INSIDE 15/16-09-2014 MECHANICS UPDATES CHARIOT - NEW DESIGN COOLING PET DETECTOR G. GIRAUDOTORINO 15/16 - 09 -2014.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

Continuum Mechanics Mohsen Malayjerdi. » Strain : intensity of deformation strain = change in length/original length » Stress : intensity of force Stress.
G.Barber Mice Tracker Integration Jun Tracker integration.
Detector Systems Update MICO March 17, MICE Detector Systems  CKOV u Mississippi RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing.
Coolant Connections to the DCLL Blanket S. Malang, Dara Navaei, Xueren Wang ARIES Project MeetingARIES Project MeetingUCSD January 23-24, 2012January 23-24,
Dale Chihuly Glass. Hot Glass Glassblowing is a glass forming technique that involves inflating molten glass into a bubble or parison, with the aid of.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
G.Barber Tracker Update, Berkeley 10 Feb Tracker Progress Contents:- Station Space Frame Patch Panel / Vacuum Seal Light Guide Map Position of Degrader/Support.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
G.Barber Mice Tracker Mechanical Progress Imperial Tracker Update Contents:- Components Station Layout Light Guide Map QA Patch Panel Alignment.
PIRALU Pre-Insulated aluminium panels Poliuretanos, s.a. -Reinforcements -Access doors CHAPTER 010-i.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
Leaf Spring prototype preparation M.Lenti. Reminder Piet’s proposal: two dowels inserted into two mirror holes (vertical alignment); mirror weight as.
The problem of foundry production is manufacture of billets and machine parts by pouring fused metal into a casting mould, whose cavity has the shape of.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
THIN-LAYER CHROMATOGRAPHY Judith is preparing her TLC chamber, which is shown at left in the developing step #4. Scroll down for her to guide you through.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
1 MME3360b Assignment 04 10% of final mark 6 problems, each worth 16.7% of assignment mark Due April 9 th, 2012.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
TOB Production - January of 688 rod frames ready. Production rate 3-4 rod frames/day. Shipments (40 rod frames/shipment) started from Helsinki.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
WP6: HIGH FIELD STUDIES The work package deals with 20 T field accelerator-type configurations and its consequences on mechanics and materials: The purpose.
Count on Chemistry Presented by the MathScience Innovation Center Written by Theresa Meade.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
Nikhef Amsterdam Mechanical- Technology Short update on CO 2 cooling activities at Nikhef 13 October 2010.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
Production of Petal Mechanics. Petal plates (EUROCOMPOSITE) to be made with T300 skins (+45°/-45°) Second skins (FVT) are M40 (0°/90°) and are available.
GIGATRACKER SUPPORTING PLATE COOLING SYSTEM SIMULATION 1Vittore Carassiti - INFN FECERN, 11/12/2007.
ATLAS 1 Beam Pipe Support Structure (BPSS) Services Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman, A Smith, LBNL S. Coelli,
Extended Start Up 15 minutes  Organize your test questions by category  Step 1: Decide on a symbol for each category Plate Tectonics Earthquakes Volcanoes.
G.Barber/Peter Cooke: Mechanical Design Update Imperial 22 July Mechanical Update for Tracker workshop Contents:- New Station Layout Light Guide.
1 SVT Status Update Yuri Gotra CLAS12 Silicon Vertex Tracker TCB Meeting March 13, 2015.
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
Tracker 1. Status 2. Expected delivery date of system to RAL 3. Required support infrastructure needed for setup and initial debug. Things like vacuum,
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module.
G.Barber Mice Tracker Mechanical Ral June Tracker Mechanical Update Contents:- Station Space Frame Station Layout Connectors Patch Panel Still to.
Problems 1. A large plate is fabricated from a steel alloy that has a plane strain fracture toughness of 82.4MPa√m. If, during service use, the plate is.
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
EMC BWE Proto18 - Orsay Meeting 1 PANDA EMC BWE Proto18 Mikel Catania Goikoetxea, Javier Navarro Medrano, David Rodríguez Piñeiro, Yue Ma, Frank.
Aluminum Alloy 6061 – Composition, Properties, Temper and Applications of 6061 Aluminum.
MVD COOLING STATUS-PAST AND UPDATES PIXEL COOLING PROJECT: -STUDIES and TEST on MATERIALS (Carbon Foam) -THERMAL FEM ANALYSES and TEST on DISKS and STAVES.
DEPFET Workshop, Kloster Seeon, May 2015 Mechanics & IBBelle 1 No news on PXD Mechanics in general Cooling blocks for thermal mock up are at DESY 2 more.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
Pixel Cooling Upgrade (2013) 1 December 20081Hans Postema - CERN.
K.Long/G.Barber Mice Tracker Mechanical Status CM20 Feb 08 1 Mice Tracker Mechanical Status Contents:- Tracker 1 Status Tracker 2 Status Further Hardware.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
INSIDE in-beam PET system assembly and test at INFN Torino
Status of GASPARD mechanics
Upgrade activities at Clermont-Ferrand
Safety approval of the installed copper cooling pipes
MVD Mechanics update EXTERNAL FRAME: NEW DESIGN
FEE COOLING UPDATE CGEM Workshop - IHEP - June 13th 2017
End-cap Mechanics FDR Overview of the Project
LARP Phase II Secondary Collimator RC1
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
UPDATES on INSIDE MECHANICS
FRESCA2 Update on the dipole design and new calculations
UT Integration meeting UT CO2 COOLING DISTRIBUTION SYSTEM
Far Detector Activities Late 2017 – Early 2018
MicroMegas Mechanical Meeting --- Cern April 2014
Update on Junction Box Design
Status of CO2 Cooling tests at CERN for Pixel phase 1
Thermal aspects Unité mixte de recherche CNRS-IN2P3
التعامل مع ضغوطات العمل إعداد وتقديم إقبال المطيري
Elements and Principle Foldable Instructions
BIRDS-4 Computer Aided Drawing (CAD)
Presentation transcript:

INSIDE 15/ MECHANICS UPDATES CHARIOT - NEW DESIGN COOLING PET DETECTOR G. GIRAUDOTORINO 15/

G. GIRAUDOTORINO 15/ MECHANICS UPDATES Not approved by CNAO

G. GIRAUDOTORINO 15/ MECHANICS UPDATES ALL COMMERCIAL COMPONENTS ARE CERTIFIED FOR MEDICAL ENVIRONMENTS (CE)

G. GIRAUDOTORINO 15/ MECHANICS UPDATES PET TRACKER VERTICAL SLEDGES LINEAR GUIDES NADELLA LM GAS SPRINGS LIFT-O-MAT WEELS TENTE

G. GIRAUDOTORINO 15/ MECHANICS UPDATES STRESS ANALISYS 10 MPa (130 MPa)

G. GIRAUDOTORINO 15/ MECHANICS UPDATES

G. GIRAUDOTORINO 15/ MECHANICS UPDATES

STAUBLI RME TO INSIDE FROM INSIDE MSC SRH MANIFOLD 1x4 REG 1202 MANIFOLD 1x4 CHILLER SMC HRS012-AF-20-MT G. GIRAUDOTORINO 15/ MECHANICS UPDATES

G. GIRAUDOTORINO 15/ MECHANICS UPDATES The INSIDE support mechanics has been redesigned The structural FEM analysis ready/done The cooling system drawing is ready Patch Panel location to be decided Chiller type to be decided Report on mechanics/cooling to be submitted to CNAO ready soon

G. GIRAUDOTORINO 15/ PET detector updates

G. GIRAUDOTORINO 15/ PET detector updates COOLING PLATE – NEW DESIGN ALUMINIUM ALLOY AlSi7Mg T6  150 W/m∙K AISI 316 L  15 W/m∙K Tube embedded in the melted plate found an art foundry (ITALFOND) plate in order: minimum 8 pieces

G. GIRAUDOTORINO 15/ PET detector updates

G. GIRAUDOTORINO 15/ PET detector updates

G. GIRAUDOTORINO 15/ PET detector updates The INSIDE support mechanics has been redesigned The structural FEM analysis ready/done The cooling system drawing is ready Patch Panel location to be decided Chiller type to be decided Report on mechanics/cooling to be submitted to CNAO ready soon Cooling plates has been redesigned Cooling tube embedded in the melted plate New drawing from Hamamatsu Reference mark locations have to be found