University of Maryland 1 Center for Advanced Life Cycle Engineering Using Maintenance Options to Optimize Wind Farm O&M Xin Lei, Peter Sandborn, Navid.

Slides:



Advertisements
Similar presentations
Evolution of Parametric Analysis within Rolls-Royce Purchasing
Advertisements

Strategies for Wind Power Trading in Sequential Short–Term Electricity Markets Franck Bourry and George Kariniotakis Center for Energy and Processes EWEC.
 Derivatives are products whose values are derived from one or more, basic underlying variables.  Types of derivatives are many- 1. Forwards 2. Futures.
Capital Budgeting. Cash Investment opportunity (real asset) FirmShareholder Investment opportunities (financial assets) InvestPay dividend to shareholders.
EGR Evaluation Alternatives Present Worth Analysis Companies constantly evaluate whether or not to pursue projects. Mutually Exclusive Projects.
Chapter 10 Derivatives Introduction In this chapter on derivatives we cover: –Forward and futures contracts –Swaps –Options.
Valuation of Financial Options Ahmad Alanani Canadian Undergraduate Mathematics Conference 2005.
EWEC 2007 Milano Drs. J.P. Coelingh, senior consultant Wind and power derivatives in project financing.
Advanced Forecasting & Procurement for Microsoft Dynamics NAV Presented to ABC Annual Conference 2011 May 12, 2011.
Computer Engineering 203 R Smith Project Tracking 12/ Project Tracking Why do we want to track a project? What is the projects MOV? – Why is tracking.
1.  Purpose  To present Staff’s Preliminary Findings on the 2012 Integrated Resource Plans of:  APS – Arizona Public Service Company  TEP – Tucson.
GoldSim 2006 User Conference Slide 1 Vancouver, B.C. The Submodel Element.
Supply Chain Operations: Planning and Sourcing
State Incentives for Energy Efficiency Commercial and Industrial New Jersey Board of Public Utilities Office of Clean Energy Mona L. Mosser Bureau of Energy.
Chapter 11 Replacement Decisions
© 2008 Pearson Education Canada13.1 Chapter 13 Hedging with Financial Derivatives.
Chapter 15 Replacement Decisions
Date: 03/05/2007 Vendor Management and Metrics. 2 A.T. Kearney X/mm.yyyy/00000 AT Kearney’s IT/Telecom Vendor Facts IT/Telecom service, software and equipment.
(c) 2002 Contemporary Engineering Economics 1 Chapter 3 Cost Concepts and Behaviors General Cost Terms Classifying Costs for Financial Statements Cost.
Concession Length and Investment Timing Flexibility Chiara D’Alpaos, Cesare Dosi and Michele Moretto.
Opportunity Engineering Harry Larsen The Boeing Company SCEA 2000 Conference.
20% by 2030 The future of wind energy in New Zealand Eric Pyle, Chief Executive.
Value of Flexibility an introduction using a spreadsheet analysis of a multi-story parking garage Tao Wang and Richard de Neufville.
Structured Transaction Overview. FDIC serves as an equity partner in its Receivership capacity for a single or multiple institution transaction. Joint.
Case 1: Optimum inspection and maintenance rates (wind turbine is available during inspection) Case 2: Optimum inspection and maintenance rates (wind turbine.
Fleet Performance and Reliability in Generation Utilities
EWEC Athens Opportunities in Outsourcing O&M 01 March 2006.
Perfect Competition *MADE BY RACHEL STAND* :). I. Perfect Competition: A Model A. Basic Definitions 1. Perfect Competition: a model of the market based.
Professor XXXXX Course Name / # © 2007 Thomson South-Western Chapter 18 Options Basics.
NGEIR Technical Conference Presentation May 16, 2006.
Backup Agreements in Fashion Buying-The Value of Upstream Flexibility Eppen and Iyer (1997) Presented By: Hakan Umit 21 April 2003.
Global WINDPOWER Chicago, Illinois Assessment of Potential Improvements in Large-Scale Low Wind Speed Technology Joseph Cohen Princeton Energy Resources.
KEC Electricity Committee, March 12, 2008 Benefit Cost Study of the Governor’s 2015 Wind Challenge: 1,000 MW by 2015 Bob Glass KCC Utilities Division,
Richard E. Thompson II, Esq.
Intermeiate Investments F3031 Futures Markets: Futures and Forwards Futures and forwards can be used for two diverse reasons: –Hedging –Speculation Unlike.
RNGs in options pricing Presented by Yu Zhang. Outline Options  What is option?  Kinds of options  Why options? Options pricing Models Monte Carlo.
PACIFIC NORTHWEST & ALASKA RISK MANAGEMENT EDUCATION REGIONAL CONFERENCE March Spokane, Washington.
WSPP Contract Subcommittee February 3, 2011 Meeting Notes These notes are to facilitate discussions of a WSPP REC Service Schedule, are subject to revision,
How Aircraft Operators Can Benefit from PHM Techniques Big Sky - Montana 2012 IEEE Aerospace Conference Leonardo Ramos Rodrigues EMBRAER S.A., São José.
ECE 7800: Renewable Energy Systems
Western Energy Markets Working Group Form of California ISO Market Redesign and Technology Upgrade (MRTU) Contract Amendment Panelist: Jeremy D. Weinstein.
11 Grouping of mainteance activities Jørn Vatn, NTNU.
Assessment of Large-Scale Marine Energy Deployment 1/17 Economic Assessment of Large- Scale Wave Energy Deployment.
Real Options Chapter 8 A 4-Step Process for Valuing Real Options.
Acquisition of Additional Stake in Game Show Network (GSN) Post IC and GEC Meeting Update DRAFT.
Engineering Systems Analysis for Design Massachusetts Institute of Technology Richard de Neufville  Real Options SDMSlide 1 of 31 Richard de Neufville.
1 EXAKT SKF Phase 1, Session 2 Principles. 2 The CBM Decision supported by EXAKT Given the condition today, the asset mgr. takes one of three decisions:
Costing and accounting system Session 1-2. Types of inventory Direct material ▫Which represent direct material in inventory awaiting manufacture. Work.
Third-Party Solar Financing Options in New Hampshire 1.
Demand Response
8.1 Costs and Output Decisions in the Long Run In this chapter we finish our discussion of how profit- maximizing firms decide how much to supply in the.
WSPP Webinar Proposed Service Schedules Operating Reserve Service (D) Intra-Hour Supplemental Power (E) February 4, 2010.
Accounting (Basics) - Lecture 5 Lease. Contents Classification of leases Finance leases - financial statements of lessees and lessors Operating leases.
Resource Analysis. Objectives of Resource Assessment Discussion The subject of the second part of the analysis is to dig more deeply into some of the.
Acquisition of Additional Stake in Game Show Network (GSN) Post IC and GEC Meeting Update DRAFT.
Structural & Multidisciplinary Optimization Group Deciding How Conservative A Designer Should Be: Simulating Future Tests and Redesign Nathaniel Price.
Equipment Life Optimization Program (ELOP) Doug Hilleman February 10, 2011.
Producer Choice: The Costs of Production and the Quest for Profit Mr. Griffin AP ECON MHS.
Session 22 (R) Utility Scale Solar Development Power Purchase Agreements (PPAs) April 04, 2016.
Reliability-Must-Run (RMR) Cost Evaluation and Settlement Basis Ino González ERCOT RMR Workshop May 24, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Accounting (Basics) - Lecture 5 Lease
Types of risk Market risk
Wind Composite Services Group/WindCom
Center for Advanced Life Cycle Engineering (CALCE)
Flexible Forward Contracts for Renewable Energy Generators
Types of risk Market risk
Across the entire value chain
Chapter 12 Determining the Optimal Level of Product Availability
Managerial Accounting 2002e
Presentation transcript:

University of Maryland 1 Center for Advanced Life Cycle Engineering Using Maintenance Options to Optimize Wind Farm O&M Xin Lei, Peter Sandborn, Navid Goudarzi, Roozbeh Bakhashi, Amir Kashani-Pour Center for Advanced Life Cycle Engineering (CALCE) Mechanical Engineering Department University of Maryland NAWEA 2015 June 11, 2015

University of Maryland 2 Center for Advanced Life Cycle Engineering Introduction Operation and Maintenance (O&M) is a large contributor to the life-cycle cost of wind farms, therefore the prediction and optimization of maintenance activities provides a significant opportunity for life-cycle cost reduction. Maintenance practices for turbines include: -Scheduled preventive maintenance -Corrective maintenance -Predictive maintenance based on prognostics and health management (PHM) or condition monitoring (CM) This paper applies the concept of predictive maintenance options to both single wind turbines and wind farms managed via power purchase agreements (PPAs) to determine the optimum maintenance dates

University of Maryland 3 Center for Advanced Life Cycle Engineering Prognostics and Health Management (PHM) Establish failure warnings and a remaining useful life (RUL) Use the RUL estimate to drive actions to manage systems in such a way as to minimize the life-cycle cost of the system Maintenance options address how you get “value” from the RUL Individual turbine Wind farm

University of Maryland 4 Center for Advanced Life Cycle Engineering Maintenance Options Options: Switch to a redundant subsystem (if any) Slow down Shut down Do nothing If I could determine the value of each of the options, I would have a basis upon which to make a decision about what action to take in response to the RUL prediction Predicted Remaining Useful Life (RUL) Options: Maintain at earliest opportunity Wait until closer to the end of the RUL to maintain Run to failure for corrective maintenance Predictive Maintenance Opportunity

University of Maryland 5 Center for Advanced Life Cycle Engineering A Real Options View of Predictive Maintenance Real Options: The flexibility to alter the course of action in a real assets decision, depending on future developments. - The buyer of the (call) option gains the right, but not the obligation, to engage in the transaction at the future date Predictive maintenance opportunities triggered by RUL predictions can be treated as Real Options - Buying the option = paying to add PHM into wind turbine subsystems - Exercising the option = performing predictive maintenance prior to failure - Exercise price = predictive maintenance cost - Value returned by exercising the option = revenue lost (negative) + cost avoidance (positive) due to predictive maintenance - Letting the option expire = do noting and run the turbine to failure then perform corrective maintenance

University of Maryland 6 Center for Advanced Life Cycle Engineering Predictive Maintenance Value Simulation for a Single Turbine Revenue Lost due to predictive maintenance - Representing the value of the part of the RUL thrown away Cost avoidance due to predictive maintenance including: - Avoided corrective maintenance cost (parts, service, labor, etc.) - Avoided revenue lost during downtime for corrective maintenance - Avoided under-delivery penalty due to corrective maintenance (if any) - Avoided collateral damage Predictive Maintenance Value = Cost Avoidance + Revenue Lost Revenue lost due to predictive maintenance Time Day 0 End of RUL Cost avoidance by predictive maintenance Day 0 End of RUL Time Predictive maintenance value Day 0 End of RUL Time Benefit obtained from predictive maintenance at optimum point in time

University of Maryland 7 Center for Advanced Life Cycle Engineering Path = starting at the RUL indication (Day 0), it is one possible way that the future could occur The revenue path represents the possible revenue due to uncertain wind resources The cost avoidance path represents how the RUL is used up and varies due to uncertainties in the predicted RUL Each path is a single member of a population of paths representing a statistically significant set of possible future turbine states Path Generation

University of Maryland 8 Center for Advanced Life Cycle Engineering Wind Speed and TTF Simulation Wind turbine: Vestas V MW Offshore Location of NOAA Buoy Weibull fitted wind speed PDF Hub height simulated wind speed Wind speed simulation to 2012 wind data of NOAA Buoy (in the Maryland Offshore Wind lease area) fitted with Weibull Distribution - Monte Carlo simulation used to get buoy height wind speed paths - Power Law used to transfer buoy height wind speed to hub height Time to Failure (TTF) - Wind speed → rotor rotational speed → RUL consumption rate → TTF - Represents how the RUL is used up for the subsystem with the RUL prediction (assuming turbine fails thereafter) - Uncertainties in the predicated RUL (in cycles) and wind considered (UMCP/AOSC: Zeng, Martin; MDA Inc.: Kirk-Davidoff)

University of Maryland 9 Center for Advanced Life Cycle Engineering Predictive Maintenance Value Simulation for a Single Turbine (continued) Considering the uncertainties in the RUL predictions and future wind speeds: Revenue lost paths Cost avoidance paths Predictive maintenance value paths Path terminate at different times due to RUL uncertainties Paths change slope because annual energy delivery target (from PPA) has been reached)

University of Maryland 10 Center for Advanced Life Cycle Engineering Predictive maintenance can only be performed on specific dates On each date, the decision-maker has flexibility to determine whether to implement the predictive maintenance (exercise the option) or not (let the option expire) This makes the option a sequence of “European” style options that can only be exercised at specific points in time in the future Real Option Analysis (ROA) is performed for the option valuation: - Predictive maintenance option value = max[(predictive maintenance value - predictive maintenance cost), 0] Predictive maintenance value Day 0 Time Predictive maintenance opportunities Predictive maintenance cost Predictive maintenance option value Day 0 Time Predictive Maintenance Option Valuation for a Single Turbine (continued)

University of Maryland 11 Center for Advanced Life Cycle Engineering On each predictive maintenance opportunity date, ROA is implemented on all paths and the results are averaged to get the expected predictive maintenance option value This process is repeated for all maintenance opportunity dates to determine the optimum maintenance date Predictive maintenance possible every day Optimum maintenance date: Day 5 Predictive maintenance possible every 2 days Optimum maintenance date: Day 4 Predictive maintenance possible every 3 days Optimum maintenance date: Day 3 Predictive Maintenance Optimization for a Single Turbine (continued)

University of Maryland 12 Center for Advanced Life Cycle Engineering Extension to Wind Farms A wind farm may consist of hundreds of individual wind turbines Wind farms are typically managed via outcome-based contracts (e.g., a Power Purchase Agreements) Maintenance will be performed on multiple turbines (and multiple turbine subsystems) on each maintenance visit to the farm because, - Expensive resources are required (e.g., cranes, helicopters, vessels) - Maintenance windows are limited due to the harsh environments Therefore, we must be able to determine the best maintenance date for multiple activities by accumulating the option values

University of Maryland 13 Center for Advanced Life Cycle Engineering Power Purchase Agreement (PPA) A long term outcome-based contract between the wind energy seller and the energy buyer PPA modeling: Contract energy price - Wind farm annual energy delivery target agreed to by the seller and buyer - Contract energy price applies for each MWh before the target is met Over-delivery energy price - Over-delivery energy price applies for each MWh exceeding the target - Over-delivery energy price lower than the contract energy price Under-delivery penalty - Buyer buys energy from other sources (e.g., burning coal/oil) with replacement energy price for each MWh under-delivered - Seller compensates buyer for each MWh under-delivered with a compensation energy price (equals to the difference between the replacement energy price and the contract energy price)

University of Maryland 14 Center for Advanced Life Cycle Engineering PPA Example Purchaser: City of Anaheim, CA 20-year agreement signed in 2003 Contract energy price: $53.50/MWh of delivered energy Constant energy delivery requirement in each hour From the contract: Sources of Electric Energy and Environmental Attributes - “Seller may obtain electric energy for delivery at the Delivery Point from market purchases or from any other source or sources or combination thereof as determined by Seller in its sole discretion” Nothing in the contract says “only when the wind blows” or “only if the turbines are running” Seller: PPM Energy, Inc. (now Iberdrola Renewables)

University of Maryland 15 Center for Advanced Life Cycle Engineering Wind Farm Example Assume a 5-turbine-farm managed via a PPA, Turbines 1 & 2 indicate RULs on Day 0, Turbines 3, 4 & 5 operate normally Predictive maintenance value paths of all turbines with RULs need to be combined together -Because maintenance will be performed on multiple turbines on each visit The PPA will influence the combined predictive maintenance value paths -Revenue Lost due to predictive maintenance is influenced by: Contract energy price Over-delivery energy price Wind farm annual energy delivery target Wind farm cumulative energy delivery from the beginning of the year to Day 0 -Cost Avoidance due to predictive maintenance is influenced by: Contract energy price Over-delivery energy price Compensation energy price Wind farm annual energy delivery target Wind farm cumulative energy delivery from the beginning of the year to Day 0

University of Maryland 16 Center for Advanced Life Cycle Engineering Predictive Maintenance Value Simulation for a Wind Farm Considering the uncertainties in RUL predictions and future wind speeds: Revenue lost pathsCost avoidance paths Predictive maintenance value paths

University of Maryland 17 Center for Advanced Life Cycle Engineering Optimum maintenance plan for the turbines with RULs in a farm subject to a PPA may not be the same as individual turbines managed in isolation Predictive maintenance possible every 2 days Optimum maintenance date: Day 4 5-turbine-farm, Turbines 1 & 2 have RULs, the other 3 turbines work normally Turbine 1 managed in isolation Turbine 2 managed in isolation Predictive maintenance possible every 2 days Optimum maintenance date: Day 4 Predictive maintenance possible every 2 days Optimum maintenance date: Day 2 Predictive Maintenance Value Simulation for a Wind Farm (continued)

University of Maryland 18 Center for Advanced Life Cycle Engineering When the number of turbines down changes, optimum predictive maintenance date may also change: Predictive maintenance possible every 2 days Optimum maintenance date: Day 4 Predictive maintenance possible every 2 days Optimum maintenance date: Day 4 Predictive maintenance possible every 2 days Optimum maintenance date: Day 2 5-turbine-farm, Turbines 1 & 2 have RULs, 0 turbines down 1 turbine down 2 turbines down Predictive Maintenance Value Simulation for a Wind Farm (continued)

University of Maryland 19 Center for Advanced Life Cycle Engineering Summary The work in this paper enables optimum maintenance scheduling for wind farms with PHM that are subject to a PPAs that may include variable prices and penalties Optimum maintenance scheduling = maintenance dates and actions that minimize the life-cycle cost and maximize the revenue generated for the wind farm Uncertainties in wind and the accuracy of the RULs forecasted by the PHM approach are included The optimum maintenance plan for the turbines with RULs in a farm subject to a PPA may not be the same as individual turbines managed in isolation