Novel market designs & KPIs I NSTITUTO DE I NVESTIGACIÓN T ECNOLÓGICA Stakeholder Kick-off Workshop, IEE-Market4RES Brussels, 2014-04-28 Luis Olmos, Pablo.

Slides:



Advertisements
Similar presentations
How to do intraday capacity pricing in a continuous trade environment? 10 October 2011 NRA-TSO-PX meeting (Informal minutes, made during workshop, of the.
Advertisements

European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
1 page 1 NWE Intraday - Joint TSO and PX presentation London.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
1 Priority issues for the French-UK-Irish regulators What is expected from TSOs? 30 May 2006 To increase trade between adjacent markets and therefore have.
THE REGIONAL ENVIRONMENTAL CENTER for Central and Eastern Europe Integrated Environmental Policies for Sustainable Development UNDP Workshop for NIS
New market instruments for RES-E to meet the 20/20/20 targets Sophie Dourlens-Quaranta, Technofi (Market4RES WP4 leader) Market4RES public kick-off Brussels,
Parallel session for topics: EE-05 Deep renovation of buildings EE-06 Demand response in blocks of buildings EE-02 Design of new high performance buildings.
Gloria Godson VP, Federal Regulatory Policy Reliability Pricing Model Part 2.
The Capacity Allocation & Congestion Management Network Code An overview & status update Antonio Lopez-Nicolas Manager - Markets.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Pierre BORNARD.
Can markets and RES coexist?
Kick-off Stakeholder Workshop "Post 2020 framework in a liberalised electricity market with large share of Renewable Energy Sources" 28 April 2014, Brussels.
Electricity interconnectors – next generation Martin Crouch Future Energy Strategies seminar 3 July 2012.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
The EU Emissions Trading System (ETS) Rationale and Lessons learnt Artur Runge-Metzger Head of International Climate Negotiations, European Commission.
Planning challenges for RE Deployment North African perspective Addressing Variable Renewables in Long-Term Energy Planning (AVRIL) : 2-3 March 2015 Rim.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Towards Regional Independent Operators – a main driver for successful market integration.
Zone Merger – learning from experience and developing an evidential based approach Target Model Workshop 3, London 11 April 2011 Nigel Sisman Senior Adviser.
Demand Response in MISO Markets NASUCA Panel on DR November 12, 2012.
Review of eStorage’s first year results WP3 Benefits of Storage and Regulatory Framework & Market Design 30 October 2013 Wim van der Veen - DNV KEMA.
Market Integration Project. Background –Single Electricity Market Organisation –EU Internal Energy Market –Context for Market Design Market Integration.
EUFORES Workshop – Lithuanian Parliament … Vilnius, April 22 nd, 2013 … Slide 1 > Renewable energy sources in Lithuania.
Information - CommunicationDirectorate general for Energy and Transport European Commission The situation of the Directive on electricity from renewable.
Andrea Ricci - ISIS Brussels, 12 April 2012 Smart Grids: Overview of the study and main challenges 1.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
ENTSO-E’s Network Development Plans and Network Codes: How a strong European grid supports security of supply, affordable electricity prices through market.
21 Kolonaki Square, Athens, T: , F: , E: W: The Energy Community of South.
1 IFIEC Energy Forum 22 November 2011 Electricity.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
Market4RES, Public Kick-Off, WP2 Brussels, 28th April 2014 Hans Auer, Bettina Burgholzer Energy Economics Group (EEG) Vienna University of Technology
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Capacity mechanisms in Europe The fundamental issues behind the ongoing sector enquiry Session 2 - If a capacity mechanism, which design is most appropriate?
Technology for a better society Post 2020 framework in a liberalised electricity market with large share of Renewable Energy Sources (Market4RES) GRANT.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Increasing integration of variable RES-E: Policy and regulatory measures for T&D networks Luis Olmos Pontificia Comillas University Madrid / Spain
Cross border redispatching Central West Electricity Regional Energy Market Mini Forum Alain Marien 20 th of June 2006.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
The Central Role of the Network Operators 28 March 2007 ERGEG-GTE Meeting.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Northern Mini Forum Copenhagen, 27 June 2006 Gunnar Lundberg Chair of the EURELECTRIC WG Wholesale Markets & Trading Vice Chair of the Markets Committee.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Draft Framework Guidelines on Capacity Allocation and Congestion Management Florence Forum 13 December 2010 Alain Marien ENM TF co-chair.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Linnfall Consulting Market design: the energy-only market model Linnfall Consulting September 2015.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
1 Market Evolution Program Day Ahead Market Project Regulatory Affairs Standing Committee Meeting May 14, 2003.
EU context (networks & initiatives) and expectations EU context (networks & initiatives) and expectations Michel Viaud and/or Ingrid Weiss EPIA, Brussels,
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
New Task on DSM and Climate Change Dr David Crossley Managing Director Energy Futures Australia Pty Ltd IEA DSM Executive Committee Meeting Brugge, Belgium.
Integrated policy frameworks
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Draft for factual comments, suggestions on overlaps welcome.
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Strategic Environmental Assessment (SEA)
ROMANIA 2019 NEEDS IDENTIFICATION ROMANIA 2019.
Presentation transcript:

Novel market designs & KPIs I NSTITUTO DE I NVESTIGACIÓN T ECNOLÓGICA Stakeholder Kick-off Workshop, IEE-Market4RES Brussels, Luis Olmos, Pablo Rodilla, Pablo Frías, Camila Fernandes

2 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Need for this task and main objectives The deployment of large amounts of RES generation must be compatible with the integration of European electricity markets This requires implementing some market developments not considered in the European Target Model, which are aimed at: – Encouraging enough firm generation capacity to back-up RES-E generation – Allowing new generation to be installed where it is more efficient – Increase the flexibility of the system to adapt to changes in operation imposed by RES-G Then, WP3 aims to: – 1) Identify main market developments that are pending and main design options for them – 2) Provide indicators able to measure the performance of market design options in achieving the aforementioned objectives Interaction with stakeholders is central to success

3 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April WP3 in Market4RES WP2 Opportunities, challenges and risks for RES-E in a European integrated electricity market with full target model implementation WP5 Modeling of electricity market design & Quantitative evaluation of policies for post 2020 RES-E targets WP6.1 WS1: Implementation Target model WP6.2 WS2: Implementation Novel designs Short term markets WP6.3 WS2: Implementation Novel designs Long term markets WP3 Novel market designs & KPIs WS1: Short term objectives ( ) WS2: Long term objectives (post 2020 ; ) WP4 Appropriate new market instruments for RES-E to meet the 20/20/20 targets

4 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Structure of WP3: main tasks Market developments proposed are classified according to the time frame of market operation they are relevant to: – Task 1: Market developments affecting the design of long-term markets – Task 2: Market developments affecting the design of short-term markets Once market design options to analyze have been identified, we turn on to measuring the performance of the former – Task 3: Assessment of market options (KPIs) Analyses are to be performed in close cooperation with stakeholders – Task 4: WP3 expert workshop and follow-up consultation event

5 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Work package 3 task description Task 3.1: Long-term markets (CRM) Capacity Remuneration Mechanisms (CRM) are here to stay – After decades of strong opposition, several European countries are now implementing some kind of CRM – National flawed and uncoordinated designs can impede to seize all the opportunities that cross-border electricity exchanges can offer Objective of this task – How to further develop CRM national designs to enhance regional electricity market performance Divided in three subtasks – General design principles of CRMs – Participation of RES-E in CRMs – Cross-border trading of capacity

6 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Work package 3 task description Task 3.1: Long-term markets (CRM) General design principles of CRMs – Identify the most relevant design elements – Define a reference CRM design – How to deal with a context of massive penetration of RES-E The role of flexibility The role of demand response Participation of RES-E in CRMs – Evaluate the potential participation of RES-E in CRMs – How to evaluate the contribution of RES-E Cross-border trading of capacity – One of the hot topics as regards the Internal Electricity Market – How to ensure that no barriers to cross-border trading exist

7 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Work package 3 task description Task 3.2: Short-term markets Main pending developments related to the need to: – Better represent operation constraints; – Provide more flexibility; – Allow the participation of RES-G and L – Representation of the network – Concerns the granularity level of the network model considered – The network model should allow the representation of congestion occurring in the grid… while keeping it a simple as possible – Options that can be considered include nodal pricing, zonal pricing, hybrid zonal pricing – Timing of short term markets – Coping with uncertainty introduced by RES generation requires getting markets closer to real time – Options are: complementing or replacing day-ahead with intraday or close-to-real-time markets, or hybrid solutions

8 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Work package 3 task description Task 3.2: Short-term markets – Bidding protocols – Trade-off between the level of flexibility of bids, and therefore dispatch efficiency, and the complexity of the dispatch algorithm – Range of options from simple constraints like minimum revenues or block bids, to very sophisticated ones able to reproduce the unit commitment problem – Participation of RES-E generators and demand in short- term markets – Participation in energy markets: Imbalance settlement design Impact on balancing requirements Appropriate design of intraday markets – Participation in AASS markets Current rules preventing RES-G and L from participating in markets Definition of operation situations where provision of AASS is justified

9 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Work package 3 task description Task 3.3: Definition of KPIs Measuring the performance of proposed market developments is needed to choose the most appropriate options  KPIs must be defined KPIs can be classified according to the challenge they relate to Thus, KPIs that may be considered could include: – Attracting generation capacity and its availability: fuel security; short- term peak demand security; long-term generation adequacy; etc. – Integration and well functioning of the market: trading volume and market prices – Increasing market flexibility: Level of load balancing; Ramp rates of residual demand; Predictability of renewable output – Cost reflectivity of price zones: PTDFs of congested line w.r.t. intra- zonal transactions; Homogeneity of nodal prices within price zones – Profitability of RES-E generation: level of interaction of market with ETS

10 Novel market designs & KPIs - Luis Olmos Market4RES Kick-off Stakeholder Workshop, April Work package 3 task description Task 3.4: Expert workshop and consultation Once options to address deficiencies of the TM are identified, stakeholders will be consulted on: – whether these are the most promising design options – whether performance indicators proposed to assess them are appropriate Consultation will take place through two channels: – Expert workshop – Consultation process: a consultation document will be addressed to market agents, TSOs, and regulators – Feedback to be used to fine-tune designs and KPIs considered MARCH 2015 BRUSSELS MAY 2015 EUROPE

Novel market designs & KPIs