A Proposal for the Repurposing of Penfield Hall Prepared By:Chris Crook: Project Manager Matt Baker: Logistics Lead Thomas Quigley: Budget Lead Brittany.

Slides:



Advertisements
Similar presentations
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
Advertisements

Health Sciences Building Current Space Repurposed Jim Falco Dr. Amy Maxeiner Dr. Tony Miksa.
 Meaning: Establishment of an industry at a particular place.  It refers to the choice of region and the selection of a particular site for setting.
For Students in their Food Services, Health Center, Co-curricular & Study Spaces 11/9/12.
Planned Moves, Changes, Issues Library Administrative Council All-Staff Meeting September 10, 2013.
MV Planning Process Information Gathering Referal to Subcommittee(s) Recommendations.
GATEWAY CENTER SPACE UTILIZATION STUDY September 17, 2007.
Education on RAC and Other CE Applications of Waste Tires Prepared for the CIWMB Meeting October 4, 2007.
STEPPING STONE TO THE CSU VIA THE COMMUNITY COLLEGE Fall 2008 CSU High School Counselor Conferences Mark McKellip.
EXTREME MAKEOVER OR GENTLE REMODEL Linda Demmers Infopeople 2006.
School of Science and Computer Engineering Master of Science in Engineering Management 1 Proposed Master of Science in Engineering Management Engineering.
Houston Independent School District John F. Kennedy Elementary School PROJECT PROFILE PROJECT HIGHLIGHTS The John F. Kennedy Elementary School is a replacement.
B.E.S.T. Academy Ruben L. Barkley MEDT 6461 Summer 2008 Media Center Floor Plan.
Facility Management: “It’s your home away from home, So take good care of it!”
Creating a Culture of Collaboration: Collecting Community Engagement Data Susan Connery, Director of the Feinstein Community Service Center Christopher.
Getting the Most from Your Psychology Major. Psychology Student Organizations Psychology Club –Open to all students interested in Psychology –Informational.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Author name here for Edited books chapter 6 Facility Construction 6 chapter.
November 6 th Referendum Information School District of Horicon.
Facilities Modernization Program Funded by Measure B Project Report October 20, 2014.
Capital Health Medical Outpatient Unit April 12th 2007 Final Presentation Kyle Brown Hillary Higgins Justin Lang.
CBPA Computer Lab Redesign Development of the Career and Placement Center Ted Strickland Department of Computer Information Systems March 21, 2005 DRAFT.
FACILITIES MANAGEMENT PHYSICAL CAPACITY COMMITTEE SUMMARY OF RECOMMENDATIONS APRIL 26, 2013.
AL-QADISIYIA UNIVERSITY COLLEGE OF ENGINEERING SELF ASSESSMENT REPORT Submitted by SAR committee.
Office Layout Techniques and Space Requirements
Background  Based upon a pilot conducted in Spring 2011 to assess how public spaces are being used within the Main, Science and Fine Arts Libraries through.
QIPM SURVEY RESULTS 2006 MANAGEMENT SCIENCE DEPARTMENT (NOW THREE DEPARTMENTS)
Regional Meetings Building Your Meeting Structure One Block At A Time.
Minnesota State Colleges and Universities Revenue Fund Overview and FY15 Student Union Budget Information Presented to the Student Fee Management Committee.
Spokane Falls Community College Building 17 Remodel The Falls Lounge April 9, 2013.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
Work Breakdown Structure (WBS) Development
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
INFORMATION TECHNOLOGY SERVICES University Data Center Project Overview January 11, 2010.
Strategic Management of Classroom Environments. The Ohio State University Classroom Management System Classroom Readiness Committee Senior Associate Registrar.
- Work Environment Details Jun -15. Purpose  This document provides overall description of various infrastructure support an Project in our Organization.
Sonoma State University
BRVFD & RS Training Facility Proposal 05/07/2009.
School Consolidation Public Information Session New Hartford Board of Education.
Renovating Geoscience Labs for the Future “We want our students to learn skills they need in the workplace…not a museum.” Key Design Drivers Capacity—
Prothro-Yeager College of Humanities and Social Sciences FY 2014 Budget Hearings Dr. Samuel E. Watson III, Dean March 23, 2013.
Planning for School Implementation. Choice Programs Requires both district and school level coordination roles The district office establishes guidelines,
New England Association of Schools and Colleges Community Resources for Learning.
Operating Budget Funding Sources State Appropriations - General Revenue Formula Funding, Special Items, Benefit Cost Sharing THECB Transfers TX Grant,
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
Faculty Senate Presentation Classroom Modernization & Maintenance.
White Hill Super Sub FPAC Report. White Hill Team Structures Curriculum Personalization Targeted Academic Intervention Shared Best Practices Curricular.
Criterion 1 – Program Mission, Objectives and Outcomes Weight = 0.05 Factors Score 1 Does the program have documented measurable objectives that support.
School Library Media Center Facility Plan Karen H. Carter 10/6/2012.
CASE STUDY: CHAPMAN GRADUATE SCHOOL OF BUSINESS IND 5615 – Building Systems for Interior Designers ASSIGNMENT 4 - PART I & II SEPTEMBER 7, 2010 FRANCINE.
Client Senior Design Electrical and Computer Engineering Iowa State University Introduction Abstract Architectural plans are currently being developed.
FACILITY IMPROVEMENT PROGRAM SUMMER 2004 NEW CONSTRUCTION –Molecular and Computational Biology Building –Cognitive Imaging Center REMODELED LABORATORIES.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
1311A.7 Club Leadership Training Session Achieving Success As Sergeant At Arms.
SOUTH TEXAS COLLEGE DUAL2DEGREE & EARLY COLLEGE ORIENTATION 2016.
COHORTING: When a Course is Used to Assess Multiple Degree Programs Snapshot Presentation: PATRICIA AWERBUCH School of Economics Drexel University Annual.
A Collaborative Blueprint for Classroom Design Barbara Brandt, ITD Carole Meyers, Emory College Emory University Copyright Barbara Brandt and Carole Meyers.
Merritt College Proposed New Science Complex PCCD Board of Trustee Meeting May 20, 2008 Presented By Dr. Sadiq B. Ikharo, Vice Chancellor Department of.
SINKING FUND PROPOSAL OCTOBER 3, SINKING FUND ADVISORY COMMITTEE PURPOSE: DEVELOP A LIST OF RECOMMENDED PROJECTS FOR THE 2012 SINKING.
LOCAL OPTION SALES TAX FOR EDUCATION APPROVED BY THE BOARD OF TRUSTEES SEPTEMBER 29, 2015.
EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project – Update Debbie Hoffman, PE Civil Engineer II March 23,
White Pigeon Community Schools
Case Study: Collaborative Connected Workplace Environment- Cisco
Changing the Culture of Learning One Class at a Time
Automotive Collision Technology
Architecture, Civil Engineer, and Interior Designer
(Additional materials)
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Facilities Modernization Program
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

A Proposal for the Repurposing of Penfield Hall Prepared By:Chris Crook: Project Manager Matt Baker: Logistics Lead Thomas Quigley: Budget Lead Brittany Vorreiter: Editorial Lead May 7, 2010

 BQVC dedicated to efficient and enriching designs  Project Manager: Chris Crook ◦ Project Manger for Freshman Design Competition Team ◦ Project Manager for Proposal for an Activity Center  Budget Lead: Thomas Quigley ◦ Minor in Business ◦ Accounting course

 Logistics Lead: Matt Baker ◦ AutoCAD experience ◦ Mechanical Engineer degree ◦ Experience with renovation of manufacturing plant  Editorial Lead: Brittany Vorreiter ◦ Programming Chair for leadership conference ◦ Economics and Psychology research ◦ Reading and writing courses

Problem: Sociology Lacks Space Solution: Move Sociology into Penfield Hall Penfield Hall will be remodeled:  4 Classrooms  4 Professor Offices  Computer Lab  Archeology Lab  Administrative Assistant Office  Student Worker/Lobby Desk.  Artifact Display Lobby Total Cost: $65,000 Total Time: 2 Months Penfield Hall Sociology Department Bookstore

 Sociology Department ◦ Successful graduates ◦ African artifacts worth $70,000 ◦ Conjoined Criminal Justice and Anthropology  Problem ◦ Overcrowded  Share classroom and office space with Political Science, History department ◦ Not efficient ◦ Disorganized ◦ Dispersed

 Mercer needs: ◦ Organized front  Sociology department needs: ◦ Central location ◦ Climate control for artifacts ◦ Classrooms ◦ Offices

 Move Sociology to current Penfield Bookstore ◦ Showcase artifacts ◦ Four offices ◦ Four up-to-date classrooms ◦ Archeology lab  Benefits ◦ Increase communication ◦ Preserve collection (museum) ◦ United Mercer atmosphere

 Project rationale  Technical details  Itinerary of the operations  Further recommendations

Merit Table on a Scale of 1-10

 Purpose of this part of the presentation: ◦ Provide a feasible solution to the problem ◦ Discuss plans and work descriptions needed for implementation ◦ Discuss the resources needed  The Sociology Department needs a new facility ◦ Central location on campus ◦ Adequate office, classroom, and lab space ◦ Contained facility

 The Bookstore located in Penfield Hall will be moving to the Mercer Lofts in December 2010  Located behind the Connell Student Center ◦ Central campus location ◦ Close to College of Liberal Arts  Facility is approximately 9,000 sq ft ◦ Four existing office spaces and restrooms ◦ Large enough to accommodate the Sociology Department  We propose to relocate the Sociology Department in Penfield Hall

 Provide four 600 sq ft classrooms ◦ Each will seat 24 students  Lab Space ◦ Computer lab ◦ Archaeology lab  Office Space ◦ Faculty ◦ Secretary ◦ Student Workers  Display Sociology Department’s store of artifacts

 New facility will be stocked with durable and cost efficient equipment  Utility Tables ◦ Each classroom will be equipped with 12 tables ◦ Seat 2 students each ◦ Steel frame and high pressure laminate top

 Science Storage cabinet ◦ Made of solid wood with chemical resistant finish ◦ Archaeology lab will be equipped with 6  Fabric Stacking Chairs ◦ Provide cost efficient way to seat all students ◦ Durable steel frame and backs

 Lab tables ◦ Equipped with running water and gas valves ◦ Solid epoxy top ◦ Archaeology lab will be equipped with 4  Whiteboards ◦ Assist professors in teaching class ◦ Large enough for all students to see ◦ Each classroom will have one

 BQVC has the capability of contracting out most of the necessary work ◦ Keep cost at minimum ◦ Maintain quality  Mercer’s IT Department will be used for computers and networking  Brickman Co. will be used to repair any grounds damage

 Proposed plan will provide a realistic solution to the Sociology Department’s problem  Provide facilities which Mercer does not currently have ◦ Museum ◦ Up-to-date archaeology lab  Will enrich Mercer’s academic environment

 Feedback will be collected to judge the success of the project after its completion ◦ Survey of the Sociology Department students and faculty ◦ Statistical analysis of grades in Sociology Department ◦ Statistical analysis of enrollment to the Sociology Department

Project Manager Budget LeadLogistic Lead Subcontracted Workers BQVC will organize the implementation of the proposed project. Subcontracted Work Interaction with Mercer representatives Relocation of artifacts Quality Control Success Criteria

 The operations plan will consist of the following phases: ◦ Deconstruction ◦ Construction ◦ Site Cleaning ◦ Relocation of Sociology Department

 Concrete staircases  Various walls  Any remaining shelving from the bookstore  Any counters or cabinets currently located in the building

 Classroom walls and ceiling  Walls in back room to create two large rooms  Installation of archaeology lab equipment  Putting doors on all the offices

 Any messes made by subcontractors will be cleaned at their expense as they finish their work  A final cleaning of the building will be performed before relocating the Sociology Department  This cleaning will be performed by Mercer’s current cleaning services

 Office furniture and personal items will be moved by members of BQVC and the Sociology Department  Our largest concern is relocating the artifacts ◦ We will be acquiring the help of qualified individuals in relocating these valuable artifacts ◦ The artifacts will be placed in areas that may be viewed by both students and visitors

 Computer lab furniture and equipment will be relocated to the new lab at the back of the building ◦ Mercer IT will set up the new networks and ensure that all the computer lab equipment is functioning properly

 The total estimated cost for this project is $64, ◦ This includes a 10% overhead cost, as well as cost of materials ◦ Costs for HVAC, construction and floor work were based on researched estimates for this type of renovation

 New classrooms require new furniture ◦ We have chosen items due to their low cost and high quality. We believe these choices will be the best use of Mercer’s money ◦ We have listed 7 white boards in the budget  One in each classroom  One in both the computer and archaeology lab  One in the lobby

 Cost of Materials ◦ We included the cost of materials for constructing all the new walls we’ve proposed ◦ Flooring and HVAC costs are based on previous work of this type  Overhead Estimate ◦ We’ve included the 10% overhead to accommodate any issues that could arise during implementation

 BQVC will make regular visits to the work site to ensure that work is being completed to the highest standards ◦ Reports will be obtained weekly from subcontractors ◦ Mercer representatives will be informed regularly  They will also be brought to the site at the end of each milestone to see progress and voice any concerns

 Sociology has the greatest need on campus  Due to decaying artifacts, we need to act now  Will give Mercer a more organized appearance  May benefit students to have centrally located classroom space  This building meets all the needs they have ◦ Classroom space ◦ Larger space with less traffic for artifacts