Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

Lecture 2: Pressure Measurements
1/8 T. Kume, Y. Honda, and T. Tauchi High Energy Accelerator Research Organization (KEK) T. Suehara, H. Yoda, M. Oroku, T. Yamanaka and Y. Kamiya The univ.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
ILC roles Interferometry Results 2009 / 2010 Mon 20 Apr :00 JST (01:00 UTC) MDI TILC09 – Tsukuba OXFORD MONALISA 1.
Initial Calibration and Stability Results from the LiCAS RTRS FSI System John Dale for the LiCAS Collaboration IWAA February 2008.
Final Doublet Stability and in-detector Interferometry MONALISA David Urner Oxford University.
Sta bilization of the F inal F ocus : Stabilization with Nano-Meter Precision.
Wed 17 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 Plans for first installation 30 June to 19 July 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
IPBPM piezo-mover system and plans for in situ monitoring of calibration and stability Current status and plan for ATF2 Philip Bambade Laboratoire de l’Accélérateur.
Pre-isolator Update 18 th MDI Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist December 17, 2010.
Simulations and measurements of the pre-isolator test set-up WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist November 9, 2010.
Status of IPBSM Improvement N. Terunuma, KEK 2012/July/13 ATF2 Weekly Meeting.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Active Seismic Isolation Systems for Enhanced and Advanced LIGO Jeffrey S. Kissel 1 for the LSC 1 Louisiana State University The mechanical system for.
PXL vibration and stability 1/7/2014. Measurements of: Cooling air induced vibration of the PXL sensors as a function of air flow DC position change as.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Tue 22 Sept 2009 Stabilization Day 7 Oxford MONALISA 1 MONALISA update Could the messenger of bad vibration news be the cause of it? beam pipe Shintake.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Oxford University.
Concepts for Combining Different Sensors for CLIC Final Focus Stabilisation David Urner Armin Reichold.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
LISA STUDIES AT THE UNIVERSITY OF COLORADO Michael J. Nickerson, Ellery B. Ames, John L. Hall, and Peter L. Bender JILA, University of Colorado and NIST,
David Urner, Oxford University, RHUL – June StaFF Stabilization of Final Focus Motion Stabilization with Nano-Meter Precision David Urner Paul Coe.
Office of Science Coupling Coil Status S. Gourlay August 1, 2012.
NST PRIMARY MIRROR CELL: ANALYSIS AND SOLUTIONS BBSO, 02/11/2004 Leonid Didkovsky.
ATF2 meeting LAPP; David Urner 1 David Urner Paul Coe Matthew Warden Armin Reichold Geoffrey Rayner MPhys alumnus MONALISA Monitoring, Alignment.
Disturbance Rejection: Final Presentation Group 2: Nick Fronzo Phil Gaudet Sean Senical Justin Turnier.
Tue 31 Mar :50 (CEST) 13:50 UTC CLIC stabilisation day 5 - LAPP OXFORD MONALISA 1 Options for interferometric monitoring of CLIC test magnet M.
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
MONALISA an Update David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
Stabilization of Focus at ATF2 David Urner University of Oxford.
Pre-isolator & QD0 support modeling 5th WG5 Meeting F. Ramos, A. Gaddi, H. Gerwig, N. Siegrist September 7, 2010.
Alignment Bars Requirements Strategy Layout Length Prediction Shape Prediction Readout Scheme Model to predict bar shape in the experiment Calibration.
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Steel Honeycomb Vibration Isolation Tables
PXL vibration and stability 1/7/2014. Measurements of: Cooling air induced vibration of the PXL sensors as a function of air flow DC position change as.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
MONALISA David Urner Paul Coe Matthew Warden Armin Reichold Monitoring, Alignment & Stabilisation with high Accuracy.
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
LCGT f2f meeting/ICRR, 04/Aug./2011 N. KIMURA Status of the Cryogenics Design N. KIMURA A, S. KOIKE B, T. KUME B, T. OHMORI D, Y. SAITO C, Y. SAKAKIBARA.
MONALISA Update David Urner ATF2 Meeting Dec
ATF2 weekly meeting 4 July 2007 MONALISA: Attachment of Vacuum Vessels for ATF2 David Urner.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
Wed 24 Jun 2009ATF2 weekly meeting Oxford MONALISA 1 MONALISA Double Bellow System Forces test results Oxford: June 2009.
Any regular vibrations or oscillations that repeat the same movement on either side of the equilibrium position and are a result of a restoring force Simple.
MICE RF Coupler Modifications Update 4/30/2015 Allan DeMello.
Alignment and stability session
David Urner Oxford University/JAI
Summary FD Support System
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Vibration studies for the QD0-support system
Universal Vibration Rig Fixture for Govmark
David Urner Paul Coe Matthew Warden Armin Reichold Oxford University
Sphere Option for Helical spring CF16 Bellows Adjustment bolts (horizontal plane) CF38.
Testing and installation of prototype diode insulation system in MB2950 Florian Meuter, 3rd Meeting on Diode Consolidation during LS2,
1/10 prototype support tube
IP configuration session
DSOCS2 – Introduction to optimisation in Solidworks
Shipping Support Post Analysis
Presentation transcript:

Status on MONALISA presented by D. Urner 6 th stabilization day 9. June 09

Progress on mechanical setup Double bellow system:

Vacuum ~1.4 bar pressure SMC ITV1050 Pressure Regulator to compressed Air supply (~2.0 bar) Vent SMC PSE510 Pressure Sensor SMC PSE511 Pressure Sensor SMC ECC-PNAL2 Controller Idea: Generated Force is proportional to sum of pressure in inner and outer bellow system. –Find Point where force is zero Use commercial control system. Active Double Bellow

Progress on mechanical setup Double bellow system: –development geared towards minimal force system –development with Platine Prcision Ltd. started Sep 08 –full assembly of double bellow to double flanges this week –shipped to Oxford by end of week

Mechanical Vacuum system: 1st mode frequency: 266Hz. FEA shows very high resonance frequencies 2cm aluminium plate bolted to M30 taped holes in Shintake table Entire structure made from aluminium. Bellows: –actual bellows: stainless steel 316L –flanges: stainless steel: 304L 1 st mode frequency:162 Hz.

How to insert optics Insert optics platform –rests on very thin aluminium floor –essential a square piece of carbon-fibre loaded peak (plastic) holding retro- reflectors –easy to change to different (optics) geometries

Calibration Study Does system self-calibrate? –This means: calibration by making measurements at many locations. e.g: Photogrammetry does this –Can partially self-calibrate –Some DOF poorly determined What is the effect of calibration errors? –Effect is to introduce a scale error into displacement measurements –Simulated a “minimal” calibration scenario: “Calibration” = Where are these components located on their mounting plate? Shintake Monitor mounting plate QD0 mounting plate 1mm uncertainty in component locations 0.3% scale error for vertical motion

Calibration Study What is the effect of calibration errors? –Effect is to introduce a scale error into displacement measurements –Simulated a “minimal” calibration scenario: –e.g vibrations with amplitude 1 μ m would be limited in reconstructed accuracy to 3nm from calibration –a long-term shift of 100 μ m would be limited in reconstructed accuracy to 300nm “Calibration” = Where are these components located on their mounting plate? Shintake Monitor mounting plate QD0 mounting plate 1mm uncertainty in component locations 0.3% scale error for vertical motion

MONALISA at CLIC Start with 3 vertical lines –launch heads will be produced for KEK and CLIC by end of year –Need vertical tubes, ideally of 200 mm diameter Later add horizontal measurement –Need 200 mm horzontal tube –As much space at intersection as we can get.