AIDA FEE64 production report June 2011 LYCCA tests and MBS Production of FEE64 Preparation for October test. 13th June 20111
LYCCA test and MBS A single FEE64 card with mezzanine was mounted on the central aluminium support and along with top cooling plate was plugged via the LYCCA adaptors into a LYCCA silicon detector in the LYCCA chamber at GSI. The cooling was provided by a fan and aluminium cooling blocks. The MBS interface was used, successfully, to integrate data with the MBS system. 13th June 20112
Production of FEE64 Electronics testing is proceeding. Cooling pads for the AIDA modules are being manufactured. A modified set of pads has been ordered. Mechanical parts for the modules are in stock. 13th June 20113
Preparation for the October test 6 th June, meeting to discuss installation of a system inT4 that will be shipped to GSI for the October experiment. Designing the MACB to integrate the 12 FEE64 cards ( 6 modules ) into a system. Problem with HDMI connection. 13th June 20114