1 IPEK energy GmbH Development and Implementation of a Wind Farm 3rd International Conference on Alternative Energy & Power ICAEP 28 March 2009.

Slides:



Advertisements
Similar presentations
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Advertisements

TITAN Group …….Managing Site Build up for the telecom sector TICS Telecom Projects Consultancy Pvt. Ltd.
SkyPower Corp. PRESENTATION.
Renewable Energy in Islamic Republic Of Iran
Arklow - GEWE 3.6 MW Offshore Project Lessons Learned
Comodan Far East Ltd. Milk cows farm project and milk processing technology. We are honored to offer a complete comprehensive project for a commercial.
© Siemens AG 2011 Hull Offshore Wind Workshop Siemens Wind Power A/S, Thomas Mousten, Offshore Wind Americas.
The Wider Offshore Industry - Introduction. Why Renewables? Mb/doe Gas Nuclear Oil Renewables Coal Incremental.
Making the Right Wind Power Investment University of Toronto Wind Workshop October 12th, 2005 Mike Crawley, President/CEO AIM PowerGen Corporation.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
Wind – tapping into a renewable energy resource
Calvin College Wind Energy Project Engineering 333, Fall 2006 Calvin College Wind Energy Project Engineering 333, Fall 2006 To demonstrate Calvin’s interest.
Cleaner Production Assessment (Chapter 4)
PAKISTAN Wind energy Basics November 2006
Converting Wind to Energy: The University of Maine at Presque Isle Wind Project By Sumul Shah Solaya Energy (A Division of Lumus) May 14, 2009.
Renewable Energy in Oman Public Authority for Electricity and Water Khalil Alzidi Senior Renewable Energy Engineer.
Scandia Wind Southwest LLC Development of large scale windpower Presentation for landowners Bovina May 8th 2009.
Greta’s Grand Valley Wind Farm Contributing to Ontario’s Energy Future March, 2012 Greta Energy Inc.
Wind Turbine Power Plant A wind turbine is a rotating machine which converts the kinetic energy in wind into mechanical energy. If the mechanical energy.
TRP Chapter Chapter 4.2 Waste minimisation.
No Offshore Wind Farm Without Certification European Offshore Wind Conference Dipl.-Ing. Matthias Laatsch Dieser Platz ist für Ihr Bild vorgesehen.
1 | Program Name or Ancillary Texteere.energy.gov Offshore Wind Energy Overview Patrick Gilman Environmental & Siting Specialist Wind and Water Power Program.
VetroEnergo AS Wind Power at the Kola Peninsula Presentation at Bellona Conference 1-2. April 2008 Lars Helge Helvig, Norsk Vind Energi AS.
© Siemens AG All rights reserved. The importance of infrastructure June 2011.
THE POWER OF THE WIND. The wind: a key factor in world economy Wind needs clean, renewable and competitive sources of energy; wind is a very competitive.
In the Name of God Wind Energy in Iran 1.
Design of the Z72 wind turbine with direct drive PM generator
1 Revised Jennifer M. Granholm, Governor Lisa Webb Sharpe, Director Wind Strategy.
Lahmeyer International 2013 Lahmeyer International GmbH Engineering and Consulting Services Energy Division; Business Unit Renewables and Economics CSP.
A Case Study in Community Wind New Ulm Public Utilities Commission - Success with Due Diligence Welcome.
Alstom Wind Madrid, 20 th May 2010 Félix Urrea, VP Operations EMEA.
Iowa Wind Entrepreneurship Workshop Steps in Organizing, Utility Agreements, and Financing October 21, 2005 Iowa Community Entrepreneurship Academy Manning.
Fossil Gulch Wind Park Presented By Jeff Duff Vice President, Airstreams LLC Welcome.
North Eastham Wind Feasibility Study Results Brian Eastman Eastham Energy Committee Kristen Burke Massachusetts Technology Collaborative Ric O’Connell.
Solar Project Performance Assessment
Technical Due Diligence Renewable Energy We build with Passion!
South African Wind Energy Programme A Otto 2 nd Annual Wind Energy Seminar 28 September 2010, Gallagher.
Last update: © Lahmeyer International GmbH Portfolio Effect of Diversified Renewable Energy Sources Gaining benefits from the Portfolio Effect.
How to deliver a Renewable Energy Project Jemma Benson CO2Sense Yorkshire.
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
Click to edit Master title style Click to edit Master text styles –Second level Third level –Fourth level »Fifth level I.S.393:2005 Technical Guideline.
Development and Construction of On- Shore Windfarms Andrew Aveyard Green Cat Renewables Jim Wilkinson CA Blackwells.
GREEN ENERGY THAT WORKS. Greeley Colorado June 30, 2009 Dan Perry – Wyoming/Colorado Equipment AGENDA About Endurance Endurance Products Wind Working.
Supply Opportunities in Canada’s Wind Energy Market Stephen Rach CanWEA Toronto, Ontario October 6, 2010.
Wind – a renewable energy resource.
SUPPLY CHAIN EVENT GLENOUTHER RENEWABLE ENERGY PARK FENWICK HOTEL, 10 TH SEPT 2015.
Mortenson Canada Corporation Proprietary and Confidential Construction and Contracting Clean Energy BC November 8, 2010.
EWEC 2006, Athens1Jan Rispens Wind Energy Agency Bremerhaven/Bremen (Bild: Enron Wind) The WAB Industry Network in Northwest-Germany Profile and R&D-Activities.
Riga 4th December 2008 Renewable energy: is there a Latvian masterplan? Ieva Indriksone Riga Graduate School of Law.
Wind, Wind Power and Vestas Implementation of Wind Power.
SALİM YILMAZ HIGH SCHOOL Mersin, Turkey
Wind Turbines Thomas Reinke Material from this presentation may not be copied, reused in any format.
Nordex high yield wind turbines for all wind regimes
1 Experience from Finland Christian Llull, Ho Chi Minh City, 23rd November 2015 ? Cooperation & Partnership in Wind Project Development.
An Overview of the Technology and Economics of Offshore Wind Farms
Clean Energy Project Analysis Course Clean Energy Project Analysis with RETScreen ® Software © Minister of Natural Resources Canada 2001 – 2004.
Vestas - newest technology in wind generating power Wind and Hydroelectric Plant Investments in Bulgaria’2008 Conference Sofia - 5. January 2008 Dipl.-Ing.
WORLDWIDE WIND ENERGY SOLUTIONS State-of-the-art midsize (50 to 500 kW) wind turbines reducing your energy cost. Designed for industries, farms schools,
Wind Prospect Experience and Practicalities of Wind Energy International Cooperation Forum for Energy Service Companies (ESCO’s) - Opportunities in China.
Challenges for Wind Farm Development in Bulgaria: The Environmental Aspect Case study: Saint Nikola Wind Farm, Kavarna April 2009.
Wind Energy Basics The Kidwind Project
Planning and Realisation of Wind Farms
YEL WIND POWER PROJECT. YEL WIND POWER PROJECT.
Uniper Energy Services
Stage 3: Project Feasibility (II)
Objective: Level 7: Linking key processes
By: Nawaz Haider Bashir SESE_Science GHS Patti Bulanda
Siemens Gamesa Renewable Energy The best technology for your wind projects in Brazil 30 August 2017 © Siemens Gamesa Renewable Energy.
Emerging Wind Energy Market Pakistan
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

1 IPEK energy GmbH Development and Implementation of a Wind Farm 3rd International Conference on Alternative Energy & Power ICAEP 28 March 2009

2 Content Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

3 Content Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

4 IPEK energy GmbH We are an independent engineering & consultancy company support you from acquisition to turnkey ready construction of renewable power generation systems world wide offer skilful support with international financing and after commissioning take the technical business management are very flexible and act in close cooperation with our clients exactly to the requirements of the international markets

5 Key Services Engineering & Consulting acquire suitable sites design of whole wind farm (micro-siting, electrical, civil) complete permitting procedures negotiate required Power Purchase Agreement (PPA) organize international funding supervision of construction till take over of the plan control operations management Wind Measuring standard IEC confirm measuring trough Wind Mast and SODAR measuring Bankable Feasibility Studies Due Diligence Emissions Trading

6 Osman Ipek – Managing Director Electrical Engineer (Main Branch Renewable Energies) Active in Wind Branch since 2000 project development project management project implementation engineering due diligence measurement and monitoring systems wind resource assessment teaching and education, concepts; strategies; system layout 18 Wind farm Projects realized More than 800MW projects developed in 6 countries Due Diligence of more than 220MW wind projects Feasibility studies for more than 40 wind farms Currently on going Projects of >400MW in Turkey, Romania and Pakistan

7 Countries of Work Experience

8 Membership/ Partners Memberships Partners German Wind Energy Association The Association of German Engineers Pakistan Wind Energy Association WINDTEST Grevenbroich GmbH

9 Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

10 A wind turbine obtains its power input by converting the force of the wind into a torque acting on the rotor blades The amount of energy which the wind transfers to the rotor depends - on the density of the air - the rotor area - and the wind speed. In other words you can get more energy: - the "heavier" the air - the “bigger” the rotor - the “higher” the wind speed How does it work

11 690V Components of a Wind Turbine

12 Components of Wind Turbine

13 Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

14 12 Steps to install a wind farm 1. WIND ASSESSMENT... available wind data will be used to estimate how much energy the wind farm will produce. 2. WIND FARM DESIGN Wind data combined with topographical information to design the wind farm..... to model wind flow,... turbine performance... sound levels... to optimize the location of WTG... design the access roads... turbine foundations... local electric network... grid connection

15 3. ENVIRONMENTAL STUDY... to identify any impacts on landscape, plants and wildlife, soil and water, land use, aviation, telecommunications, etc. 4. LAND ACQUISITION... to negotiate “option” agreements to use land 5. PERMITTING AND PUBLIC CONSULTATION... seek municipal, provincial and federal permits before the project can go ahead.... meet the local communities to present the project, solicit their feedback and seek community support. 12 Steps to install a wind farm

16 6. ECONOMIC AND FINANCIAL ANALYSIS … demonstration of the economic viability of the project to raise the funds … estimate the cost of turbines and their installation, as well as roads, electrical system, operation and maintenance, etc.... estimate the income by using the energy production of the wind farm over the lifetime of the project 7. MANUFACTURING WTG parts are manufactured and pre-assembled into the main components at the factory and shipped to the wind farm site where the final assembly will take place. 12 Steps to install a wind farm

17 8. SITE PREPARATION The wind farm site will be prepared before the WTG will arrive to site.... access roads, clear the areas where turbines will be erected... preparation of the foundations (do the excavating; installing the formworks; pouring concrete) 9. CONSTRUCTION After arrival of all components, the assembly can take place by using a crane to erect the tower and install the nacelle and rotor with its hub and blades. Same time the electrical works will be performed 12 Steps to install a wind farm

COMMISSIONING The wind farm will tested before becoming fully operational. 11. OPERATION AND MAINTENANCE A variety of skill sets are required to ensure the effective operation of a Wind Farm (activities be performed on a regular basis throughout the project’s, monitoring and analyzing performance, performing preventive maintenance and repairs on the turbines) 12. ….. 12 Steps to install a wind farm visit Hall 1 – A36

19 Steps from LOI to Implementation

20 Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

21 On Site Wind Measuring (example)

22 Compliance with the site wind conditions Specific costs (e. g. costs per kWh) Readiness of supplier to offer turbines Commitment to the market Delivery time Warranties: power curve, availability, grid compliance Completeness of technical documentation Track record of WTG model Company: position in market, financial strength, etc. Operation and Maintenance concept Crane availability Selection Criteria for Wind Turbines

23 Different size of WTGs / Cost per kW WTG: 1MW, 70m hub WTG: 2MW, 100m hub

24 Large wind farm vs. smal wind farm Source:

25 Selection Criteria for Wind Turbines Availability of 400t cranes is higher than 600t  WTG <2MW should be selected for Pakistan

26 Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

27 No Gearbox Synchronous Generator Self Cooling No Pitch gear Selected Wind Turbine: VENSYS

28 Generator is fully encased (protected against dust/sand) Generator & Cooling system

29 Maintenance friendly No Crane needed AC Pitch motor Capacitor instead Batteries Less maintenance

30 Compliance with the site wind conditions Specific costs (e. g. costs per kWh) Readiness of supplier to offer turbines Commitment to the market Delivery time Warranties: power curve, availability, grid compliance Completeness of technical documentation Track record of WTG model Company: position in market, financial strength, etc. Operation and Maintenance concept Crane availability Selection Criteria for Wind Turbines - the shortest delivery time comparing to other - OK - optimal - OK – Less maintenance - OK for 400t crane

31 Draft Time Table

32 Company Profile Wind energy - an introduction Steps to install a wind farm Selection of wind turbines Selected wind turbine for ZORLU: VENSYS Project implementation

33 WF site of Zorlu together with neighbors FFC and Masterwind North

34 Wind resource map at 69m

35 Wind resource map at 85m

36 Wind turbine siting

37 Noise and Shadow analysis

38 Scales of noise emissions Jet Airplane Industrial Noise Typewriter Leaf Fall Whispering Air Hammer Inside Car Home Office Wind Turbine Jet Airplane Industrial Noise Typewriter Home Whispering Air Hammer Inside Car Wind Turbine

39 85m wind measuring mast of ZORLU The highest wind measuring mast in Pakistan

40 Ground Breaking Ceremony ZORLU January 2007

41 Transportation study

42 Transport problems identified and solved

43 Implementation - Soil Study

44 Implementation- Seismic Study

45 Implementation - Public Consultation

46 Impressions

47 Foundation works

48 Wind Farm cabling

49 Coordination Meetings & start of Installation

50 Installation of WTG

51 Installation

52 Internal electrical works

53 Pakistan first wind turbine

54 The first wind farm of Pakistan

55 Thank you for your attention

56 Contact IPEK energy Pakistan Pvt. Ltd. 89/II Khayaban-e-Shujaat DHA Phase VI Karachi - Pakistan Tel.: Fax: For any further information please contact us: Hall-1 A60