OARnet Update Linda Roos Gathering of State Networks February 4, 2004.

Slides:



Advertisements
Similar presentations
MyFloridaNet Presented to The State of Florida E911 Board
Advertisements

Infrastrukturë Backbone ALBANIAN NATIONAL FIBER OPTIC NETWORK.
Chapter 3: Planning a Network Upgrade
Network Architectures OARTech Paul Schopis October 13, 2005.
ONE PLANET ONE NETWORK A MILLION POSSIBILITIES Barry Joseph Director, Offer and Product Management.
Ohio’s Broadband Initiative Broadband Summit San Jose, CA Pankaj Shah, Director of Networking Ohio Supercomputer Center 06/29/07.
Outside Spend Team - Update to the Staff Advisory Council August 14,
UCT Campus Network Upgrade University of Cape Town supaTsela PIC 14 July 2005 Network Blueprint.
National LambdaRail, Inc – Confidential & Proprietary 1 National LambdaRail Overview/Review 3 May 2005 Internet2 Spring Members Meeting Layers 2 & 3 User’s.
Network Updates August 12, Network Backbone Updates Will be rolling eTech IP services directly on to backbone – Need tech council approval – Helps.
SBC Media Briefing Media Update May 9, 2001 Ross Ireland Senior Executive Vice President, Chief Technical Officer Abha Divine Vice President – Corporate.
FiberCo/WaveCo Update Joint Techs February 12, 2007 Minneapolis, Minnesota.
RIT Campus Data Network. General Network Statistics Over 23,000 wired outlets Over 14,500 active switched ethernet ports > 250 network closets > 1,000.
1 TDC 363 Local Area Networks Metropolitan Area Networks (MAN)
Internet2 A Project of the University Corporation for Advanced Internet Development Ted Hanss Director, Applications Development VIEWNET April 1998.
Financially Sustaining the University Geoffrey S. Chatas Senior Vice President Chief Financial Officer Business and Finance October 27, 2011.
St. Joe Valley MetroNet Technology Symposium May 27, 2004.
Company and Product Overview Company Overview Mission Provide core routing technologies and solutions for next generation carrier networks Founded 1996.
Lighting The Fiber ‘The Road to an Operational RON’ j.p.streck (NC State/NCNI/NCLR) m.johnson (MCNC/NCNI/NCLR)
EWAN Equipment Last Update Copyright 2010 Kenneth M. Chipps Ph.D. 1.
TFN Status 8/2004 Turn-up Targets TFN Optical layer scheduled for completion September 2004, Routing layer scheduled for completion by October, All.
1 October 20-24, 2014 Georgian Technical University PhD Zaza Tsiramua Head of computer network management center of GTU South-Caucasus Grid.
May 2001GRNET GRNET2 Designing The Optical Internet of Greece: A case study Magda Chatzaki Dimitrios K. Kalogeras Nassos Papakostas Stelios Sartzetakis.
Don McDaniel, DIS Network Services Division Administrator Next Generation State Network.
1 The Quilt Wendy Huntoon Executive Director, The Quilt I2 Members Meeting May 8, 2002.
Gigabit to the Last Mile in Utah The Status of UEN’s Project to Provide GigE Connections to all Schools, Colleges and Universities in Utah.
1 Interconnecting the Cyberinfrastructure Robert Feuerstein, Ph.D.
TFN Updates 8/8/03 Fiber Status Backbone Fiber Status –Backbone all segments completed and tested except Athens to Columbus –Regen Hut in Lancaster pending.
OSC (Ohio Supercomputer Center) 1224 Kinnear Road, Columbus, OH (614) www.osc.edu THIRD FRONTIER OVERVIEW OPLIN MEETING April.
Multi-Use Network Update Presented to: Colorado Higher Education Computing Organization CHECO Spring Conference 2001.
Future of Library Network Equipment (Edge Equipment)
Policy Committee Meeting Fiscal Year 2004 Budget Considerations: Dark Fiber November 13, 2002.
Enterprise Architecture and Infrastructure Progress Report for Committee on Technology and Architecture March 2012 Mark Day Dept. of Radiology & Biomedical.
Next Generation Network for Ohio OH 1 Ohio Digital Government Summit October 2004.
OARtech OARnet Technical Update Paul Schopis OARnet October 8, 2008.
1 Second ATLAS-South Caucasus Software / Computing Workshop & Tutorial October 24, 2012 Georgian Technical University PhD Zaza Tsiramua Head of computer.
Top Issues Facing Information Technology at UAB Sheila M. Sanders UAB Vice President Information Technology February 8, 2007.
P AKISTAN E DUCATION & R ESEARCH N ETWORK PERN2 – Looking into the Future.
The Jordanian Universities Network Yousef Torman Executive Director TNC th May, 2006 Catania, Italy.
Example: Sorting on Distributed Computing Environment Apr 20,
Copyright 2004 National LambdaRail, Inc N ational L ambda R ail Update 9/28/2004 Debbie Montano Director, Development & Operations
AKM HABIBUR RAHMAN CEO, BdREN 1 MeetBdREN March 2015 Nabab Nawab Ali Chowdhury Senate Bhaban: University of Dhaka.
Running more bandwidth for less dollars State of Arkansas Network Upgrades.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
Introduce the project Africa IXP (Team 4). Introduce team members.
December 8, 2005Ohio Board of Regents Articulation and Transfer Clearinghouse 1 Articulation and Transfer Clearinghouse (ATC) Articulation and Transfer.
RENU Design Overview October Acknowledgement 2 The bulk of information contained in this presentation is the result of a design session in Seattle.
The Next Big Thing April 24, 2012 Internet2 Spring Member Meeting Paul Schopis, Chief Technology Officer OARnet.
A RON in Ohio Linda Roos A Gathering of State Networks February 9, 2005.
State of Illinois General Notice for Pending Request for Proposal Statewide Telecom Network Voice & Data Services Contract(s) RFP Request ID #
Connecticut Education Network “Forum” June 14, 2001.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Help Desk Working at a Small-to-Medium Business or ISP – Chapter 2.
OARnet Doug Gale October, 2001 OARnet’s Dark Fiber Initiative.
Regional Optical Networks and Evolving US National Research and Education Networking Paul Schopis, OARnet Dale Smith, University of Oregon International.
“MITI” Massachusetts Information Turnpike Initiative “New StateNets” Presentation February 13 th, 2008.
© 2015 Universal Service Administrative Company. All rights reserved E-rate Program Applicant Trainings I Fiber Options1 Fiber Options Deep Dive:
Fiber Acquisition and Implementation Internet2 – Joint Techs July 17, 2006.
© 2007 Cisco Systems, Inc. All rights reserved.Cisco Public ITE PC v4.0 Chapter 1 1 Planning a Network Upgrade Working at a Small-to-Medium Business or.
Taking your Business Technology Further. First Communications: At A Glance Technology Provider since 1998, serving thousands of Businesses throughout.
RENU Design Overview October Acknowledgement 2 The bulk of information contained in this presentation is the result of a design session in Seattle.
1 Wide Area Network Project Information Technology Advisory Committee March 21, 2007.
CTIS Committee Meeting March 23 rd 2016 Chairwoman Jan Hallums-Quillman Councilwoman Bettye Gavin Councilman Pat Mudron.
Shared Service Delivery in the Windy City Patrick Christian University of Wisconsin July 17, 2006.
© 2003, Cisco Systems, Inc. All rights reserved. 2-1 Campus Network Design.
TFN/OARnet update OARtech December 14, 2005 Paul Schopis
FiberCo/WaveCo Update
SURFnet6: the Dutch hybrid network initiative
Chapter 1: WAN Concepts Connecting Networks
Regional Broadband 101 Efforts and Impacts
PROJECT THOR Impact on the Region
Presentation transcript:

OARnet Update Linda Roos Gathering of State Networks February 4, 2004

Today’s Presentation OARnet background OARnet current network Third Frontier Network

OARnet Background Founded 1987 as part of the Ohio Supercomputing Center 90+ higher ed member institutions Board of Regents funding OSTEER advisory council Internet2 gigapop

OARnet Background Over 2 million users downstream 1.8 Gigabits of commodity internet Ohio Valley Gigapop (Internet2) 2.5 Gbps Maintain over 4000 interfaces IP over ATM

Third Frontier Network Project Rationale History Backbone Acquisition and Funding Project Implementation

Project Rationale Started with a Bold Vision –The Ohio Plan: a $900 million research and commercialization effort Now Ohio’s $1.6B Third Frontier Project –A Dark fiber network was essential to the plan Ohio has a diverse and distributed array of research universities –The state needs to use all its resources effectively Universities need to be connected to business & industry Goal: “researcher in Athens and colleague in Cleveland could work together as if labs next door to each others”

Rationale, continued Network Plan was Built on a Strong History –Ohio Supercomputer Center and the Ohio Academic Resources Network (OARnet) were created in the mid-1980s –SchoolNet created in the mid-1990s

Rationale, continued Why was Dark Fiber essential? –Cost and cost structure –Ability to manage the network to ensure: Quality of Service Smooth scalability

History Given these circumstances, Ohio started to look at how to create a dark fiber network. In 2001, OARnet made a tentative commitment to a start-up, Mission Networks, that proposed to deploy a new fiber network to Tier 2 and 3 cities in Ohio. In early 2002, Mission Networks was unable to complete the financing for its project and did not build the network.

History It created the idea of a project structure where –Phase 1 would be replacing OARnet’s backbone with dark fiber –Phase 2 would connect Ohio’s public universities, private research universities, and federal labs to the network with dark fiber –Phase 3 would be connecting other universities and colleges to the network. Recommended moving forward with an RFP for Phase 1

New Network

Backbone Acquisition In Summer of 2002, an RFP was issued Dark fiber was strongly preferred, but vendors were invited to propose alternative leased services. Vendors who bid dark fiber were required to offer a minimum of a single pair of fiber over their network.

Backbone Acquisition, cont. Statewide dark fiber committee decided –leased lambdas were too expensive and not widely available. Selected a bid from Spectrum Networks that offered a package of fiber from –American Electric Power –Williams Communications (Wiltel), and –American Fiber Systems (AFS)

Backbone Acquisition, cont. Bid offered –Single pair of fibers –Connecting all of cities where OARnet had a POP. –City rings in Cleveland and Columbus A public ring was already in place in Cincinnati –Rings offering redundant routes to major cities.

Backbone Acquisition, cont. Fiber Purchased –More than 1600 route miles –$4.6 M for 20 year IRUs (Indefeasible Right of Use) –$342K/yr for maintenance –Multiple types of fiber SMF-28, Teralight, and Truewave Classic Aerial and buried

Backbone Financing Financing from Ohio State University –Long-term financing to pay for fiber ($7M) To be repaid by what OARnet had spent on its previous backbone –Short-term financing ($2M) To cover cost of running both networks in parallel and other start-up costs. Financing from state capital budget –($8.5M) To pay for equipment and last-mile connections for public universities, private research universities, and federal labs (17 institutions).

Project Implementation Guiding the project development –Multi-agency policy committee SchoolNet, DAS, OBR, OSC, and OARnet –OARnet Advisory Committees Lighting and Architecture; Price Modeling Committee; Last Mile Committee; Implementation Committee –OARnet Internal Staff Responsibilities Project Management Site Preparation Network Management

Implementation, cont. First Two Tasks: Integration and Conversion 1.Integration of purchased fibers Additional IRUs and Right of Ways are required Fiber cannot be characterized until fibers are connected Equipment can not be specified until fibers are characterized. 2.Preparation for Conversion by connecting new POPs to old POPs. Reduces the time required for conversion from old network to new network Decreases the time needed to run both networks concurrently.

Implementation, cont. Lessons learned –With multiple types of fiber, fibers will have different core sizes and splices will create inevitable core mismatches increasing attenuation. You want to minimize the number of these splices if you want to support high-speed bandwidth. –Integration can be as or more legally complex process than purchasing the backbone fiber. There are many more fiber purchase, right-of- way, and maintenance agreements required.

Equipment Architectural choices –DWDM at the transport layer So we can have multiple private networks each with its own lambda Ability to provide Lambda for individual research project –MPLS rather than SONET Does not use as much bandwidth for overhead Provides equivalent fail-over times.

Equipment Equipment Selection –Cisco selected for both Optical and Switching Gear Cisco DWDM GSR Routers –Equipment bought through SBC SBC will do fiber characterization, configure, pretest, and install equipment. OARnet Team responsible for site preparation

Equipment Status –Equipment staged and tested at SBC facility –Installation commencing following site surveys and fiber characterization –Equipment being installed currently

Other Events RFP has been issued for last-mile connectivity to all higher education and K-12 telecom aggregation sites; vendors responded, proposals being reviewed. Setting policies on connecting to the network –Including business use of the network.

Next Steps Light and test backbone in April/May/June Connect first 17 institutions in June/July

Contact Information Linda Roos OARnet