DAQ Status. F.S. Cafagna, Coll. Meeting 16 March 2009 2 Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply 

Slides:



Advertisements
Similar presentations
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Advertisements

Questionnaire Response
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
June 19, 2002 A Software Skeleton for the Full Front-End Crate Test at BNL Goal: to provide a working data acquisition (DAQ) system for the coming full.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
CMS Tracker Week – Module Test Meeting – July 2003 – Patrick Gartung 1 Long term rod testing software Patrick Gartung University of California, Riverside.
CMS Tracker Week – Module Test Meeting – April 2003 – Patrick Gartung 1 Status of US long term module testing Patrick Gartung University of California,
Fabrication & Assembly of Opto-Rx12 Modules for CMS- Preshower S. K. Lalwani Electronics Division Bhabha Atomic Research Centre Mumbai –
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
Tuesday September Cambridge1 GDCC “next replacement of the LDA” Franck GASTALDI.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Markus Joos, EP-ESS 1 “DAQ” at the El. Pool Aim and preconditions Hardware Operating system support Low level software Middle level software High level.
SITRA Test beams Simulations Zdeněk Doležal Charles University Prague Annual EUDET meeting Munich October 2006.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs – Me Comp1 11K hrs, Comp2 11K, Comp3 20K, Comp4 18K Service cold.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
John Coughlan Tracker Week Feb FED Status FED Production Status Transition Card.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
CMS ECAL Week, July 20021Eric CANO, CERN/EP-CMD FEDkit FED Slink64 readout kit Dominique Gigi, Eric Cano (CERN EP/CMD)
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
Mobile DAQ Testbench ‘Mobi DAQ’ Paulo Vitor da Silva, Gerolf Schlager.
27 August cp EPTAB5 1. Electronic Systems Support EPTAB 5 27 August 2003 News & Information Chris Parkman Catherine Moine.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Status of NA62 straw electronics Webs Covers Services Readout.
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
Tracker Week October CCLRC, Rutherford Appleton Laboratory, Oxon, UK Imperial College, London, UK Brunel University,
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
BB5 and commissioning DAQ E. Pasqualucci. BB5 DAQ Design of the system DAQ status Debug status Online analysis People training.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Power supplies dismounted Shipped to Orsay this week Refurbishment work to start.
Software Standard CMS FEC software for the control part We have been advised to look for a shortcut in order to give triggers to the VFAT via the FEC –We.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Ervin DÉNES Collab Meeting, 23 – Emulating TOTEM Front-End Driver for trackerDAQ sw.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (1) Firmware: - 3 different ALTERA FPGA’s Cyclone Stratix Stratix.
New DAQ at H8 Speranza Falciano INFN Rome H8 Workshop 2-3 April 2001.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Tracker Week February presented by John Coughlan RAL FED Status FEDv2 Testing Pre-Series Manufacture Final Production.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – March TOTEM System in H8 - Overview, Block Diagram and Main Characteristics Applications -
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
G. Dissertori ETHZ CMS Electronics ECAL DCS Software Planning G. Dissertori ETHZ
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – TOTEM Front End Driver VME64x Host Board OptoRX Firmware.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
1 DCS Meeting, CERN (vydio), Jun 25th 2013, A. Cotta Ramusino for INFN and Dip. Fisica FE Preliminary DCS technical specifications (v1.0) for the Gigatracker.
V.Duk, INFN Perugia1 CHOD/NHOD status Viacheslav Duk, INFN Perugia Ferrara,
Walter Snoeys – CERN – PH – ESE – ME –TOTEM June 2008 Electronics WG Report TOTEM Electronics’ Status.
FTK crates, power supplies and cooling issues 13/03/20131FTK-IAPP workshop - A. Lanza  Racks, crates and PS: requirements  Wiener crates  Rittal crates.
LKr status R. Fantechi.
Production Firmware - status Components TOTFED - status
T1 Electronic status Conclusions Electronics Cards:
The Software Framework available at the ATLAS ROD Crate
How to Fix Android File Transfer Not Working on Mac?
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
ZDD status BESIII Collaboration Meeting, September 2012
CSC Electronics Installation and Commissioning Oct ‘06
Presentation transcript:

DAQ Status

F.S. Cafagna, Coll. Meeting 16 March Hardware  In 555, one equipped crate for VME readout  top crate  9U crate  Power Supply  FAN tray  VN2738  CAEN PCI  bot crate  6U/9U crate  Power Supply  FAN tray  V2718  CAEN PCI  TTCCi  FEC  locker  V1718 (USB)  2x V2718

F.S. Cafagna, Coll. Meeting 16 March Hardware  In IP5 one partially equipped crate (TTCci, FED and Opto-rx missing):  6U/9U crate  9U crate  2x Power Supply  2x FAN tray  V1718 (USB)  V2718 (PCI)  FEC  2x mFEC  1x FEDKIT  1x 64bit PC (not in the CMS network)  There should be a TTCci labeled as TOTEM-CASTOR  One CAEN PCI card in the online PC to be replaced

F.S. Cafagna, Coll. Meeting 16 March Hardware  In H8 there are two working system. One with VME readout, the other with S-Link readout (old version):  2 6U/9U crates to be return to El Pool  rack RA0626  6U/9U crate  Power Supply  FAN tray  V2718  CAEN PCI  TTCci  FEC  1x mFEC  TOTFED  OPTO-RX  1x FEDKIT  1x 64bit PC  rack RA  6U/9U crate  Power Supply  FAN tray  V2718  CAEN PCI  TTCci (From Bari)  FEC (From Bari)  1x mFEC  TOTFED  OPTO-Rx  1x 64bit PC

F.S. Cafagna, Coll. Meeting 16 March Hardware  At the moment we have 3 working system at CERN, 1 in Genova (?)  There are 2 “half system” (TTCci & FEC are missing)  We have no more FEC & TTCci. We “sacrificed” the test system in Bari for the latest H8 installation.

F.S. Cafagna, Coll. Meeting 16 March Activities  Full support to the detectors in 555 and H8 (Everybody)  Opto-RX firmware maintenance and test (Michele)  Support to test activities in 555 (Ervin, Juha, Michele)  Software development for VME readout (Ervin, Juha)

F.S. Cafagna, Coll. Meeting 16 March Future Activities  Support to the detectors (as usual)  IP5 system review, repair and new software & hardware deployment. (PC OSs have been updated in IP5... )  Debug and test of VME firmware  Development of DCS interface (we plan to set-up a test environment in 555)

F.S. Cafagna, Coll. Meeting 16 March Conclusion  Detector support is draining all the manpower.  No hardware to setup any other system even in IP5.  To be ready in IP5 we need to:  Deploy the software in the new OS  Find: TTCci & FEC  Is it the interface to DCS mandatory ?  There are no resources for software development until we have to support all those system and activities.