1996 to July 1998 NRC Watch List in January 1996 NRC approval to restart was required 10

© 2014 Institute of Nuclear Power Operations Tidbits of 1996 Interest Rates Year End Federal Reserve 8.25% eBay was started Minimum wage: $5.15/hour Famous Movie Quote: "Show me the Money!" - Cuba Gooding, Jr., in 'Jerry Maguire‘ ‘ER’ was the #1 TV show Interest Rates Year End Federal Reserve 8.25% eBay was started Minimum wage: $5.15/hour Famous Movie Quote: "Show me the Money!" - Cuba Gooding, Jr., in 'Jerry Maguire‘ ‘ER’ was the #1 TV show 11

© 2014 Institute of Nuclear Power Operations

© 2014 Institute of Nuclear Power Operations

© 2014 Institute of Nuclear Power Operations CM Equilibrium Diagram for Millstone Pre-1997 Inaccurate or Missing Facility Configuration Information What is said to be there Physical Configuration What is there Design Requirements What is required to be there 14

© 2014 Institute of Nuclear Power Operations Primary Factors Contributing to Loss of CM Leadership identified as the primary reason for declining performance: High standards not set and maintained Clear accountabilities not established Inefficient processes Failure to identify true root cases Leadership identified as the primary reason for declining performance: High standards not set and maintained Clear accountabilities not established Inefficient processes Failure to identify true root cases 15

© 2014 Institute of Nuclear Power Operations NRC 10CFR50.54(f) Letter On October 9, 1996 the Nuclear Regulatory Commission issued a letter to every Nuclear Utility in the US entitled, "Request For Information Pursuant To 10 CFR (f) Regarding Adequacy And Availability Of Design Bases Information" 16

© 2014 Institute of Nuclear Power Operations Each utility was required to provide: Description of engineering design and configuration control processes How you know that design basis requirements are correctly translated into operating, maintenance, and testing procedures How you know that system, structure, and component configuration and performance are consistent with design bases Corrective Action process effectiveness for problem identification and resolution Effectiveness of current processes to ensure the plant configuration is consistent with the design bases Description of engineering design and configuration control processes How you know that design basis requirements are correctly translated into operating, maintenance, and testing procedures How you know that system, structure, and component configuration and performance are consistent with design bases Corrective Action process effectiveness for problem identification and resolution Effectiveness of current processes to ensure the plant configuration is consistent with the design bases 17

© 2014 Institute of Nuclear Power Operations – Millstone configuration management recovery completed with the restart of Unit 2.

© 2014 Institute of Nuclear Power Operations Tidbits of 1999 The human population of the world surpassed six billion The initial release of Napster Famous Movie Quote: 'Is that your final answer?'- Regis Philbin, on Who Wants To Be A Millionaire? Cost of a Superbowl ad in 1999: $1,600,000 The human population of the world surpassed six billion The initial release of Napster Famous Movie Quote: 'Is that your final answer?'- Regis Philbin, on Who Wants To Be A Millionaire? Cost of a Superbowl ad in 1999: $1,600,000 19

© 2014 Institute of Nuclear Power Operations

© 2014 Institute of Nuclear Power Operations Millstone CM Recovery Activities Required Prior to Restart Costs: Over $100 Million spent for CM recovery $10 Million in regulatory fines 21

© 2014 Institute of Nuclear Power Operations Loss of Configuration Management Millstone Affect on NU Stock Price TIME Magazine Article Millstone Sale Agreement NU stock price dropped from around $25 to $7 NRC Watch List All 3 Units Shutdown 22

© 2014 Institute of Nuclear Power Operations Extended Plant Shutdowns for CM Recovery Examples: Millstone Unit 2 over 3 years Millstone Unit 3 over 2 years DC Cook over 2 years Examples: Millstone Unit 2 over 3 years Millstone Unit 3 over 2 years DC Cook over 2 years 23

© 2014 Institute of Nuclear Power Operations Questions or Comments? Questions or Comments? 24